CUMMULATIVE
SOLAR-MAP-2016-DRAFT-By-Ankit
SOLAR-MAP-2016-DRAFT-By-Ankit
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MODULE<br />
MANUFACTURER’S<br />
STATE INSTALLED<br />
CAPACITIES<br />
ANDHRA PRADESH<br />
Access Solar Ltd Hyderabad 18<br />
Daksh Energy Systems Hyderabad<br />
Aditi Solar Pvt Ltd Hyderabad<br />
Akshaya Solar Power Hyderabad<br />
Pvt Ltd<br />
Premier Solar Systems Hyderabad 75<br />
Pvt Ltd<br />
Surana Ventures Ltd Hyderabad 40<br />
Surana Solar Hyderabad 120<br />
Sungrace Energy Hyderabad<br />
Solutions Pvt Ltd<br />
Photon Energy Hyderabad 90<br />
Systems Ltd<br />
Solar Semiconductor Hyderabad 195<br />
Pvt Ltd<br />
XL Energy Ltd Hyderabad 210<br />
JP Solar Hyderabad 20<br />
Microsol Power Hyderabad 14<br />
Radiant Solar Hyderabad 80<br />
Titan Energy Systems Secunderabad 100<br />
Ltd<br />
India Renewables Secunderabad<br />
Andromeda Energy Secunderabad 30<br />
Technologies Pvt Ltd<br />
Greentek Secunderabad 25<br />
MAHARASHTRA<br />
Agrawal Renewable Goa 40<br />
Energy Pvt Ltd<br />
Deshmuk Solar Energy Nasik<br />
Jain Irrigation Systems Jalgaon 55<br />
Ltd<br />
PLG Power Ltd Mumbai<br />
Banbury Solar<br />
Mumbai<br />
Chemtrols Solar Mumbai<br />
Waaree Energies Pvt Mumbai 500<br />
Ltd<br />
Rolta Power Pvt ltd Mumbai 60<br />
Anchor Electricals Mumbai<br />
Pvt Ltd<br />
JA Solar<br />
Mumbai<br />
Jinko Solar<br />
Mumbai<br />
Proinso<br />
Mumbai<br />
PV Power Technologies Mumbai 24<br />
Pvt Ltd<br />
Photonix Solar Pvt Ltd Pune 15<br />
Deityfuel Energy Pvt Pune 20<br />
Ltd<br />
Kirloskar Integrated Pune<br />
Technologies Ltd<br />
NEW DELHI<br />
Maharishi Solar New Delhi 20<br />
Technology Pvt Ltd<br />
Plaza Power<br />
New Delhi 20<br />
Infrastructure Co.<br />
Arratech Technologies New Delhi<br />
Pvt Ltd<br />
Darbari Green Energy New Delhi<br />
Systems Ltd<br />
Moser Baer India Ltd New Delhi 230<br />
Tapan Solar Energy Pvt New Delhi<br />
Ltd<br />
Alpex Exports Pvt Ltd New Delhi 100<br />
Aditya Clean Energy New Delhi<br />
Systems Pvt Ltd<br />
Rhine Solar Ltd New Delhi<br />
Innova Solar Systems New Delhi<br />
Pvt Ltd<br />
Bharat Heavy<br />
New Delhi 50<br />
Electricals Ltd<br />
Bluebird Solar New Delhi 20<br />
ANDS LITE Pvt. Ltd. New Delhi 15<br />
Gautam Solar Pvt Ltd New Delhi 25<br />
RAJASTHAN<br />
Ajit Solar Pvt Ltd Jaipur 35<br />
Rajasthan Electronics Jaipur 20<br />
& Instruments Ltd<br />
Solarmaxx Solar Jaipur 15<br />
Energy Solutions<br />
UTTAR PRADESH<br />
Central Electronics Ltd Sahibabad 50<br />
Seemac Photovoltaic Ghaziabad<br />
Pvt Ltd<br />
KERELA<br />
Ammini Solar Pvt Ltd Trivandrum<br />
HARYANA<br />
Lanco Solar Gurgaon 75<br />
Neosol Technologies Gurgaon<br />
Pvt Ltd<br />
Saatvik Green Energy<br />
Pvt. Ltd.<br />
Haryana<br />
STATEWISE SOLAR<br />
RPO REQUIREMENT<br />
AS ON 2021-22<br />
Andhra Pradesh<br />
Arunachal Pradesh<br />
Assam 801<br />
Bihar 2969<br />
Chhattishgarh 2171<br />
Delhi<br />
Goa 369<br />
Gujrat<br />
Haryana<br />
Himachal Pradesh 521<br />
Jammu & Kashmir 1319<br />
Jharkhand 500<br />
Karnataka<br />
1870<br />
Kerela 1429<br />
Maharashtra<br />
4030<br />
Madhya Pradesh 5636<br />
Manipur<br />
Mizoram<br />
Meghalaya<br />
Nagaland<br />
Odhisa<br />
Punjab<br />
Rajashthan<br />
Sikkim<br />
Tamil Naidu<br />
Telangana<br />
Tripura<br />
Uttrakhand<br />
Uttar Pradesh<br />
West Bengal<br />
Chandigarh<br />
Daman & Diu<br />
Dadar & Nagar Haveli<br />
Puducherry<br />
42<br />
118<br />
76<br />
182<br />
60<br />
5<br />
123<br />
50<br />
189<br />
YEARWISE <strong>CUMMULATIVE</strong> TARGET<br />
TO ACHIEVE 100 MW GRID<br />
CONNECTED SOLAR POWER PROJECT<br />
BY THE YEAR 2021-22<br />
561<br />
502<br />
229<br />
5357<br />
2200<br />
5961<br />
3917<br />
4603<br />
Yearly Target<br />
9403<br />
4457<br />
12611<br />
6556<br />
8903<br />
13248<br />
SOLAR RPO<br />
REQUIRED<br />
(2021-22)<br />
18000<br />
16000<br />
14000<br />
12000<br />
10000<br />
8000<br />
6000<br />
4000<br />
2000<br />
EQ Solar Map Of India 6TH EDITION<br />
MADHYA PRADESH<br />
RAJASTHAN<br />
3251 MW<br />
Bhadla, Jaisalmer, Jodhpur<br />
08%<br />
2015-16<br />
HIMACHAL PRADESH<br />
2750 MW<br />
Rewa, Shajapur, Morena<br />
2016-17<br />
GUJRAT<br />
700 MW<br />
Banaskantha<br />
YEARLY TARGET (in MW)<br />
2,000<br />
MAHARASHTRA<br />
1500 MW<br />
Beed, Dhule<br />
FOR<br />
EACH<br />
PROJECT<br />
15,000<br />
1000 MW<br />
Spiti Valley<br />
HARYANA<br />
500 MW<br />
Hisar, Bhiwani, Mahendergarh<br />
12,000<br />
KARNATAKA<br />
2017-18<br />
2000 MW<br />
Tumkur<br />
KERELA<br />
200 MW<br />
Kasargode<br />
16,000<br />
2018-19<br />
17,000<br />
2019-20<br />
JAMMU & KASHMIR<br />
17,500<br />
2020-21<br />
100 MW<br />
Samba<br />
2021-22<br />
ANDHRA PRADESH<br />
4000 MW<br />
Anantpuramu, kurnool,<br />
kadapa, anantpur<br />
TAMIL NADU<br />
500 MW<br />
RAMANATHAPURAM<br />
17,500<br />
Year<br />
UTTARAKHAND<br />
Yearly Target<br />
50 MW<br />
Kashipur<br />
1000000<br />
80000<br />
70000<br />
60000<br />
50000<br />
40000<br />
30000<br />
20000<br />
10000<br />
UTTAR PRADESH<br />
600 MW<br />
Jalaun, Allahabad,<br />
Mirzapur & Kanpur<br />
CHHATTISHGARH<br />
NOTE<br />
500 MW<br />
2015-16<br />
TELANGANA<br />
500 MW<br />
Mehboobnagar<br />
CUMULATIVE TARGET (in MW)<br />
5,000<br />
2016-17<br />
32,000<br />
17,000<br />
WEST BENGAL<br />
2017-18<br />
500 MW<br />
BANKURA<br />
ORRISA<br />
1000 MW<br />
ASSAM<br />
69 MW<br />
Amguri, Sibsagar<br />
ALL RIGHTS RESERVED.<br />
COPYRIGHT @ FIRST SOURCE<br />
ENERGY PVT. LTD.<br />
-UPDATED TILL 31 MAY 2016<br />
MNRE has approved 33<br />
solar parks in 21 states<br />
with 19.9 GW capacity<br />
48,000<br />
2018-19<br />
2019-20<br />
MEGHALAYA<br />
20 MW<br />
Jaintia<br />
65,000 82,500<br />
2020-21<br />
ARUNACHAL<br />
PRADESH<br />
100 MW<br />
Lohit<br />
NAGALAND<br />
2021-22<br />
60 MW<br />
SOURCE: MNRE,GOVERNMENT<br />
OF INDIA & SECI<br />
DESIGN & INFOGRAPHICS BY<br />
ANKIT PANDEY (Sahil)<br />
PUBLISHED BY :<br />
EQ<br />
INTERNATIONAL<br />
1 Lakh<br />
Year<br />
Sl. No. STATE CAPACI-<br />
TY (MW)<br />
1 Andhra<br />
Pradesh<br />
2 Andhra<br />
Pradesh<br />
3 Andhra<br />
Pradesh<br />
4 Andhra<br />
Pradesh<br />
SOLAR PARKS FUNDING & CAPACITY LISTING<br />
NAME OF THE SOLAR<br />
POWER PARKS DEVELOP-<br />
ER (SPPD)<br />
FOR MORE INFORMATION VISIT US at<br />
LAND IDENTIFIED AT<br />
WWW.EQMAGPRO.COM<br />
GRAND<br />
TOTAL<br />
(Rs. in Cr.)<br />
1500 NP Kunta of Anantpuramu & 135.25<br />
Galiveedu of Kadapa Districts<br />
1000 Kurnool District 90.25<br />
1000 Galiveedu Madal, Kadapa district<br />
500 AP Solar Power Corporation<br />
Pvt. Ltd., JVC of SECI, AP-<br />
GENCO and NREDCAP<br />
Talaricheruvu Village,<br />
Tadipathri Mandal, Anathapuramu<br />
District<br />
of Andhra Pradesh<br />
Tezu township in Lohit district 0.25<br />
5 Arunachal<br />
Pradesh<br />
100 Arunachal Pradesh Energy Development<br />
Agency (APEDA)<br />
6 Assam 69 JVC of APDCL & APGCL Amguri in Sibsagar district<br />
7 Chhattisgarh 500 Chhattisgarh Renewable Energy<br />
Rajnandgaon, Janjgir Champa dis-<br />
0.25<br />
Development Agency<br />
