SUPPLEMENT I<br />

ADDITIONAL POINTS TO BE CONSIDERED <strong>FOR</strong> HILL ROADS IN ADDITION<br />

TO POINTS COVERED IN MAIN TOR<br />

Clause<br />

S. No. No.of TOR<br />

Additional points<br />

1. 2.2 a) Provisions of tunnels if required.<br />

2. 2.3 a) Design of tunnels, if required<br />

b) Design of protective works, slope stabilization measures, erosion control<br />

measures, land slide control/protection measures snow drift<br />

control/snow clearance measures, avalanche protection measures, if<br />

required<br />

3. 3<br />

Feasibility study and preparation of detailed project report for hill roads<br />

shall be done in accordance with best international practices and wherever<br />

practicable/feasible steep gradients and hair pin bends may be avoided by<br />

realignments by provision of structures and provision of tunnels if required<br />

4. 4.1<br />

a) Inventory and condition survey for tunnels, if required.<br />

b) Identification of faults in rock strata and impact of faults in design of<br />

tunnels, if required<br />

c) Detailed design of road considering and incorporating specific aspects<br />

related to hill region like terrain, topographic conditions, extreme<br />

weather conditions, altitude effects etc.<br />

d) Design of protective works, slope stabilization measures, erosion control<br />

measures, land slide control/protection measures, snow drift<br />

control/snow clearance measures, avalanche protection measures, if<br />

required<br />

e) Design of scenic overlooks/watering points etc.<br />

5. 4.5 (1)<br />

All activities related to field studies, design and documentation shall be<br />

done as per the latest guidelines/circulars of MORT&H and relevant<br />

publications of the Indian Roads Congress (IRC)/Bureau of Indian<br />

Standards (BIS) for hill roads. For aspects not covered by IRC and BIS,<br />

international standard practices, such as, British and American Standards<br />

may be adopted.<br />

6. 4.7 Review of data and documents pertaining to<br />

a) Terrain and soil condition<br />

b) Condition of tunnels, if required.<br />

c) Sub-surface and geo-technical data for existing tunnels, if required.<br />

d) Drawing and details of existing tunnels, if required.<br />

e) Existing protective works, erosion control and land slide<br />

control/protection works, slope stabilization measures, snow drift<br />

control measures, avalanche protection measures<br />

f) Existing land slide and snow clearance facilities<br />

g) Geological details of rock strata in the area in case of tunnels<br />

7. 4.11(1) The Consultant should make an in depth study of available geological and<br />

meteorological maps of the area.<br />

8. 4.11 (2) The primary tasks to be accomplished during the reconnaissance survey<br />

shall also include: