REQUEST FOR PROPOSALS
6i9th772k
6i9th772k
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2.<br />
3.<br />
Material testing, survey and<br />
investigation equipment and software<br />
proposed to be used.<br />
Qualifications and Relevant Experiences<br />
of the Proposed Key Personnel<br />
5<br />
75<br />
Total 100<br />
The weightage points given to evaluation sub-criteria for qualifications and competence of key<br />
staff are as under:<br />
Table-3: Weightage Points for Key Professionals<br />
Description Weight (%)<br />
General Qualification 25<br />
Relevant Experience and Adequacy for the Project 70<br />
Employment with the Firm 5<br />
Total 100<br />
Break up<br />
details in<br />
Para12.2.2<br />
12.2.1 The number of points to be given under each of the evaluation criteria is:<br />
S.no Description Points<br />
(i) Firms relevant experience in last 7 years (2008-09 onwards) 20<br />
(a) Specific experience of the DPR consultancy related to the 12<br />
Assignment for eligibility<br />
(a)(i) Aggregate Length of DPR / Feasibility study of 2/4/ 6<br />
lane projects<br />
6(Maximum)<br />
Indicative Length * of a package applied for 4<br />
2 times Indicative Length of a package applied for 5<br />
3times or more Indicative Length of a package applied for 6<br />
(a)(ii) DPR for 2/4/6 laning projects each equal to or more<br />
than 40 % of indicative length of a package applied for (or<br />
Feasibility Study for 2/4/6 laning projects each equal to or<br />
more than 60 % of indicative length of a package applied for) 6(Maximum)<br />
1 project 4<br />
2 projects 5<br />
3 projects 6<br />
b) DPR of Bridge having length more than 200 m 4 (maximum)<br />
One bridge 1<br />
Two bridges 2<br />
Three bridges 3<br />
Four bridges 4<br />
c) Specific experience of firms in terms of turnover 4 (Maximum)<br />
Firm’s Average Turnover of last 5 years >= 10 crore 4<br />
Firm Average Turnover of last 5years>= 5 crore but < 10<br />
crore 3<br />
Firm Average Turnover of last 5 years< 5 crore 0<br />
*Indicative for this RFP is 150Km i.e. highest of two roads.