site to artesian conditions, seismic disturbance and other engineering properties<br />

of soil etc. Geotechnical investigation and Sub-soil Exploration will be done as<br />

per IRC 78-.<br />

5. The scheme for the borings locations and the depth of boring shall be prepared<br />

by the Consultants and submitted to NHIDCL for approval. These may be<br />

finalised in consultation with NHIDCL.<br />

6. The sub-soil exploration and testing should be carried out through the<br />

Geotechnical Consultants empanelled by MORT&H. The soil testing reports<br />

shall be in the format prescribed in relevant IRC Codes.<br />

7. For the approach road pavement, bore holes at each major change in pavement<br />

condition or in deflection readings or at 2 km intervals whichever is less shall be<br />

carried out to a depth of at least 2 m below embankment base or to rock level<br />

and are to be fully logged. Appropriate tests to be carried out on samples<br />

collected from these bore holes to determine the suitability of various materials<br />

for use in widening of embankments or in parts of new pavement structure.<br />

4.11.5. Material Investigations<br />

1. The Consultants shall identify sources (including use of fly-ash/ slag), quarry<br />

sites and borrow areas, undertake field and laboratory testing of the materials<br />

to determine their suitability for various components of the work and establish<br />

quality and quantity of various construction materials and recommend their use<br />

on the basis of techno-economic principles. The Consultants shall prepare mass<br />

haul diagram for haulage purposes giving quarry charts indicating the location<br />

of selected borrow areas, quarries and the respective estimated quantities.<br />

“Environment friendly materials”<br />

“As per MORTH circular No. RW /NH-33044/53/2013-S&R(R) dated<br />

20 th November, 2013, alternative pavement materials and technologies for road<br />

construction shall be assessed and compared in the design stage. The alternative<br />

resulting in substantial reduction in GHG emission and with least life cycle cost<br />

shall be recommended for implementation.<br />

Technical and economic feasibility of using industrial byproducts, recyclable<br />

and waste materials shall be assessed depending on their availability in the<br />

concerned region.<br />

2. It is to be ensured that no material shall be used from the right-of-way except by<br />

way of leveling the ground as required from the construction point of view or<br />

for landscaping and planting of trees etc. or from the cutting of existing ground<br />

for obtaining the required formation levels.<br />

3. Environmental restrictions, if any, and feasibility of availability of these sites to<br />

prospective civil works contractors, should be duly taken into account while<br />

selecting new quarry locations.<br />

4. The Consultants shall make suitable recommendations regarding making good<br />

filling of the borrow and quarry areas after the exploitation of materials for<br />

construction of works.<br />

5. The Material Investigation aspect shall include preparation and testing of<br />

bituminous mixes for various layers and concrete mixes of different design mix