tricts<br />
8 Gujarat 700 Gujarat Power Corporation Radhanesda, Vav, Distt. Banaskantha 33.1135<br />
Limited<br />
9 Haryana 500 Saur Urja Nigam Haryana Ltd Bugan in Hisar district, Baralu and 0.25<br />
(SUN Haryana)<br />
Singhani in Bhiwani district and<br />
Daukhera in Mahindergarh district<br />
10 Himachal 1000 HP State Electricity Board Ltd. Spiti Valley of Lahaul & Spiti District 0.25<br />
Pradesh<br />
11 Jammu & 100 Jammu and Kashmir Energy<br />
Mohagarh and Badla<br />
Kashmir<br />
Development Agency<br />
Brahmana, District-Samba<br />
12 Karnataka 2000 Karnataka Solar Power Development<br />
Pavagada taluk<br />
100.25<br />
Corporation Pvt. Ltd.<br />
Tumkur dist.<br />
13 Kerala 200 Renewable Power Corporation<br />
Paivalike, Meenja,<br />
2.25<br />
of Kerala Limited Kinanoor, Kraindalam and Ambalathara<br />
villages of Kasargode district<br />
14 Madhya 750 Rewa Ultra Mega Solar Limited Gurh, Rewa, MP 37.75<br />
Pradesh<br />
15 Madhya 1000 Rewa Ultra Mega Solar Limited Neemuch, Agar and<br />
1.5<br />
Pradesh<br />
Mandsaur<br />
16 Madhya 500 Rewa Ultra Mega Solar Limited Rajgarh and Shajapur<br />
Pradesh<br />
17 Madhya 500 Rewa Ultra Mega Solar Limited Chhattarpur and Morena<br />
Pradesh<br />
18 Maharashtra 500 M/s Pragat Akshay Urja Ltd Sakri, Dhule district of<br />
0.25<br />
Maharashtra<br />
19 Maharashtra 500 Maharashtra State Electricity<br />
Dondaicha, district Dhule, Maharash-<br />
0.25<br />
Generating Company Ltd.<br />
tra<br />
(MAHAGENCO)<br />
20 Maharashtra 500 M/s K. P. Power Pvt. Ltd Taluka Patoda, district Beed, Maharashtra<br />
0.25<br />
21 Meghalaya 20 Meghalaya Power Generation West Jaintia Hills & East Jaintia Hills 0.25<br />
Corporation Ltd (MePGCL)<br />
districts<br />
22 Nagaland 60 Directorate of New & Renewable<br />
Dimapur, Kohima and New Peren 0.25<br />
Energy, Nagaland<br />
districts<br />
23 Odisha 1000 Green Energy Development<br />
Corporation of Odisha Limited<br />
Balasore, Keonjhar,<br />
Deogarh, Boudh, Kalahandi and<br />
Angul<br />
24 Rajasthan 680 Rajasthan Solar Park Bhadla Phase II, Bhadla, Rajasthan 61.45<br />
Development Company Ltd.<br />
25 Rajasthan 1000 Surya Urja Company of<br />
Rajasthan Ltd<br />
Bhadla Phase III, Bhadla, Rajasthan 46.15<br />
26 Rajasthan 750 M/s Essel Surya Urja Company<br />
of Rajasthan Limited<br />
27 Rajasthan 500 M/s Adani Renewable Energy<br />
Park Rajasthan Limited<br />
28 Rajasthan 421 M/s Adani Renewable Energy<br />
(321 MW<br />
Park Rajasthan Limited<br />
through<br />
support of<br />
GoI out of<br />
1500 MW)<br />
29 Telangana 500 Telangana New & Renewable<br />
Energy Development Corporation<br />
Ltd. (TNREDC)<br />
30 Uttar<br />
Pradesh<br />
600 Lucknow Solar Power<br />
Development Corporation Ltd.<br />
31 Uttarakhand 50 State Industrial Development<br />
Corporation Uttarakhand Limited<br />
(SIDCUL)<br />
32 West Bengal 500 West Bengal State Electricity<br />
Distribution Company Ltd.<br />
Villages Ugraas, Nagnechinagar &<br />
Dandhu, tehsil Phalodi, dist Jodhpur<br />
(450 MW) and villages Lavan & Purohitsar,<br />
tehsil Pokaran, dist Jaisalmer<br />
(300 MW)<br />
Bhadla Phase IV, Bhadla, Jodhpur<br />
Rajasthan<br />
Fatehgarh & Pokaran, Jaisalmer, Rajasthan<br />
0.25<br />
0.25<br />
0.25<br />
Gattu, Mehboob Nagar Distt. 2.75<br />
Jalaun, Allahabad, Mirzapur and<br />
Kanpur<br />
Dehat districts<br />
Industrial Area, Sitarganj (Phase I),<br />
Industrial Area, Sitarganj (Phase II)<br />
and Industrial Area, kashipur<br />
East Mednipur, West<br />
Mednipur, Bankura<br />
33 Tamil Nadu 500 To be finalized Initially proposed in<br />
Ramanathapuram district. Site under<br />
revision.<br />
TOTAL 20000<br />
20.976<br />
0.25<br />
0.25
Northern Region<br />
2450<br />
4149<br />
SHP (MW)<br />
0 5000 10000 15000 20000 25000 30000 35000<br />
DELHI<br />
2762<br />
8600<br />
HARYANA<br />
4142<br />
TENTATIVE STATE-WISE BREAK-UP OF RENEWABLE POWER TARGET TO BE ACHIEVED BY THE YEAR 2022.<br />
SO, THAT CUMULATIVE ACHIEVEMENT IS 1,75,000 MW<br />
BIOMASS POWER (MW)<br />
25<br />
WIND POWER (MW)<br />
209<br />
HIMACHAL PRADESH<br />
776 1500<br />
JAMMU & KASHMIR<br />
1155<br />
150<br />
RAJASHTHAN<br />
5762 8600<br />
SOLAR POWER (MW)<br />
UTTARAKHAND<br />
900<br />
700<br />
CHANDIGARH<br />
UTTAR PRADESH<br />
10697<br />
25<br />
4772<br />
31120<br />
3499<br />
PUNJAB<br />
MOUNTING STRUCTURES STATE CITY<br />
Nextech Electronics Pvt Ltd Karnataka Bangalore<br />
NEPC Tamil Nadu Chennai<br />
Infiniteercam Tamil Nadu Chennai<br />
Mounting Systems GmbH Germany Germany<br />
Schletter GmbH Germany Germany<br />
Good Luck Steel Tubes Ltd Uttar Pradesh Ghaziabad<br />
Nuevosol Energy Pvt Ltd Andhra Pradesh Hyderabad<br />
Pennar Engineered Building Systems Andhra Pradesh Hyderabad<br />
SmartTrack Solar Systems Pvt Ltd Andhra Pradesh Hyderabad<br />
ACE Infrastructure Pvt Ltd Maharashtra Mumbai<br />
Jurchen Technology India Pvt Ltd Maharashtra Mumbai<br />
Satec Envir Engineering Maharashtra Mumbai<br />
Sun Mount Engineering LLP Maharashtra Mumbai<br />
Thakkarson Roll Forming Pvt Ltd Maharashtra Mumbai<br />
Scorpius Trackers Pvt. Ltd. Maharashtra Pune<br />
Tata Blue Scope Maharashtra Pune<br />
Ganges Internationale Pvt Ltd New Delhi New Delhi<br />
Maruti Rub Plast Pvt Ltd New Delhi New Delhi<br />
153<br />
197<br />
50<br />
244<br />
Western Region<br />
SHP (MW)<br />
125<br />
2875<br />
BIOMASS POWER (MW)<br />
SOLAR POWER (MW)<br />
WIND POWER (MW)<br />
22600<br />
28410<br />
0 5000 10000 15000 20000 25000 30000<br />
Southern Region<br />
2612<br />
SHP (MW)<br />
1675<br />
BIOMASS POWER (MW)<br />
SOLAR POWER (MW)<br />
WIND POWER (MW)<br />
26531<br />
28200<br />
0 5000 10000 15000 20000 25000 30000<br />
OTHER STATES<br />
SOLAR POWER<br />
04<br />
27<br />
ANDAMAN &<br />
NICOBAR ISLANDS<br />
SHP<br />
600<br />
OTHER NEW<br />
STATES<br />
LAKSHADWEEP<br />
BIOMASS POWER<br />
120<br />
OTHER NEW<br />
STATES<br />
ALL INDIA<br />
SOLAR POWER<br />
GUJRAT<br />
GOA<br />
DAMAN & DIU<br />
D. & N. HAVELI<br />
MAHARASHTRA<br />
CHHATTISHGARH<br />
MADHYA PRADESH<br />
SHP<br />
GUJRAT<br />
CHHATTISHGARH<br />
MADHYA PRADESH<br />
MAHARASHTRA<br />
0 1000 2000 3000 4000 5000<br />
PUNJAB 500 MW STATE TENDER<br />
BIDDING RESULTS<br />
358<br />
SOLAR POWER<br />
TAMILNADU<br />
KARNATAKA<br />
ANDHRA PRADESH<br />
PUDUCHERRY<br />
KERELA<br />
SHP<br />
KARNATAKA<br />
KERELA<br />
TAMILNADU<br />
200000<br />
150000<br />
100000<br />
50000<br />
Sl. No Company Name<br />
Allocated<br />
Capacity<br />
Price Depreciation<br />
24 photon 50 5.09 ND<br />
25 photon 50 5.27 ND<br />
26 photon 50 5.57 ND<br />
12 azure 50 5.62 AD<br />
13 azure 50 5.63 ND<br />
14 azure 50 5.64 ND<br />
3 prayanta 50 5.8 AD<br />
4 prayanta 50 5.95 AD<br />
22 mytrah 50 5.97 ND<br />
32 Hindustan Clean Energy 50 5.98 AD<br />
0<br />
199<br />
1783<br />
8020<br />
25<br />
246<br />
449<br />
25<br />
5675<br />
50<br />
11926<br />
25<br />
8884<br />
5697<br />
1870<br />
9834<br />
75<br />
1500<br />
100<br />
BIOMASS POWER (MW)<br />
SHP (MW) 5000<br />
WIND POWER (MW)<br />
SOLAR POWER (MW)<br />
WIND POWER<br />
