environmental clearances from the respective authorities including the SPCBs<br />

and the MOEF on behalf of NHIDCL/MORT&H. The Consultants will make<br />

presentation, if required, in defending the project to the MOEF Infrastructure<br />

Committee.<br />

10. The Consultant shall identify and plan for plantation and Transplantation of<br />

the suitable trees along the existing highway in accordance with IRC guidelines.<br />

11. The Consultant shall assist in providing appropriate input in preparation of<br />

relevant environment and social sections of BPIP.<br />

4.13.2 Social Assessment<br />

1 The Consultant would conduct base line socio-economic and census survey to<br />

assess the impacts on the people, properties and loss of livelihood. The<br />

socioeconomic survey will establish the benchmark for monitoring of R&R<br />

activities. A social assessment is conducted for the entire project to identify<br />

mechanisms to improve project designs to meet the needs of different<br />

stakeholders. A summary of stake holders discussions, issue raised and how the<br />

project design was developed to meet stakeholders need would be prepared.<br />

2 The Consultant shall prepare Land Acquisition Plan and assist<br />

NHIDCL/MORT&H in acquisition of land under various Acts.<br />

4.13.2.3 The Consultant would prepare Resettlement and Rehabilitation Plan –assess<br />

feasibility and effectiveness of income restoration strategies and suitability and<br />

availability to relocation sites. The resettlement plan which accounts for land<br />

acquisition and resettlement impacts would be based on a 25% socio-economic<br />

survey and 100 % census survey of project affected people which provide the<br />

complete assessment of the number of affected households and persons,<br />

including common property resources. All untitled occupants are recorded at<br />

the initial stages and identify cards will be issued to ensure there is no further<br />

influx of people in to the project area. All consultations with affected persons (to<br />

include list of participants) should be fully documented and records made<br />

available to NHIDCL.<br />

• Assessment on the impact of the project on the poor and vulnerable<br />

groups along the project road corridor.<br />

• Based on the identified impacts, developing entitlement matrix for the<br />

project affected people.<br />

• Assessment on social issues such as indigenous people, gender,<br />

HIV/AIDS, labourers including child labour.<br />

• Implementation budgets, sources and timing of funding and schedule<br />

of tasks.<br />

• Responsibility of tasks, institutional arrangements and personnel for<br />

delivering entitlement and plans to build institutional capacity.<br />

• Internal and external Monitoring plans, key monitoring indicators and<br />

grievance redress mechanism.<br />

• Incorporating any other suggestions of the ADB/ World<br />

Bank/MORT&H / NHIDCL, till the acceptance of the reports by the<br />

ADB/ World Bank/ NHIDCL, as applicable.