4.13.3 Reporting Requirements of EIA<br />
The Consultant would prepare the stand-alone reports as per the requirement of the<br />
ADB/World Bank / NHIDCL, as applicable, with contents as per the following:<br />
• Executive Summary<br />
• Description of the Project<br />
• Environmental setting of the project.<br />
• Identification and categorization of the potential impacts (during preconstruction,<br />
construction and operation periods).<br />
• Analysis of alternatives (this would include correlation amongst the finally<br />
selected alternative alignment/routing and designs with the avoidance and<br />
environmental management solutions).<br />
• The public consultation process.<br />
• Policy, legal and administrative framework. This would include mechanisms at<br />
the states and national level for operational policies. This would also include a<br />
description of the organizational and implementation mechanism<br />
recommended for this project.<br />
• Typical plan or specific designs for all additional environmental items as<br />
described in the scope of work.<br />
• Incorporating any other as per the suggestions of the ADB/ World Bank /<br />
NHIDCL, till the acceptance of the reports by the ADB/ World Bank<br />
/NHIDCL, as applicable.<br />
• EMP Reports for Contract Package based on uniform methodology and<br />
processes. The Consultant will also ensure that the EMP has all the elements for<br />
it to be a legal document. The EMP reports would include the following:<br />
- Brief description of the project, purpose of the EMP, commitments on<br />
incorporating environmental considerations in the design, construction<br />
and operations phases of the project and institutional arrangements for<br />
implementing the EMP.<br />
- A detailed EMP for construction and operational phases with recourse to<br />
the mitigation measures for all adverse impacts.<br />
- Detailed plans for highway-side tree plantation (as part of the<br />
compensatory aforestation component).<br />
- Environmental enhancement measures would be incorporated.<br />
Enhancement measures would include items described in the scope of<br />
work and shall be complete with plans, designs, BOQ and technical<br />
specifications.<br />
- Environmental monitoring plans during and after construction including<br />
scaling and measurement techniques for the performance indicators<br />
selected for monitoring.<br />
- The EMP should be amendable to be included in the contract documents<br />
for the works.<br />
- Incorporating any other as per the suggestions of the ADB/ World Bank<br />
NHIDCL, till the acceptance of the reports by the ADB/ World Bank /<br />
MORT&H/NHIDCL as applicable.<br />
4.13.4 Reporting requirements of RAP<br />
Analysis on the resettlement plan be conducted based on ADBs Hand Book on