GUJRAT<br />
MADHYA<br />
PRADESH<br />
MAHARASHTRA<br />
BIOMASS POWER<br />
288<br />
8800 6200<br />
7200<br />
118 2469<br />
0 1000 2000 3000 4000 5000<br />
GUJRAT<br />
MAHARASHTRA<br />
MADHYA PRADESH<br />
WIND POWER<br />
TELANGANA<br />
KARNATAKA<br />
TAMIL NADU<br />
ANDHRA PRADESH<br />
BIOMASS POWER<br />
KARNATAKA<br />
TAMILNADU<br />
ANDHRA PRADESH<br />
2000<br />
8100 6200<br />
543<br />
11900<br />
1420<br />
649<br />
0 1000 2000 3000 4000 5000<br />
10000<br />
North Eastern Region<br />
615<br />
SOLAR POWER (MW)<br />
SHP (MW)<br />
1205<br />
0 300 600 900 1200 1500<br />
Eastern Region<br />
SHP (MW)<br />
135<br />
SOLAR POWER (MW)<br />
SOLAR POWER<br />
12237<br />
ASSAM<br />
MANIPUR<br />
MEGHALAYA<br />
NAGALAND<br />
TRIPURA<br />
ARUNACHAL PRADESH<br />
MIZORAM<br />
SHP<br />
0 3000 6000 9000 12000 15000<br />
ASSAM<br />
MEGHALAYA<br />
NAGALAND<br />
ARUNACHAL PRADESH<br />
MIZORAM<br />
15<br />
50<br />
25<br />
25<br />
663<br />
72<br />
39<br />
SOLAR POWER<br />
BIOMASS POWER (MW)<br />
244 BIOMASS POWER<br />
BIHAR<br />
244<br />
60000<br />
08%<br />
99533<br />
ANDHRA PRADESH<br />
400 MW NSM PH II VGF SECI’s TENDER<br />
BIDDER’S NAME TARIFF BIDDER’S<br />
VGF<br />
QUANTITY<br />
FRV Solar Holding XI BV 4.43 2 4450000<br />
Acme Solar Holdings Pvt.Ltd. 4.43 3 5500000<br />
Tata Power Renewable Energy Ltd. 4.43 2 7399990<br />
Azure Power India Pvt.Ltd. 4.43 4 7449989<br />
Rattan India Solar 3 Ltd. 4.43 1 7474980<br />
Renew Solar Power Pvt.Ltd. 4.43 4 9700000<br />
105<br />
BIHAR<br />
JHARKHAND<br />
ORISSA<br />
WEST BENGAL<br />
SIKKIM 36<br />
SHP<br />
BIHAR<br />
JHARKHAND<br />
WEST BENGAL<br />
SIKKIM<br />
THE POLICY HAS PROVISION FOR-<br />
SWG CLEANTECH<br />
WINS 350 MW<br />
NTPC AP<br />
COMPANY PER KWH<br />
SBG Cleantech 4.63<br />
Yarrow 4.64<br />
Infrastructure<br />
Azure Power 4.76<br />
Reliance power 4.88<br />
Renew Power 5.17<br />
Trina Solar 5.18<br />
First Solar 5.34<br />
ALL RIGHTS RESERVED<br />
500<br />
61<br />
161<br />
105<br />
0 1000 2000 3000 4000 5000<br />
2493<br />
10<br />
25<br />
1995<br />
OF SOLAR<br />
RPO BY<br />
THE YEAR<br />
2022.<br />
2377<br />
5336<br />
SOURCE : SECRETARY, MNRE , GOVERNMENT OF INDIA ( * ALL FIGURES ARE IN MW)<br />
Bidder’s Name Tariff Bidder’s Quantity<br />
FRV Solar 4.43 2<br />
Holding XI BV<br />
Acme Solar 4.43 3<br />
Holdings Pvt.Ltd.<br />
Tata Power Renewable<br />
4.43 2<br />
Energy Ltd.<br />
Azure Power 4.43 4<br />
India Pvt.Ltd.<br />
Rattan India 4.43 1<br />
Solar 3 Ltd.<br />
Renew Solar<br />
Power Pvt.Ltd.<br />
4.43 4<br />
COPYRIGHT @ FIRST SOURCE ENERGY PVT. LTD.<br />
50<br />
50<br />
0 1000 2000 3000 4000 5000<br />
LIST OF TALUKWISE BIDDERS PARTICIPATED<br />
IN 290MW KARNATAKA TENDER<br />
TALUK NAME DISTRICT<br />
NAME<br />
BIDDER NAME<br />
CAPACITY<br />
(MW)<br />
Byadagi Haveri Adani Green Energy 20<br />
Byadagi Haveri Essel Green Energy Pvt Ltd 20<br />
Channapatanna Ramanagara Adani Green Energy 20<br />
Chikkabalapura Chikkabalapura Krishi Technologies Pvt Ltd 10<br />
Doddaballapura Bengaluru rural Adani Green Energy 20<br />
Doddaballapura Bengaluru rural Asian Fab Tech Ltd 10<br />
Gubbi Tumkuru Adani Green Energy 20<br />
Gubbi Tumkuru Asian Fab Tech Ltd 10<br />
Holenarasipura Hassan Adani Green Energy 20<br />
Holenarasipura Hassan Bhoruka Power Corporation Limited 10<br />
Hunagund Bagalkot 0<br />
Jevargi Kalburgi Adani Green Energy 20<br />
Jevargi Kalburgi Bhoruka Power Corporation Limited 20<br />
Jevargi Kalburgi Dosti Realty Ltd 10<br />
Jevargi Kalburgi Essel Green Energy Pvt Ltd 20<br />
Jevargi Kalburgi Karvy Consultants Ltd 10<br />
Jevargi Kalburgi Shapoorji Pallonji Infrastructure Capital Company<br />
20<br />
Pvt Ltd<br />
K R Pet Mandya Adani Green Energy 20<br />
K R Pet Mandya Asian Fab Tech Ltd 10<br />
K R Pet Mandya Bhoruka Power Corporation Limited 15<br />
K R Pet Mandya Essel Green Energy Pvt Ltd 20<br />
K R Pet Mandya Hero Solar Energy Pvt Ltd 20<br />
K R Pet Mandya Waa Solar Pvt Ltd 10<br />
Magadi Ramanagar Adani Green Energy 20<br />
Magadi Ramanagar Asian Fab Tech Ltd 10<br />
Maaluru Kolar Adani Green Energy 20<br />
Maaluru Kolar Asian Fab Tech Ltd 8<br />
Maaluru Kolar Essel Green Energy Pvt Ltd 20<br />
Maaluru Kolar Karvy Consultants Ltd 10<br />
Mayakonda Davanagere 0<br />
Periyapattana Mysuru Adani Green Energy 20<br />
Periyapattana Mysuru Essel Green Energy Pvt Ltd 20<br />
Raibagh Belagavi 0<br />
Ramanagara Ramanagar Adani Green Energy 20<br />
Ramanagara Ramanagar Asian Fab Tech Ltd 6<br />
T Narasipura Mysuru Adani Green Energy 20<br />
T Narasipura Mysuru Shah Borthers Diamond Pvt Ltd 5<br />
Tipatturu Tumkur Adani Green Energy 20<br />
Tipatturu Tumkur Asian Fab Tech Ltd 10<br />
Tipatturu Tumkur Bhoruka Power Corporation Limited 10<br />
Tipatturu Tumkur Essel Green Energy Pvt Ltd 20<br />
Tipatturu Tumkur Hero Solar Energy Pvt Ltd 20<br />
Tipatturu Tumkur Jindal Amuminum Ltd 10<br />
Tipatturu Tumkur Waa Solar Pvt Ltd 10<br />
TOTAL 634<br />
UP 215 MW STATE TENDER BIDDER RESULTS<br />
S.NO COMPANY PROJECT<br />
SIZE<br />
“Cumulative<br />
Capacity”<br />
Open<br />
Tariff<br />
1 Essel Infraproject Ltd - First Bid 50 50 7.02<br />
2 Surana Telecom & Power 5 55 7.4<br />
3 Sudhakar Infratech Pvt Ltd 5 60 7.68<br />
4 Lohia Developers (I) Pvt Ltd 5 65 7.95<br />
5 Ferromar Shipping Pvt Ltd 5 70 8.09<br />
6 Sukhbir Agro Energy Ltd - Third Bid 20 90 8.23<br />
7 Technical Associates 10 100 8.33<br />
8 Sahasradhara Energy Pvt Ltd 5 105 8.37<br />
9 Sukhbir Agro Energy Ltd - First Bid 20 125 8.43<br />
10 Adani Green Energy Ltd -First Bid 50 175 8.44<br />
11 Avadh Rubber Pvt Ltd 5 180 8.44<br />
12 Pinnacle Air Pvt Ltd (consortium with Jackson Power) 5 185 8.44<br />
13 NP Agro (India) Pvt. Ltd. 5 190 8.496<br />
14 Shri Radhe Radhe Pvt Ltd 25 215 8.6<br />
15 Sukhbir Agro Energy Ltd - Second Bid 20 235 8.6<br />
NTPC RAJASTHAN SOLAR PARK BID-TENDER RESULTS (OPEN)<br />
S.No. Bidder’s Name Quoted Value Loaded Value Bidder’s Quantity Bid-Value<br />
1 Fortum Finnsurya Energy 4.34 4.34 1 16.22%<br />
Pvt. Ltd.<br />
2 Rising Sun Energy Pvt. 4.35 4.35 2 16.02%<br />
Ltd.<br />
3 Solairedirect Energy India 4.35 4.35 2 16.02%<br />
Pvt. Ltd.<br />
4 Yarrow Infrastructure Ltd. 4.36 4.36 3 15.83%<br />
PUBLISHED BY :<br />
EQ<br />
INTERNATIONAL<br />
FOR MORE INFORMATION VISIT US at<br />
WWW.EQMAGPRO.COM
KARNATAKA STATE TENDER<br />
1200 MW IN 60 TALUKS. (BIDS RECEIVED AND ALLOTTED FOR 910 MW LIMITING THE TARIFF TO RS. 5.50 UNDER<br />
GENERAL AND RS. 6.10 UNDER MODEL MANUFACTURER UNDER CATEGORY )<br />
Company Name Capacity MW. Tariff ESCOM Taluk District<br />
Hero Solar Energy Pvt Ltd 20 4.69 BESCOM Madhugiri Tumkur<br />
Aditya Birla Nuvo Ltd 20 4.86 BESCOM Mulbagal Kolar<br />
AMPL Cleantech Pvt Ltd 20 4.89 BESCOM Holalkere Chitradurga<br />
Growthstreet Consultants Pvt Ltd 4 4.89 BESCOM Harapanahalli Davanagere<br />
OPG Power Generation Pvt Ltd 20 4.97 BESCOM Hosadurga Chitradurga<br />
GRT Jewellers Pvt Ltd 20 4.98 BESCOM Kannakapura Ramanagara<br />
Renew Solar Power Pvt Ltd 20 5.05 BESCOM Honnali Davanagere<br />
OPG Power Generation Pvt Ltd 2 5.07 BESCOM Harapanahalli Davanagere<br />
