10. Change of Scope<br />

The change of Scope on account of variation of total length as well as 4 laned length of<br />

project Highway from the indicative length as given at Annex-1 of Letter of Invitation of<br />

the RFP shall be dealt as follows<br />

i) During the course of consultancy services in case it is considered necessary to<br />

increase/decrease the scope of services( of total length or 4 laned length as<br />

compared to indicative Length as given in the RFP) by the client the same shall be<br />

notified by Change of scope notice. Similarly, if the Consultant determines that<br />

change of scope is needed, he shall inform of the same to the Client. The Client will<br />

examine and shall either reject the proposal or issue change of scope notice.<br />

ii)<br />

The Consultancy fee shall be revised on account of change of scope as below:<br />

- In case the total length of project increase/ decrease up to more 10% of indicative length<br />

given in the RFP : No change in Consultancy Fees<br />

- In case the increase/ decrease in total length of project is more than 10 % of the indicative<br />

length as given in the RFP: The consultancy fee shall be increased/ decreased in the same<br />

proportion in which the length of the project road is increased/ decreased beyond 10%.<br />

- In case the length of 4 lane road is increased up to 10% of the length as indicated in the<br />

RFP :No change in Consultancy Fees<br />

- In case the length of 4 lane road is increased by more than 10% of the length as indicated in<br />

the RFP : The consultancy fee shall be increased by 0.25 times the average quoted rate ( Rs<br />

per km ) for the increased length of 4 lane beyond 10%<br />

iii)<br />

Length of Bypass / realignment shall not be treated as additional to the existing<br />

length of the highway for the purpose of change / variation in length.<br />

Increase/decrease in length on account of bypasses/realignment shall not be<br />

considered as change of scope. However, the total length of the project highway<br />

(including bypasses and realignment ) along the finally approved alignment shall<br />

be compared with the indicative length in the RFP for the purpose of variation.