18. 4.12.5(3)<br />

The design of embankments should include the requirements for protection<br />

works and traffic safety features including features specific to hill roads.<br />

19. -- Design and Drawing of Tunnels:<br />

The Consultant shall prepare design and drawings for tunnels, if required<br />

as per the results of feasibility study, as per the relevant specifications of<br />

IRC: SP: 91/MORT&H and other international specifications.<br />

20. 4.12.7<br />

a) Topography of hills generates numerous water courses and this coupled<br />

with continuous gradients of roads in hills and high intensity of rainfall<br />

calls for effective drainage of roads. The drainage system shall be<br />

designed to ensure that the water flowing towards the road surface may be<br />

diverted and guided to follow a definite path by suitable provision of road<br />

side drains, catch water drains, interceptors etc. and flow on valley side is<br />

controlled so that stability is not affected.<br />

b) Further, adequate provision shall be made for sub-surface/subgrade<br />

drainage to take care of seepage through the adjacent hill face of the road&<br />

underground water flows.<br />

21. 4.12.8<br />

The Consultant shall design suitable traffic safety features and road<br />

furniture including traffic signals, signs, markings, overhead sign boards,<br />

crash barriers, delineators etc. including any feature specific to hill roads.<br />

The locations of these features shall be given in the reports and also shown in<br />

the drawings.<br />

The Consultant shall make suitable designs and layout for miscellaneous<br />

works including rest areas, bus bays, vehicle parking areas,<br />

22. 4.12.3 (1)<br />

telecommunication facilities, scenic overlooks, watering points etc.<br />

wherever appropriate.<br />

23. 10.6 (1)<br />

Volume II: Design Report :<br />

a) Inventory of protection measures and other structures<br />

b) Inventory of tunnels, if required.<br />

c) Proposed preliminary designs for tunnels, if required.<br />

Volume III: Drawings<br />

a) Drawings for protection/control measures and other structures<br />

b) Drawings for tunnels, if required.<br />

24. 10.7 (3) Volume II: Design Report (Part II)<br />

Part II of Design Report shall also deal with design of tunnels, if required<br />

And design of other protection/control structures.<br />

Volume IX: Drawing Volume<br />

This shall also include :<br />

a) Detailed working drawings for tunnels, if required.<br />

b) Detailed working drawings for protection/control structures