Asian Fab Tech Ltd 20 5.19 BESCOM Gowribidanuru “Chikkaballapura”<br />
Asian Fab Tech Ltd 15 5.19 BESCOM Nagamangala Mandya<br />
Hero Solar Energy Pvt Ltd 20 4.69 BESCOM Chikkanayakanahal Tumkur<br />
Renew Solar Power Pvt Ltd 20 4.84 BESCOM Turuvekere Tumkur<br />
Rishabh Buildwell Pvt Ltd 14 4.95 HESCOM Harapanahalli Davanagere<br />
Rays Power Expert Pvt Ltd 10 5.04 HESCOM Chikkabalapura “Chikkabalapura”<br />
Hero Solar Energy Pvt Ltd 20 4.69 MESCOM Koratagere Tumkur<br />
Sunedison Solar Power India Pvt Ltd 20 5.47 MESCOM Bangarpet+KGF Kolar<br />
Hero Solar Energy Pvt Ltd 20 4.75 CESC Chamrajanagara “Chamrajanagara”<br />
Hero Solar Energy Pvt Ltd 20 4.79 CESC Kollegala+<br />
Chamrajnagar<br />
Hannur<br />
Hero Solar Energy Pvt Ltd 20 4.86 CESC Gundlupet Chamrajnagar<br />
Renew Solar Power Pvt Ltd 20 4.85 BESCOM Yadgiri Yadgiri<br />
Renew Solar Power Pvt Ltd 20 4.85 BESCOM Bhalki Bidar<br />
Renew Solar Power Pvt Ltd 20 4.84 BESCOM Chincholli Kalburgi<br />
Renew Solar Power Pvt Ltd 20 4.86 BESCOM Alland Kalburgi<br />
Parampujya Solar Energy Pvt Ltd 10 5.35 GESCOM Shorapur Yadgir<br />
Karvy Consultants Ltd 10 5.13 CESC Shorapur Yadgir<br />
Hero Solar Energy Pvt Ltd 20 4.69 GESCOM Shahpur Yadgir<br />
Hero Solar Energy Pvt Ltd 20 4.83 GESCOM Chittapura Kalburgi<br />
Renew Solar Power Pvt Ltd 20 4.76 MESCOM Devadurga Raichur<br />
Renew Solar Power Pvt Ltd 20 4.76 HESCOM Siraguppa Bellary<br />
Renew Solar Power Pvt Ltd 20 4.86 HESCOM Humnabad Bidar<br />
Hero Solar Energy Pvt Ltd 20 4.69 GESCOM Gangavati Koppalaa<br />
Essel Green Energy Pvt Ltd 20 5.20 BESCOM Indi Vijayapura<br />
Marikal Solar Parks Pvt Ltd 20 5.48 BESCOM Basavanabagevadi Vijayapura<br />
Mytrah Energy (India)Ltd 15 5.44 BESCOM Sindagi Vijayapura<br />
Essel Green Energy Pvt Ltd 20 5.30 BESCOM Bijapura+Nagatana Vijayapura<br />
Marikal Solar Parks Pvt Ltd 20 5.48 CESC Naragund Gadag<br />
Marikal Solar Parks Pvt Ltd 20 5.46 GESCOM Chikkodi Belgaum<br />
Essel Green Energy Pvt Ltd 5 5.50 GESCOM Sindagi Vijayapura<br />
OPG Power Generation Pvt Ltd 20 5.03 GESCOM Shiggaon Haveri<br />
Essel Green Energy Pvt Ltd 20 5.40 HESCOM Muddebihal Vijayapura<br />
Aditya Birla Nuvo Ltd 20 4.92 HESCOM Ramadurg Belagavi<br />
Aditya Birla Nuvo Ltd/ Suzlon<br />
20 4.97 HESCOM Shirahatti Gadag<br />
Structure Ltd<br />
OPG Power Generation Pvt Ltd 20 5.00 HESCOM Ron Gadag<br />
Sukbhir Solar Energy Pvt Ltd 5 5.50 CESC Nagamangala Mandya<br />
Jindal Aluminium Ltd. 10 5.50 BESCOM Mayakonda Davanagere<br />
Mytrah Energy (India)Ltd 15 5.50 HESCOM Hunagund Bagalkot<br />
Mytrah Energy (India)Ltd 15 5.50 GESCOM Raibagh Belagavi<br />
810<br />
MODULE MANUFACTURER CATEGORY<br />
Microsun Solar Tech Pvt Ltd 3 5.94 GESCOM Kanakagiri town in Koppalaa<br />
Gangavathi taluk<br />
Tata Power Solar System Limited 20 6.10 BESCOM Srinivasapura Kolar<br />
Tata Power Solar System Limited 17 6.10 HESCOM Kanakagiri town in Koppalaa<br />
Gangavathi taluk<br />
Emmvee Photovoltaic Power Pvt Ltd 10 6.10 MESCOM Kunigal Tumkur<br />
Emmvee Photovoltaic Power Pvt Ltd 20 6.10 BESCOM Bagepalli Chikkaballapura<br />
Swelect Energy Systems Ltd 10 6.10 CESC Kunigal Tumkur<br />
Tata Power Solar System Limited 10 6.10 BESCOM Bidar Rural<br />
Bidar<br />
Constituency<br />
Emmvee Photovoltaic Power Pvt Ltd 10 6.10 BESCOM Bidar Rural<br />
Bidar<br />
Constituency<br />
TOTAL 100<br />
GRAND TOTAL 910<br />
HARYANA STATE TENDER<br />
150 MW DCR<br />
Name of Bidder<br />
M/S Acme Solar<br />
Holding Pvt.Ltd.<br />
Tapas Solar Power Pvt.Ltd.<br />
Geeta Rani<br />
Deepak Goyal<br />
Ramphal Bhardwaj<br />
Jile Singh<br />
Urmilla Jain<br />
Mrs.Anita Singh<br />
Mr.Karan Singh<br />
Mr.Virendra Rawal<br />
Lintax Marketing Services<br />
Ltd.<br />
Narendra Singh<br />
Yogender<br />
Capacity Allocated<br />
140MW<br />
1mw<br />
1mw<br />
1mw<br />
1mw<br />
1mw<br />
1mw<br />
2mw<br />
4mw<br />
2mw<br />
1mw<br />
5mw<br />
5mw<br />
450 MW SOLAR PV POWER<br />
PROJECT MAHARASHTRA<br />
SECI VGF BASED<br />
Bhageria Industries 4.41 30<br />
Talettutayi Solar 4.43 50<br />
Projects<br />
Orange Renewable 4.43 100<br />
Sepset<br />
4.43 40<br />
Constructions<br />
Krishna<br />
4.43 10<br />
WindFarms<br />
AMPL Cleantech 4.43 50<br />
Welspun Renewable 4.43 100<br />
Energy Pvt.Ltd.<br />
Suzlon Energy Pvt.Ltd. 4.43 200<br />
Parampujya Solar<br />
Energy Pvt.Ltd.<br />
4.43 450<br />
NTPC AP 260 MW<br />
DCR EPC<br />
Bidder Price Alloted<br />
Size<br />
Vikram Solar 5.628 65<br />
Jackson 5.634 65<br />
Tata 5.64 65<br />
MP 250 MW<br />
NTPC EPC DCR<br />
Bidder Price Capacity<br />
Lanco Solar 5.641 100<br />
Vikram 5.646 50<br />
Solar<br />
BHEL 6.11 50<br />
Jackson 6.299 50<br />
TREND OF SOLAR TARIFF<br />
18.00<br />
13.00<br />
12.00<br />
11.00<br />
10.00<br />
9.00<br />
8.00<br />
7.00<br />
6.00<br />
5.00<br />
4.00<br />
(Rs./KWh)<br />
12.76<br />
10.95<br />
12.16<br />
9.39<br />
RPSSGP<br />
17.91<br />
9.28<br />
Gujrat p2,<br />
565 MW<br />
8.79<br />
7.49<br />
8.98<br />
7.00<br />
8.36<br />
8.73<br />
7.28<br />
9.50<br />
8.34<br />
8.5<br />
7.94<br />
12.45<br />
7.9<br />
8.5<br />
6.48<br />
6.45<br />
5.97<br />
14.5<br />
6.49<br />
6.45<br />
8.25<br />
6.49<br />
8.9<br />
8.41<br />
7.2<br />
15.99<br />
8.01<br />
8.75<br />
6.87 6.86<br />
5.5<br />
2010 2011 2012 2013 2014 2015 16<br />
NSM Batch 1, 150 MW<br />
Dec.<br />
2010<br />
12.54<br />
Gujrat p1,<br />
320 MW<br />
NSM Batch 2, 350 MW<br />
Dec.<br />
2011<br />
Orissa Phase 1, 25 MW<br />
Orissa Phase 2, 25 MW<br />
Karnataka, 60 MW<br />
Madhya Pradesh, 125 MW<br />
Tamil Nadu, 150 MW<br />
Rajasthan, 75 MW<br />
6.49<br />
Andhra<br />
Pradesh p1<br />
Andhra Pradesh , 226 MW<br />
Punjab Phase I , 270 MW<br />
UP Phase I , 130 MW<br />
9.33<br />
6.47<br />
Karntaka Phase I , 130 MW<br />
8.05<br />
6.97<br />
5.99<br />
**(7.03<br />
Levelized)<br />
5.25<br />
**(6.17 Level)<br />
M.P. Phase 2, 100 MW<br />
7.12<br />
Andhra Pradesh Phase 2,<br />
500 MW<br />
6.71<br />
5.75<br />
** (6.75 Level)<br />
Karnataka, 500 MW<br />
6.9<br />
6.46<br />
Telangana, 500 MW<br />
7.45<br />
7.56<br />
6.94 7.02<br />
6.88<br />
6.72<br />
5.051<br />
Punjab (Capacity 5-24 MW)<br />
100 MW<br />
Punjab (Capacity 25-100<br />
MW) 100 MW<br />
8.6<br />
7.17 7.16<br />
6.16<br />
*** (L1)<br />
5.49<br />
5.17<br />
5.09<br />
NTPC Anantapur , 250 MW<br />
Uttar Pradesh Phase 2, 215 MW<br />
5.57<br />
4.63<br />
Madhya Pradesh, 300 MW<br />
8.04<br />
5.87<br />
5.99<br />
5.98<br />
5.88<br />
5.641<br />
Telangana Group 1****, 500 MW<br />
Highest Bid<br />
(Rs./KWh)<br />
Lowest Bid<br />
(Rs./KWh)<br />
Weighted Avg.<br />
Price (Rs./KWh)<br />
5.73<br />
5.62 5.65 5.7<br />
5.12<br />
5 5.36<br />
5.1 5.0<br />
4.63 5.13 5.00<br />
4.78 4.78<br />
4.63 4.63<br />
4.78 4.63<br />
4.35 4.36 4.35<br />
Telangana Group 2****,1500 MW<br />
Punjab, 500 MW<br />
Uttarakhand , 170 MW<br />
AP-500 MW Bundling<br />
scheme******, 500 MW<br />
AP-500 MW Bundling<br />
scheme******, 350 MW<br />
AP-500 MW Bundling<br />
scheme (DCR)******, 150 MW<br />
Haryana(State scheme), 150 MW<br />
