- Page 1 and 2:
National Highways & Infrastructure
- Page 3 and 4:
National Highways & Infrastructure
- Page 5 and 6:
Letter of Invitation (LOI) Package
- Page 7 and 8:
1.8.3 In case of Joint Venture, one
- Page 9 and 10:
(vii) In case of a Joint Venture/As
- Page 11 and 12:
assignment on the project. After th
- Page 13 and 14:
4.2.2 Deleted 4.3 The proposal must
- Page 15 and 16:
negotiation at the cost of Consulta
- Page 17 and 18:
Encl. as above (Y.C. Srivastava) Ge
- Page 19 and 20:
Annex-II Procedure of Awarding Work
- Page 21 and 22:
Section - III To, Y C Srivastava, G
- Page 23 and 24:
(i) (ii) (iii) The Consultants and
- Page 25 and 26:
2. 3. Material testing, survey and
- Page 27 and 28:
key staff are as given below: (D) T
- Page 29 and 30:
12.3 Third stage - Evaluation of Fi
- Page 31 and 32:
implementation. Consultant should a
- Page 33 and 34:
Structures, river Bank training/Pro
- Page 35 and 36:
xi. historical data on classified t
- Page 37 and 38:
Road from/to other road routes incl
- Page 39 and 40:
three scenarios, namely, optimistic
- Page 41 and 42:
vi.. Collection of details for all
- Page 43 and 44:
i. terrain (flat, rolling, mountain
- Page 45 and 46:
ii. iii. The surveys shall be carri
- Page 47 and 48:
3. In respect of major bridges, his
- Page 49 and 50:
site to artesian conditions, seismi
- Page 51 and 52:
measures for improvement should be
- Page 53 and 54:
1. The embankments design should pr
- Page 55 and 56:
The Consultants shall design suitab
- Page 57 and 58:
environmental clearances from the r
- Page 59 and 60:
Resettlement, A Guide to Good pract
- Page 61 and 62:
1. It is envisaged that the project
- Page 63 and 64:
STAGE 1 2. The time schedule for va
- Page 65 and 66:
all items of works v. Civil Work Co
- Page 67 and 68:
The Environmental Impact Assessment
- Page 69 and 70:
The Final package-wise DPR consisti
- Page 71 and 72:
SUPPLEMENT I ADDITIONAL POINTS TO B
- Page 73 and 74:
maps, topographical maps, geologica
- Page 75 and 76:
SUPPLEMENT II S. Clause No. of Addi
- Page 77 and 78:
the audit team to check that no imp
- Page 79 and 80:
B3 : Junctions B4 : Non-Motorised r
- Page 81 and 82:
MANNING SCHEDULE Enclosure-I Packag
- Page 83 and 84:
Enclosure-II(contd.) QUALIFICATION
- Page 85 and 86:
Enclosure-II (contd.) QUALIFICATION
- Page 87 and 88:
Enclosure-II(contd.) QUALIFICATION
- Page 89 and 90:
Enclosure-II(contd.) QUALIFICATION
- Page 91 and 92:
Enclosure-II(contd.) QUALIFICATION
- Page 93 and 94:
Stage No. Enclosure-III Activity No
- Page 95 and 96:
10. I/We further certify that in re
- Page 97 and 98:
APPENDIX-II Form- E3 Deleted
- Page 99 and 100:
(Form-T1) Appendix III TECHNICAL PR
- Page 101 and 102:
Deleted Form-E2/T3
- Page 103 and 104:
Deleted Form- T5
- Page 105 and 106:
Form- T7 . Deleted
- Page 107 and 108:
Facility for Field investigation an
- Page 109 and 110: Form- T11 UNDERTAKING FROM THE KEY
- Page 111 and 112: (Form-II) Format of Financial Propo
- Page 113 and 114: Package no. NHIDCL/DPR/IM & UJ/2016
- Page 115 and 116: VIII Reports and Document Printing
- Page 117 and 118: Form-IV) Estimate of Costs for Expa
- Page 119 and 120: APPENDIX- IV A Validate Print Help
- Page 121 and 122: Note 1:No escalation will be payabl
- Page 123 and 124: CONTENTS Sl. No. Description Page N
- Page 125 and 126: Appendix A: Terms of reference cont
- Page 127 and 128: Appendix F: Minutes of Financial/ C
- Page 129 and 130: 1. GENERAL PROVISIONS GENERAL CONDI
- Page 131 and 132: Client under this Contract, includi
- Page 133 and 134: 2.7.5 Payments During the period of
- Page 135 and 136: Clause 2.9.1 hereof, reimbursement
- Page 137 and 138: 3.7 Consultants' Actions requiring
- Page 139 and 140: themselves on valid grounds, e.g.,
- Page 141 and 142: Services; 5.2 Access to Land The Cl
- Page 143 and 144: Note: Consultants have to provide a
- Page 145 and 146: 7.3. Penalty 7.3.1. Penalty for Err
- Page 147 and 148: 10. Change of Scope The change of S
- Page 149 and 150: 1.10 The Consultants and the person
- Page 151 and 152: shall serve in that capacity, as sp
- Page 153 and 154: Extra charges for days other Rs 3,5
- Page 155 and 156: Appendix B Consultants’ Sub Consu
- Page 157 and 158: Appendix D Duties of the Client
- Page 159: Appendix F Minutes of Financial/ Co
- Page 163 and 164: " "
- Page 165 and 166: including and shall be extended fro
- Page 167 and 168: National Highways & Infrastructure
- Page 169 and 170: National Highways & Infrastructure
- Page 171 and 172: National Highways & Infrastructure
- Page 173 and 174: National Highways & Infrastructure