iii) Provide information on required river training works for proposed bridge<br />

iv) Provide hydraulic design for the bridge and the required river training works.<br />

v) Quantify the general direction of river course through bridge, afflux, extent and<br />

magnitude of flood, effect of backwater, if any, aggradation /degradation of<br />

bed, evidence of scour etc. shall be used to augment the available hydrological<br />

data. The presence of flood control/irrigation structures, if affecting the<br />

hydraulic characteristics like causing obliquity, concentration of flow, scour,<br />

silting of bed, change in flow levels, bed levels etc. shall be studied and<br />

considered in Hydraulic design of proposed bridge. The details of any planned<br />

work in the immediate future that may affect the river hydraulics shall be<br />

studied and considered.<br />

4. Information /Documents /Data required for Physical/Mathematical Model study<br />

i) Plan layouts showing the locations of the proposed bridge as well as the<br />

existing bridges / barrages etc., in the vicinity of the proposed bridge with the<br />

chainages with respect to a standard reference marked on it.<br />

ii)<br />

iii)<br />

iv)<br />

High flood discharges and corresponding flood levels at the locations of the<br />

existing bridges in the vicinity of the proposed bridge.<br />

General arrangement drawing (GAD) of the existing bridges showing number<br />

of spans, pier and well dimensions, founding levels, maximum scour level, the<br />

design discharge and the HFL, guide bund details. On this, the plan form of the<br />

river course with the bridge alignment may also be shown as far as possible.<br />

General arrangement drawing (GAD) of the proposed new bridge showing<br />

number of spans, pier and foundation dimensions. On this, the plan form of the<br />

river course with the bridge alignment may also be shown as for as possible.<br />

v) River cross sections at 500m longitudinal spacing (maximum) up to a distance<br />

of 2 times the bridge total length on the upstream side and up to a distance<br />

equal to the bridge total length on the downstream with right bank and left<br />

bank clearly marked on it. At least one cross section to be provided at the<br />

location of the proposed bridge. At each cross section, the bed levels to be taken<br />

at a maximum lateral distance of 8 m in flow section and at 25 m in none flow<br />

section respectively. The abrupt variations in the bed levels to be captured by<br />

taking measurements at closer locations both in longitudinal as well as lateral<br />

directions.<br />

vi)<br />

vii)<br />

viii)<br />

ix)<br />

The cross sections, as for as possible, from high bank to high bank.<br />

The longitudinal profile of the river along the length of the proposed alignment.<br />

Size distribution of the river bed material and the bore log data at different<br />

locations at the site of the proposed bridge.<br />

The series of annual peak flood of the river for at least 15 years period.<br />

Checklists<br />

SUPPLEMENT-III<br />

ADDITIONAL REQUIREMENT <strong>FOR</strong> SAFETY AUDIT<br />

The use of checklists is highly recommended as they provide a useful “aide memoire” for