Mar. Dec. Apr. jun. Mar. Mar. Apr. Jun. Aug. Aug. Jan. Oct. Nov. Nov. Feb. Feb. May Jun. Jun. Aug. Aug.Sep. Oct. Nov. Dec. Dec. Dec. Jan.<br />
2012 2013 2014 2015 2016<br />
• 5% escalation for 10 years. • ** 3% escalation for 10 years. Separate L1 for 9 districts. • *** EPC Bids with Domestic content requirement. Capital subsidy of Rs. 1 Cr/MW.<br />
JHARKHAND STATE TENDER BIDDER RESULTS<br />
IN CATEGORY I & II<br />
CATEGORY I PROJECTS<br />
Name Of Bidder’s<br />
Capacity Offered Tariff<br />
Proposed After Discount<br />
(MW) (Rupees/kWh)<br />
M/s Madhav Infraprojects Ltd, Vadodara – I 10 5.2<br />
M/s Madhav Infraprojects Ltd, Vadodara – II 10 5.29<br />
M/s Suzlon Energy Ltd, Pune – I 15 5.37<br />
M/s Suzlon Energy Ltd, Pune – II 10 5.43<br />
M/s Renew Solar Power, Gurgaon – II 11 5.55<br />
M/s Renew Solar Power, Gurgaon – I 11 5.55<br />
M/s Karvy Solar Power Ltd, Banjara Hills, Hyderabad<br />
10 5.58<br />
– I<br />
M/s OPG Power Generation Pvt. Ltd, Chennai 25 5.59<br />
CATEGORY II PROJECTS<br />
Name of Bidders<br />
Capacity<br />
Proposed<br />
(MW)<br />
Offered Tariff<br />
After Discount<br />
(Rupees/kWh)<br />
M/s Renew Solar Power, Gurgaon – IV 35 5.08<br />
M/s Renew Solar Power, Gurgaon – III 35 5.12<br />
M/s Renew Solar Power, Gurgaon – X 45 5.16<br />
M/s Renew Solar Power, Gurgaon – XI 50 5.21<br />
M/s Renew Solar Power, Gurgaon – II 35 5.28<br />
M/s Renew Solar Power, Gurgaon – IX 45 5.28<br />
M/s OPG Power Generation Pvt. Ltd, Chennai – III 50 5.3<br />
M/s OPG Power Generation Pvt. Ltd, Chennai – II 49 5.31<br />
M/s Renew Solar Power, Gurgaon – XII 50 5.33<br />
M/s Suzlon Energy Ltd, Pune – I 50 5.36<br />
M/s Sunedision Solar Power, Chennai – I 50 5.39<br />
M/s Renew Solar Power, Gurgaon – V 40 5.39<br />
M/s Renew Solar Power, Gurgaon – VIII 45 5.4<br />
M/s Sunedision Solar Power, Chennai – II 50 5.43<br />
M/s Renew Solar Power, Gurgaon – VII 45 5.44<br />
M/s Suzlon Energy Ltd, Pune – II 50 5.45<br />
M/s Suzlon Energy Ltd, Pune – III 50 5.45<br />
M/s Adani Green Energy Ltd, Ahmedabad – I 50 5.45<br />
M/s Renew Solar Power, Gurgaon – I 30 5.45<br />
M/s Sunedision Solar Power, Chennai – III 50 5.47<br />
M/s Renew Solar Power, Gurgaon – VI 45 5.47<br />
M/s Acme Solar Holdings Pvt. Ltd,<br />
Gurgaon, Haryana - I<br />
50 5.48<br />
Fixed Tarrif<br />
KARNATAKA ALLOCATION OF LOA’s FOR 260 MWs IN 14 TALUKS<br />
Name of the Bidder Taluk District Capacity<br />
(in MW)<br />
Quoted<br />
tariff (in<br />
figures)<br />
Rajasthan-420 MW Bundling<br />
UP-100 MW Bundling<br />
Year<br />
ESCOM<br />
afer<br />
allocation<br />
Adani Green Energy Byadagi Haveri 20 4.79 HESCOM<br />
Adani Green Energy Channapatanna Ramanagara 20 4.79 HESCOM<br />
Krishi Technologies Pvt Ltd Chikkabalapura Chikkabalapura 10 5.35 HESCOM<br />
Asian Fab Tech Ltd Doddaballapura Bengaluru rural 10 5.28 BESCOM<br />
Adani Green Energy Gubbi Tumkuru 20 4.82 BESCOM<br />
Adani Green Energy Holenarasipura Hassan 20 4.79 BESCOM<br />
Adani Green Energy Jevargi Kalburgi 20 4.81 GESCOM<br />
Adani Green Energy K R Pet Mandya 20 4.84 BESCOM<br />
Adani Green Energy Maaluru Kolar 20 4.89 MESCOM<br />
Adani Green Energy Magadi Ramanagar 20 4.92 CESC<br />
Adani Green Energy Periyapattana Mysuru 20 4.93 GESCOM<br />
Adani Green Energy Ramanagara Ramanagara 20 5.17 BESCOM<br />
Adani Green Energy T Narasipura Mysuru 20 4.79 CESC<br />
Adani Green Energy Tipatturu Tumkur 20 4.84 BESCOM<br />
TOTAL MWs 260<br />
S.No.<br />
SUNEDISON WINS ENTIRE 500 MW IN AP AT RS.4.63<br />
FINAL BID PRICES FOR ANDHRA PRADESH TENDER<br />
Bidder’s Name<br />
Quoted<br />
Value<br />
Loaded<br />
Value<br />
Bidder’s<br />
Quantity<br />
Difference in %<br />
(Bid-Value vs<br />
Start-Price)<br />
1 SunE Solar B.V. 4.63 4.63 10 13.78%<br />
2 Yarrow Infrastructure Limited 4.63 4.63 10 13.78%<br />
3 FRV BV 4.77 4.77 1 11.17%<br />
4 SBG Cleantech Limited 4.79 4.79 10 10.80%<br />
5 Reliance CleanGen Limited 4.8 4.8 10 10.61%<br />
6 ReNew Solar Power Private Limited 4.85 4.85 5 9.68%<br />
7 Briona Power Private Limited 4.87 4.87 1 9.31%<br />
8 Acme Solar Holdings Private Limited 4.89 4.89 3 8.94%<br />
9 Orange Renewable Power Private 4.9 4.9 4 8.75%<br />
Limited<br />
10 Fortum Finnsurya Energy Private 5.05 5.05 2 5.96%<br />
Limited<br />
11 Solairedirect Energy India Pvt. Ltd. 5.05 5.05 2 5.96%<br />
12 Shapoorji Pallonji Infrastructure 5.06 5.06 4 5.77%<br />
Capital Company Pvt Ltd<br />
13 Mira Zavas Private Limited 5.07 5.07 2 5.59%<br />
14 Tata Power Renewable Energy Limited<br />
5.07 5.07 4 5.59%<br />
15 Essel Green Energy Private Limited 5.12 5.12 2 4.66%<br />
150 MW ANDHRA PRADESH NTPC DCR<br />
S.NO. BIDDER’ NAME BID<br />
PRICE<br />
BID QUANTITY<br />
(MW)<br />
ALLOTTED<br />
(MW)<br />
1 Azure Power India 5.12 100 100<br />
Pvt Ltd<br />
2 Prayatna Developers 5.13 150 50<br />
Pvt Ltd (Adani)<br />
3 Yarrow Infrastructure 5.14 50 Nil<br />
Limiyted (IndiaBulls)<br />
4 Hero Solar Energy 5.25 100 Nil<br />
Pvt Ltd<br />
5 ACME Solar Holding 5.36 50 Nil<br />
Pvt Ltd<br />
6 Tata Power Renewable<br />
5.41 150 Nil<br />
Energy Limited<br />
7 NEEPCO Ltd 5.7 50 Nil<br />
8 Greenko Energies 5.79 50 Nil<br />
Pvt Ltd<br />
9 ReNew Solar Power 5.99 50 Nil<br />
pvt Ltd<br />
10 SkyPower SouthEast<br />
Asia Holdings 2 Ltd<br />
6.62 100 Nil<br />
NTPC TENDER-RESULTS 150 MW AP<br />
DCR TENDER AZURE-ADANI<br />
WINS PROJECTS<br />
BIDDER’ NAME<br />
BID<br />
PRICE<br />
BID<br />
QUANTITY<br />
(MW)<br />
MADHYA PRADESH 300 MW STATE<br />
TENDER BIDDER RESULTS<br />
ALLOTTED (MW)<br />
Azure Power India 5.12 100 100<br />
Pvt Ltd<br />
Prayatna Developers 5.13 150 50<br />
Pvt Ltd (Adani)<br />
Yarrow Infrastructure 5.14 50 NIL<br />
Limiyted (IndiaBulls)<br />
Hero Solar Energy 5.25 100 NIL<br />
Pvt Ltd<br />
ACME Solar Holding 5.36 50 NIL<br />
Pvt Ltd<br />
Tata Power Renewable<br />
5.41 150 NIL<br />
Energy Limited<br />
NEEPCO Ltd 5.7 50 NIL<br />
Greenko Energies 5.79 50 NIL<br />
Pvt Ltd<br />
ReNew Solar Power 5.99 50 NIL<br />
pvt Ltd<br />
SkyPower SouthEast<br />
Asia Holdings 2 Ltd<br />
6.62 100 NIL<br />
TELANGANA 400 MW NTPC RESULT<br />
BIDDER’S<br />
NAME<br />
Quoted<br />
Value<br />
Loaded<br />
Value<br />
Bidder’s<br />
Quantity<br />
Renew Solar Power Pvt.Ltd. 4.66 4.66 10<br />
Karvy Consultants Ltd. 4.67 4.67 5<br />
Azure Power India Pvt.Ltd. 4.67 4.67 10<br />
Parampujya Solar Energy Pvt.Ltd. 4.67 4.67 5<br />
Acme Solar Holding Pvt.Ltd. 4.67 4.67 10<br />
Solarpack Corporation technologica 4.67 4.67 10<br />
Sociedad Limitada<br />
Mahindra Renewables Pvt.Ltd. 4.68 4.68 10<br />
Briona Power Pvt.Ltd. 4.71 4.71 5<br />
Hero Solar Energy Pvt.Ltd. 4.77 4.77 10<br />
Suzlon Energy Ltd. 5.09 5.09 10<br />
Orange Renewable Power Pvt.Ltd. 5.39 5.39 5<br />
Marikal Solar parks Pvt.Ltd. 5.57 5.57 6<br />
S.No Company<br />
Serial No<br />
Company Name Capacity Final<br />
Bid<br />
1 13 Sky Power 50 5.051<br />
2 13 Sky Power 50 5.109<br />
3 13 Sky Power 50 5.298<br />
4 95 Narbheram Vishram 20 5.38<br />
5 95 Narbheram Vishram 10 5.398<br />
6 65 Narendra Kumar Khanna 2 5.451<br />
7 67 Made Easy Education 10 5.452<br />
8 66 TrueCon Engineers 2 5.456<br />
9 64 Rays Expert 12 5.457<br />
10 48 Design Co 5 5.61<br />
