20.06.2016 Views

REQUEST FOR PROPOSALS

6i9th772k

6i9th772k

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Note: 1. In case Feasibility Study is part of DPR services, the experience shall be counted in<br />

DPR only. In case Bridge is included as part of DPR of Highway the experience will be<br />

counted both in (a) and in (b).<br />

(ii) Material testing, Survey and investigation equipment and software proposed to be<br />

used (Outsourcing of Services/equipment shall be through Empanelled<br />

Consultants with MORTH wherever applicable) 5 (Maximum)<br />

a) Availability of in-house material testing 1<br />

facility<br />

Available 1<br />

Not available/outsourced 0.5<br />

b) Field investigation facilities 2<br />

Available 2<br />

Not available/outsourced 1<br />

c) Office Equipment and software 2<br />

Available 2<br />

Not available/outsourced 1<br />

Total 5<br />

(iv) Qualification and competence of the key staff for adequacy of the Assignment =75 points<br />

The weight-age for Central Team and Sub Team along with Key Personnel are as under:<br />

S.<br />

%<br />

Key Personnel<br />

No.<br />

Weightage<br />

Central Team[Weightage, W: (100-w)%]<br />

[w=weightage assigned to all the sub teams in total)]<br />

1 Team Leader 20<br />

2 Geo-Technical and Pavement Expert 15<br />

3 Environment Specialist 10<br />

4 Traffic cum Safety Expert 10<br />

5 Hill road/Tunnel Expert 15<br />

6 Revenue / Survey Expert 10<br />

7 Bridge Design Engineer 15<br />

8 Contract Specialist 5<br />

Total 100<br />

Sub Team [Weightage, w = (10*N)%]/2<br />

(N= number of sub teams under the assignment = 2 i.e. 1 for each<br />

corridor)<br />

9 Highway Engineer X1 50<br />

10 Quantity Surveyor cum Documentation Expert X 2 50<br />

Total 100<br />

In case the number of sub teams are more than 1, the weightage to each key personnel<br />

shall be divided by number of sub teams<br />

(v) The technical proposal should score at least 75 points out of 100 to be considered for<br />

financial evaluation.<br />

The number of points assigned during the evaluation of qualification and competence of

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!