REQUEST FOR PROPOSALS
6i9th772k
6i9th772k
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
(vii)<br />
In case of a Joint Venture/Association of firms, the proposal shall be<br />
accompanied by a certified copy of legally binding Memorandum of<br />
Understanding (MOU) on a stamp paper of Rs.100, signed by all firms to the<br />
joint venture/Association as detailed at para 1.8.2 above.<br />
3.1.2 The minimum essential requirement in respect of eligibility has been indicated in the<br />
data sheet, the proposal found deficient in respect of these requirements will not be<br />
considered for further evaluation.<br />
3.2 Technical Proposal<br />
3.2.1 The Consultants are expected to examine all terms and instructions included in the<br />
Documents. Failure to provide the requested information will be at their own risk and<br />
may result in rejection of their proposal.<br />
3.2.2 During preparation of the technical proposal, Consultants must give particular<br />
attention to the following:<br />
Total assignment period is as indicated in the enclosed TOR. A manning schedule in respect<br />
of requirement of key personnel is also furnished in the TOR which shall be the basis<br />
of the Financial Proposal. The Consultant shall make their own assessment of support<br />
personnel both technical and administrative to undertake the assignment. Additional support<br />
and administrative staff need to be provided for timely completion of the project within the<br />
total estimated cost. It is emphasized that the time period for the assignment indicated<br />
in the TOR should be strictly adhered to.<br />
3.2.3 The technical proposal shall be submitted strictly in the Formats given in Appendix- III<br />
and shall comprise of following documents:<br />
(i)<br />
(ii)<br />
(iii)<br />
(iv)<br />
(v)<br />
(vi)<br />
(vii)<br />
(viii)<br />
(ix)<br />
Forwarding letter for Technical proposal duly signed by the authorized person on behalf<br />
of the bidder, as in Form E-1 &T-1.<br />
Deleted<br />
Firm’s references - Relevant Services carried out in the last seven years to be<br />
submitted through INFRACON.<br />
Site Appreciation: limited to four A4 size pages in 1.5 space and 12 font including<br />
photographs, if any (Form-T-4).<br />
Deleted<br />
The composition of the proposed Team to be submitted through INFRACON.<br />
Deleted<br />
The proposal should clearly identify and mention the details of Material Testing LAB<br />
FACILITIES to be used by the Consultants for the project (Form-T-8). In this connection,<br />
the proposals of the Consultants to use in-house LAB FACILITIES up to a distance of<br />
maximum 400 km. from the project site being feasible would be accepted. For all other<br />
cases, suitable nearby material Testing Laboratory shall be proposed before Contract<br />
Agreement is executed.<br />
The proposal shall indicate as to whether the firm is having the facilities for carrying out<br />
the following field activities or these are proposed to be outsourced to specialized<br />
agencies in the Form- T-9.