11 78 Renew Solar 51 5.63<br />
12 43 Hero Solar Energy Pvt Ltd 50 5.641<br />
PUBLISHED BY :<br />
EQ<br />
3 Sun Edison 10 No 5.37 Yes<br />
AP-I 500 MW STATE TENDER PRICE<br />
BID OPENING<br />
S.No. Name No of projects AD Tariff Qualified<br />
1 Mira Javas (Trina) 2 No 5.21 Yes<br />
2 Marikal ( First Solar) 2 No 5.35 Yes<br />
ALL RIGHTS RESERVED<br />
COPYRIGHT @ FIRST SOURCE ENERGY PVT. LTD.<br />
INTERNATIONAL
TENDERING<br />
BY<br />
OVERALL STATUS OF TENDERING/PPA’S FOR COMMISSIONING IN 2016-17<br />
TENDERING<br />
CAPACITY<br />
(MW)<br />
(A) GOI SUPPORT<br />
REMARKS<br />
SECI 2670 “Under 2000 MW VGF Scheme<br />
a) Gujarat- 225 MW(Open)+25 MW(DCR)<br />
b) Maharashtra- 450 MW(Open)+50 MW(DCR) )(Bids of 450 MW opened)<br />
c) UP- 440 MW(open)<br />
d) AP- 500 MW(02-01-16)<br />
Total= 1690 MW tendered”<br />
“NTPC Ltd.<br />
( Developer<br />
mode)”<br />
“NTPC Ltd.<br />
( Own Projects)”<br />
“Foreign Currency<br />
Equated<br />
Tariff<br />
A) NTPC<br />
b) PTC”<br />
Other CPSU<br />
(Coal India,<br />
IREDA,<br />
THDC)<br />
Rooftop PV<br />
(SNAs and<br />
SECI ‘s )<br />
State<br />
1250 “1250 MW Under 5000 MW VGF<br />
Scheme of MNRE to be tendered by Jan 2016 subject to Cabinet Approval”<br />
100 “100 MW Project allotted and Under Canal-top/ bank scheme of MNRE.<br />
Total=64 MW tendered.”<br />
62.5 “62.5 MW SECI’s own projects<br />
Total=10MW tendered”<br />
3 “3 MW IPTPS, New Delhi, LOI issued on 07.10.2015<br />
Total= 3MW tendered.”<br />
3000 “Under 3000 MW Bundling Scheme of MNRE<br />
a) AP Solar park 50x10 = 500 MW (29-4-15), reverse acution- 03.11.2015, Entire capacity won by Sun Edison at Rs 4.63/<br />
kWh<br />
b) Rajasthan Solar Park 70x6= 420 MW (21-5-15),Technical Bid Open, Reverse auction-18/01/2016 Rs 4.34/kWh,4.35/<br />
kWh, 4.36/kWh<br />
c) AP Solar Park 350 MW single project - reverse acution- 14.12.2015, Entire capacity won by SB Cleantech at Rs 4.63/<br />
kWh 50x3 = 150 MW (DCR category) (21-5-15) Reverse acution- 15/12/2015, Rs 5.12/kWh&5.13<br />
d) Rajasthan 130 MW(open)+100 MW(DCR) =<br />
230 MW(21-05-” “2015)<br />
e) Karnataka 500 MW(Open)+100 MW(DCR)=<br />
600 W (28-08-2015)<br />
f) UP 100 MW(Open)- (12-08-2015)<br />
Reverse auction- 25.01.16, Rs 5.12/kWh<br />
g) Telangana-350 MW(open)+50 MW(DCR)<br />
(09-10-2015)<br />
Total = 2750 MW tendered Open-2600 MW,<br />
DCR-400 MW<br />
Solar park:2270 MW, Non Solar:<br />
730 MW”<br />
3020 “a) AP-250 MW(DCR)- Awarded on 29.04.2015<br />
b) MP- 250 MW(DCR)- 24/05/2015,<br />
(Reverse auction-Feb 2016)<br />
c) Rajasthan- 260 MW(DCR)- 24/05/15, (Reverse auction-Feb 2016) d) AP- 750 MW(open)- 21/08/15<br />
e) Karnataka- 1000 MW-25/01/16 (750 MW-open+ 250 MW-DCR)<br />
Total- 2510 MW tendered.<br />
(Open-1500 MW, DCR-1010 MW)”<br />
“1000<br />
1000”<br />
600 “a) 50 MW-IREDA by SECI<br />
b) 10 MW-VPT by SECI<br />
c) 200 MW-CIL by SECI<br />
d) 4 MW- New Mangalore port trust by SECI<br />
e) 10 MW- Paradip Port Trust by SECI<br />
f) 2 MW- OFB,Bhandara<br />
g) 5 MW- OFB,Ambajhari<br />
Total= 281 MW tendered<br />
(Open- 74 MW, DCR-207 MW)”<br />
1000 “a) 50 MW-CPWD by SECI-RESCO, Bids opened 07.12.2015<br />
Total= 50 MW tendered”<br />
EXPECTED<br />
COMMISSIONING IN<br />
2016- 17(MW)<br />
1600<br />
Total 13,705.5 Total= 7358 MW 6697<br />
(B) STATE GOVERNMENT<br />
Tendering<br />
Remark<br />
Capacity<br />
Punjab 500 MW “Financial Bid opened on<br />
07-09-2015. LOI issued<br />
on 19.10.2015 and PPA<br />
of 350 MW is signed and<br />
rest is under process.”<br />
Karnataka 300 MW Under Farmer scheme,<br />
PPA signed<br />
1200 MW Request for proposal<br />
(RFP) invited on<br />
20.11.2015. Technical Bid<br />
opened.<br />
Madhya 300 MW Financial Bids opened on<br />
Pradesh<br />
15.07.2015. PPA signed<br />
Telangana 2000 MW Financial Bids opened on<br />
03.08.2015. LOI issued.<br />
Haryana 150 MW Technical Bid opened.<br />
Financial Bid opened on<br />
07.12.2015. LOI issued.<br />
Uttar<br />
Pradesh<br />
215 MW “LOI issued on 09.09.2015<br />
and PPA<br />
signed.”<br />
Uttrakhand 170 MW Financial Bids opened on<br />
28.10.2015. LOI issued<br />
and process of signing of<br />
PPA.<br />
Andhra<br />
Pradesh<br />
500 MW “Tender issued by AP-<br />
GENCO on EPC<br />
basis. Technical bid<br />
opened on 30.11.2015.<br />
Under process of awarding<br />
the projects.”<br />
Expected<br />
commissioning in<br />
2016-17 (MW)<br />
500<br />
1000<br />
300<br />
2000<br />
150<br />
223<br />
191<br />
200<br />
Tamil Nadu 1284 MW Under Preferential Tariff, 700<br />
PPA signed of 1284 MW<br />
Jharkhand 1200 MW Tender issued by JREDA 200<br />
on 07.12.2015<br />
Total 7819 MW 5464 MW<br />
PUBLISHED BY :<br />
EQ<br />
INTERNATIONAL<br />
1000<br />
44<br />
50<br />
3<br />
2000<br />
500<br />
500<br />
1000<br />
(I) GOI SUPPORT: 4281 MW<br />
TENDERING BY TENDERING<br />
CAPACITY<br />
STATES/LIKELY DATE OF<br />
ISSUE OF TENDER<br />
(MW)<br />
“NTPC Ltd. 700 MW Gujarat<br />
( Own Projects)<br />
Total: 800 MW”<br />
100 MW Andaman & Nicobar<br />
“NTPC Ltd. 250 MW Andhra Pradesh<br />
( Developer mode)<br />
Total: 250 MW”<br />
“SECI- 100 MW canal 36 MW Different State<br />
top and canal bank<br />
Total: 36 MW”<br />
“SECI- VGF Scheme 750 MW Andhra Pradesh<br />
Total: 3050 MW”<br />
1000 MW Karnataka<br />
500 MW Odisha<br />
500 MW Maharashta<br />
250 MW Haryana<br />
50 MW Himachal Pradesh<br />
“SECI- as a consultant 50 MW-THDC Kerala<br />
Total: 70 MW”<br />
20 MW- OFB Different Location<br />
20 MW Different Location<br />
“Other CPSU<br />
Total: 75 MW”<br />
75 MW “KVIC- 10 MW<br />
VPT- 10 MW NHPC Ltd- 50<br />
MW<br />
Rashtriya Ispat- 5 MW”<br />
(II) STATE GOVERNMENT: 150 MW<br />
Sl. No. Tendering<br />
State<br />
Tendering<br />
Capacity (MW)<br />
1 Bihar 150 MW<br />
(III) TOTAL EXPECTED TENDER: 4281 MW+150= 4431 MW<br />
Statement- V<br />
ROOFTOPS<br />
S.no With subsidy Without subsidy<br />
1 SNAs Under process 200 MW<br />
2 SECI 750 MW 500 MW<br />
FOR MORE INFORMATION VISIT US at<br />
WWW.EQMAGPRO.COM<br />
MODULE<br />
MANUFACTURER’S<br />
STATE INSTALLED<br />
CAPACITIES<br />
KARNATAKA<br />
Astronergy Solar India Bangalore<br />
Pvt Ltd<br />
Emmvee Photovoltaic Bangalore 150<br />
Power Private Limited<br />
HHV Solar<br />
Bangalore 100<br />
Technologies Pvt Ltd<br />
Tata Power Solar India Bangalore 300<br />
Conergy Energy Bangalore<br />
Systems India Pvt Ltd<br />
Kotak Urja Pvt Ltd Bangalore 75<br />
Microsun Solar Bangalore 60<br />
Tech Pvt Ltd<br />
Rashmi Industries Bangalore<br />
Risen Energy Co Ltd Bangalore<br />
Nextech Electronics Bangalore<br />
Pvt Ltd<br />
Shan Solar Pvt Ltd Bangalore 60<br />
Canadian Solar Bangalore<br />
Bharat Electronic Ltd Bangalore 20<br />
Avi Solar Energy Bangalore 15<br />
WEST BENGAL<br />
Vikram Solar Pvt Ltd Kolkata 500<br />
Websol SL Energy Kolkata 100<br />
Systems<br />
Jupiter Solar Power Ltd Kolkata<br />
Reliance Industrial Ltd Kolkata 30<br />
Synergy Renewable Kolkata 25<br />
Energy Ltd<br />
Enfield Solar<br />
Kolkata 20<br />
Energy Ltd<br />
Modern Solar Pvt Ltd Kolkata 40<br />
Sova Power Ltd Kolkata 100<br />
Shurjo Energy Pvt Ltd Nadia 5<br />
TAMIL NADU<br />
Evergreen Solar Coimbatore 20<br />
Systems India Pvt Ltd<br />
Udhaya Energy Coimbatore 7<br />
Photovoltaics (P) Ltd.,<br />
Prosun Energy Coimbatore 5<br />
USL Photovoltaics Coimbatore 7<br />
Pvt Ltd<br />
L V Solar Solutions Chennai 40<br />
Swelect Energy Chennai<br />
Systems Ltd<br />
GUJARAT<br />
Topsun Energy Ltd Gandhinagar 75<br />
Lubi Electronics Gandhinagar<br />
Green Brilliance Energy Vadodara 45<br />
Pvt Ltd<br />
Goldi Green Technologies<br />
Surat 450<br />
Pvt Ltd<br />
Navitas Green Solutions Surat 135<br />
Pvt Ltd<br />
Sonali Energees Pvt Ltd Surat<br />
Kosol Hiramrut Ahmedabad 30<br />
Energies Pvt. Ltd<br />
Sahaj Solar Pvt Ltd Ahmedabad 50<br />
Shivam Photovoltaic Ahmedabad 50<br />
Pvt Ltd<br />
TELANGANA<br />
Sunshine Solar Systems Telangana 10<br />
CHHATTISGARH<br />
ICON Solar-en Power Raipur 40<br />
Technologies Pvt Ltd<br />
UTTAR PRADESH<br />
Jakson Solar Noida 60<br />
Ritika Systems Pvt Ltd Noida 40<br />
OTHER<br />
Rohini Solar 100<br />
Savitri Solar 80<br />
Integrated Solar 25<br />
Satvik 125<br />
Panchwakra 125<br />
Jyoti Solar 25<br />
Brawm Solar 25<br />
Amrita Solar 20<br />
Jenus 20<br />
Stellar Solar 20<br />
Solex 20<br />
Arion Solar 5<br />
Shukra Solar 5<br />
MX Power 5<br />
UTTARAKHAND 170 MW STATE TENDER RESULT<br />
Name of the Firm Capacity Aggregate<br />
Capacity<br />
Tariff<br />
Rays Power Infra Ltd., Jaipur 10 10 5.57<br />
Acme Solar Holdings, Gurgaon 12.5 22.5 5.58<br />
Rays Power Infra Ltd., Jaipur 10 32.5 5.58<br />
Impex India, Kolkata 2.4 34.9 5.6<br />
Acme Solar Holdings, Gurgaon 12.5 47.4 5.63<br />
Punj Lloyd Infrastructure Ltd., Gurgaon 10 57.4 5.64<br />
A.R. Solar Power, Dehradun 1 58.4 5.67<br />
Hydro Power Engineers, Dehradun 1 59.4 5.67<br />
A.R. Solar Power, Dehradun 1 60.4 5.69<br />
Emami Power Ltd., Kolkata 20 80.4 5.74<br />
Jltm Energy India Pvt. Ltd., Varanasi, U.P. 5 85.4 5.75<br />
Acme Solar Holdings, Gurgaon 12.5 97.9 5.78<br />
Acme Solar Holdings, Gurgaon 12.5 110.4 5.78<br />
Vishal Techno Commerce Ltd., Mumbai 5 115.4 5.79<br />
Omkar Powertech, Dehradun 10 125.4 5.82<br />
Punj Lloyd Infrastructure Ltd., Gurgaon 10 135.4 5.84<br />
Omkar Powertech, Dehradun 10 145.4 5.91<br />
Profigate Infra, Roorkee 5 150.4 5.93<br />
Omkar Powertech, Dehradun 10 160.4 5.95<br />
Makin Developers Pvt. Ltd., Dehradun 1 161.4 5.97<br />
Profigate Infra, Roorkee 5 166.4 5.98<br />
R.P. Infra Power Ltd., Gaziabad 5 171.4 5.99<br />
Punj Lloyd Infrastructure Ltd., Gurgaon 10 181.4 5.99<br />
COMMISSIONING STATUS OF GRID<br />
CONNECTED SOLAR POWER PROJECTS<br />
UNDER JNNSM AS ON 31-05-2016<br />
State/UT Total cumulative capacity till 31-05-16 (MW)<br />
Andhra Pradesh 864.192<br />
Arunachal Pradesh 0.265<br />
Bihar 5.1<br />
Chhattisgarh 93.58<br />
Gujarat 1120.363<br />
Haryana 15.387<br />
Jharkhand 16.186<br />
Karnataka 146.462<br />
Kerala 13.045<br />
Madhya Pradesh 780.37<br />
Maharashtra 385.756<br />
Odisha 66.92<br />
Punjab 430.063<br />
Rajasthan 1285.932<br />
Tamil Nadu 1267.414<br />
Telangana 785.843<br />
Tripura 5<br />
Uttar Pradesh 143.495<br />
Uttarakhand 41.145<br />
West Bengal 7.772<br />
Andaman & Nicobar 5.1<br />
Delhi 14.28<br />
Lakshadweep 0.75<br />
Puducherry 0.025<br />
Chandigarh 6.806<br />
Daman & Diu 4<br />
J&K 1<br />
Himachal Pradesh 0.201<br />
Mizoram 0.1<br />
Others(PSU/channel partner<br />
58.311<br />
)under Rooftop<br />
7564.863<br />
BIDDER’S<br />
NAME<br />
JanardhanWind Energy<br />
Pvt.Ltd.<br />
Suzlon<br />
Energy Ltd.<br />
Maharashtra Seamless<br />
Ltd.<br />
Azure Power India Pvt.<br />
Ltd.<br />
Mahindra Susten Pvt.<br />
Ltd.<br />
Hero Solar<br />
Energy Pvt.Ltd.<br />
AMPL Cleantech Pvt.<br />
Ltd.<br />
Neel Metal<br />
Products Ltd.<br />
NTPC 130 MW DCR RAJASTHAN<br />
KARNATAKA 500 MW NTPC BIDDING RESULTS (OPEN)<br />
QUOTED<br />
BIDDER’S<br />
ALUE<br />
QUANTITY<br />
5.06 2<br />
5.07 6<br />
5.07 2<br />
5.07 5<br />
5.14 2<br />
5.27 5<br />
5.41 2<br />
5.79 2<br />
QUANTITY<br />
10.00 NUMBERS<br />
START - PRICE 4.90 INDIAN RUPEE<br />
RESERVE - PRICE 4.90 INDIAN RUPEE<br />
Bidder’s Name Quoted Value Loaded Value Bidder’s Quantity Difference In % Bid - Value<br />
VS Start Price<br />
Yarrow Infrastructure Ltd. 4.78 4.78 1 2.45%<br />
Parampujya Solar Energy 4.79 4.79 2 2.24%<br />
Pvt.Ltd.<br />
Fortum Finnsurya Energy 4.79 4.79 2 2.24%<br />
Pvt.Ltd.<br />
Acme Solar Holdings Pvt. 4.79 4.79 2 2.24%<br />
Ltd.<br />
Tata Power Renewable<br />
4.79 4.79 2 2.24%<br />
Energy Ltd.<br />
Renew Solar Power Pvt.<br />
Ltd.<br />
4.8 4.8 10 2.04%<br />
HARYANA 150 MW SOLAR PV<br />
TENDER BIDDING RESULTS<br />
S.NO. NAME OF BIDDER MW TARIFF<br />
CATEGORY-I (1 TO 10MW)<br />
1 Fluidcon Engineering<br />
2 6<br />
2 Karan Singh 4 5.9<br />
3 Life Care 5 6.4<br />
4 OM Solar 4 Rejected<br />
5 Virender OM 3 6.12<br />
Bhatnagar<br />
6 Swamisolar Power 2 6.24<br />
Plant<br />
7 Deepak Goyal 1 5.64<br />
8 Vijay Kumar Mehta 2 6<br />
9 HR Power Experts 1.5 Rejected<br />
(HPPC Will<br />
Consider MW)<br />
10 Geeta Rani 1 5.64<br />
11 Zile Singh 1 6.65<br />
12 Suresh Kumar 2 5.67<br />
13 Yogendra Chauhan 5 6.11<br />
14 Lintex 1 5.99<br />
15 Balaji 1 6.41<br />
16 Yogesh Kumar 1 6.31<br />
17 Khajan Singh 1 6.29<br />
18 Go Agro 6 6.12<br />
19 Shreemati Santosh 1 Rejected<br />
20 Tapas Power 1 5.64<br />
21 Dlabir Singh 2 5.89<br />
22 BLR Sons 2 6.24<br />
23 Urmila Jain (HPPC 1.5 5.67<br />
Will Consider 1MW)<br />
24 Dhundhwal Brics Co. 1 6.21<br />
25 Narendra Kumar 5 5.81<br />
Gupta<br />
26 Mogiya green 1 6.3<br />
27 Pluto Solution 1 6.37<br />
28 Behal Power Projects 5 5.59<br />
29 GR Enterprices 1 6.24<br />
30 Atar Singh 1 6.25<br />
31 Aneeta Singh 2 5.9<br />
32 Manak Singh 1 6.25<br />
33 Harman Chits 5 Rejected<br />
Pvt Ltd<br />
34 Haryana Power Tech 2 6.44<br />
35 Nirmala devi 1 6.24<br />
36 Federal lyod 2 6.4<br />
37 Jabbar Singh 1 6.24<br />
38 Suraj Bhan 1 6.26<br />
39 Neeraj Ahuja 3 5.95<br />
40 Ramphal Bhardwaj 1.5 5.65<br />
41 Narendra Singh 5 6.05<br />
42 Virender Raval 2 5.9<br />
Total 92.5<br />
CATEGORY-II (11 TO 50 MW)<br />
43 Essel Green 20 5.85<br />
Essel Green 20 5.94<br />
Total 40<br />
CATEGORY-III (51 TO 150 MW)<br />
44 Fama power 51 5.88<br />
(Indiabulls)<br />
45 Acme 150 5.47<br />
46 Aditya Brila 150 5.08<br />
47 Prayatan Developers<br />
150 5.69<br />
Pvt Ltd<br />
Total 501<br />
TOTAL 633.5<br />
48 Sujor Power 5 6.25<br />
PV EQUIMENT MANUFACTURERS<br />
AND SUPPLIERS<br />
Applied Materials<br />
Centhotherm Photovoltaics India Pvt Ltd<br />
Four-C-Tron<br />
Aster e Technologies<br />
Gmee Solar Equipment Co Ltd<br />
Gsolar Power Co. Ltd<br />
Jinchen Machinery Co Ltd<br />
Schmid Group<br />
Singulus Technologies Corporation<br />
Solsol Asia Pte Ltd<br />
Von Ardenne Anlagentechnik GmbH<br />
Blistech International Pvt Ltd<br />
Komax Automation India Pvt Ltd<br />
Daksh Energy Sytems<br />
Mondragon Corporation<br />
Ecoprogetti<br />
International Marketing Corporation<br />
Proinso<br />
Bergen Group of Companies<br />
Bergen Systems Pvt Ltd<br />
Nmtronics India Pvt Ltd<br />
Tel Solar AG<br />
Enlog LLC<br />
CITY<br />
Bangalore<br />
Bangalore<br />
Bangalore<br />
Bangalore<br />
China<br />
China<br />
China<br />
Germany<br />
Germany<br />
Germany<br />
Germany<br />
Gurgaon<br />
Gurgaon<br />
Hyderabad<br />
Italy<br />
Mumbai<br />
Mumbai<br />
Mumbai<br />
New Delhi<br />
New Delhi<br />
Noida<br />
Switzerland<br />
USA<br />
EPC STATE CITY<br />
Harsha Abakus Solar Pvt. Ltd. Gujarat Ahmedabad<br />
BORG Energy India Pvt Ltd Karnataka Bangalore<br />
EMMVEE Solar Systems Private Limited Karnataka Bangalore<br />
Enerparc Energy Pvt Limited Karnataka Bangalore<br />
juwi India Renewable Energies Pvt Ltd Karnataka Bangalore<br />
Ravano Green Power Karnataka Bangalore<br />
Bosch Ltd Karnataka Bangalore<br />
Kotak Urja Pvt Ltd Karnataka Bangalore<br />
GreenBrilliance Energy Pvt. Ltd. Gujarat Baroda<br />
Tecpro Systems Limited Tamil Nadu Chennai<br />
Swelect Energy systems Ltd Tamil Nadu Chennai<br />
Larsen & Toubro Ltd Tamil Nadu Chennai<br />
Sunedison Energy India Pvt Ltd Tamil Nadu Chennai<br />
SunSource Energy Pvt Ltd Uttar Pradesh Ghaziabad<br />
Lanco Solar Energy Pvt Ltd Haryana Gurgaon<br />
Rattan India Apna Solar Ltd Haryana Gurgaon<br />
Su-Kam Power Systems Ltd Haryana Gurgaon<br />
Cirus Solar Pvt Ltd Andhra Pradesh Hyderabad<br />
Enfinity Solar Solution Pvt Ltd Andhra Pradesh Hyderabad<br />
Surana Ventures Ltd., Maharashtra Hyderabad<br />
Ujaas Energy Ltd Madhya Pradesh Indore<br />
Rays Power Infra Pvt Ltd Rajasthan Jaipur<br />
PTL Solar Energy Pvt Ltd Kerala Kerala<br />
Vikram Solar Pvt Ltd West Bengal Kolkata<br />
Belectric Photovoltaic India Private Ltd Maharashtra Mumbai<br />
Chemtrols Solar Pvt. Ltd Maharashtra Mumbai<br />
Godrej & Boyce Mfg. Co. Ltd. Maharashtra Mumbai<br />
IBC SOLAR Projects Private Limited Maharashtra Mumbai<br />
Ikaros Solar India Private Limited Maharashtra Mumbai<br />
Inspira Martifer Solar Maharashtra Mumbai<br />
Mahindra EPC Services Pvt. Ltd Maharashtra Mumbai<br />
Refex Energy Ltd Maharashtra Mumbai<br />
Sterling And Wilson Ltd. Maharashtra Mumbai<br />
Tata Power Solar Maharashtra Mumbai<br />
Visa Power Maharashtra Mumbai<br />
Waaree Energies Pvt Ltd Maharashtra Mumbai<br />
Shan Solar Pvt Ltd Maharashtra Mumbai<br />
TBEA Sunoasis Co. Ltd Maharashtra Mumbai<br />
Rolta Power Pvt ltd Maharashtra Mumbai<br />
Deshmuk Eng Maharashtra Nasik<br />
Kirloskar Integrated Technologies Ltd Maharashtra Pune<br />
Solairdirect Energy India Pvt Ltd Maharashtra Pune<br />
Relyon Solar Pvt Ltd Maharashtra Pune<br />
Enrich Energy Pvt Ltd Maharashtra Pune<br />
C & S Electric Ltd New Delhi New Delhi<br />
Jakson Power Solution New Delhi New Delhi<br />
SunPower Solar India Pvt Ltd. New Delhi New Delhi<br />
Bergen Group New Delhi New Delhi<br />
Elcomponics Sales Pvt Ltd New Delhi New Delhi<br />
Rays Power Experts Pvt Ltd New Delhi New Delhi<br />
Inetest Technologies India Pvt Ltd New Delhi New Delhi<br />
Moser Baer Solar Ltd New Delhi New Delhi<br />
Asun Solar Power Pvt Ltd New Delhi New Delhi<br />
PHOCOS India Solar Pvt Ltd Puducherry Puducherry<br />
Premier Solar Powertech Pvt Ltd Andhra Pradesh Secunderabad<br />
Goldi Green Technologies Pvt Ltd Gujarat Surat<br />
Madhav Infra Projects Ltd Gujarat Vadodara<br />
CELL<br />
MANUFACTURER’S<br />
STATE INSTALLED<br />
CAPACITIES<br />
ANDHRA PRADESH<br />
Surana Ventures Ltd Hyderabad 120<br />
Solar Semiconductors Hyderabad 30<br />
Pvt Ltd<br />
XL Energy Ltd Hyderabad 60<br />
Premier Solar Systems Hyderabad 40<br />
Microsol International Secunderabad<br />
LL FZE<br />
NEW DELHI<br />
Maharishi Solar<br />
New Delhi 10<br />
Technology Pvt Ltd<br />
Moser Baer India Ltd New Delhi 250<br />
Indo Solar Ltd New Delhi 200<br />
Bharat Heavy<br />
New Delhi 8<br />
Electricals Ltd<br />
KARNATAKA<br />
Tata Power Solar Bangalore 140<br />
HARYANA<br />
Lanco Solar<br />
Gurgaon<br />
WEST BENGAL<br />
Websol SL Energy<br />
Kolkata 150<br />
Systems Ltd<br />
Jupiter Solar Power Ltd Kolkata 132<br />
TAMIL NADU<br />
Udhaya Energy<br />
Coimbatore 12<br />
Photovoltaics (P) Ltd.,<br />
GUJARAT<br />
Euro Multivision Ltd Kutch 50<br />
Uttar Pradesh<br />
Central Electronics Limited Sahibabad 10<br />
ALL RIGHTS RESERVED.<br />
SOLAR INVERTERS MANUFACTURERS<br />
AND SUPPLIERS<br />
BANGALORE<br />
ABB Ltd<br />
Power-One Microsystems P Ltd<br />
Vispira Controls<br />
Delta Energy Systems India<br />
Pvt. Ltd.<br />
Power Electronics<br />
CHENNAI<br />
Bonfiglioli Transmission Pvt Ltd<br />
Swelect Energy Systems Ltd<br />
Zigor India Pvt. Ltd.<br />
Gamesa Renewable Pvt Ltd<br />
ReGen Powertech Pvt Ltd<br />
Shimato Enterprises Pvt Ltd<br />
GANDHINAGAR<br />
Hitachi Hi-Rel Power Electronics Pvt. Ltd.<br />
GERMANY<br />
KACO new energy GmbH<br />
GURGAON<br />
Schneider Electric India Pvt Ltd<br />
Su-Kam Power Systems Ltd<br />
Ingeteam Pvt Ltd<br />
OutBack Power<br />
Bergen Group of Companies<br />
Socomec India Pvt Ltd<br />
Huawei Technologies Co. Ltd<br />
HYDERABAD<br />
LTi DRiVES GmbH<br />
Galileo Solar India Pvt Ltd<br />
MUMBAI<br />
Proinso<br />
SMA Solar India Pvt Ltd<br />
Toshiba Mitsubishi –Electric<br />
Industrial Systems Corp<br />
INVT Electric India Pvt Ltd<br />
Polycab Wires Pvt Ltd<br />
NEW DELHI<br />
Statcon Energiaa Pvt Ltd<br />
TBEA Sunoasis Co. Ltd<br />
PUNE<br />
Luminous Renewable Energy<br />
Solutions<br />
Emerson Industrial Automation<br />
Enertech UPS Pvt Ltd<br />
Fronius Solar<br />
Gefran India Pvt Ltd<br />
Vacon Drives and Controls<br />
Private Limited<br />
Santerno India pvt Ltd<br />
Power One Micro Systems Pvt Ltd<br />
TAIWAN<br />
Shenzhen Kstar New<br />
Energy Co Ltd<br />
UTTARAKHAND<br />
Kevin Power solution Ltd<br />
VADODARA<br />
ACVA Solar Pvt. Ltd<br />
VAPI<br />
Powertrac Solar Projects Ltd<br />
PV CABLES , CONNECTORS , STATE CITY<br />
JUCTION BOXES<br />
ABB India Ltd Karnataka Bangalore<br />
Lapp India Pvt Ltd Karnataka Bangalore<br />
Mersen India Pvt Ltd Karnataka Bangalore<br />
Allied Moulded Enclosure Products<br />
Karnataka Bangalore<br />
(India) Pvt Ltd,<br />
KGS Engineering Ltd Tamil Nadu Chennai<br />
OBO Bettermann India Pvt Ltd Tamil Nadu Chennai<br />
DEHN India Pvt Ltd Haryana Gurgaon<br />
Ensto India Pvt Ltd Haryana Gurgaon<br />
Schneider Electric India Pvt Ltd Haryana Gurgaon<br />
Socomec India Pvt Ltd Haryana Gurgaon<br />
Vrinda Nano Technologies Pvt Haryana Gurgaon<br />
Ltd<br />
Access Solar Ltd<br />
Andhra Hyderabad<br />
Pradesh<br />
Jurchen Technology India Pvt Maharashtra Mumbai<br />
Ltd<br />
Kimo Electronics Pvt Ltd Maharashtra Mumbai<br />
Staubli Tec Systems India Pvt Ltd Maharashtra Mumbai<br />
Apar Industries Ltd Maharashtra Mumbai<br />
Tuv Sud South Asia Pvt Ltd Maharashtra Pune<br />
Weidmueller Electronics Inda Maharashtra Pune<br />
Pvt Ltd<br />
LEONI Cable Solutions (India) Maharashtra Pune<br />
Private Limited<br />
Citel Surge Protection Pvt Ltd New Delhi New Delhi<br />
Trinity Touch Pvt Ltd New Delhi New Delhi<br />
Cooper Bussmann India Pvt Ltd Pondicherry Pondicherry<br />
Cape Electric Pvt Ltd Tamil Nadu Sriperumbudur<br />
Hensel Electric India Pvt Ltd Tamil Nadu Sriperumbudur<br />
Powertrac Solar Projects Ltd Gujarat Vapi<br />
COPYRIGHT @ FIRST SOURCE ENERGY PVT. LTD.