7 Office Supplies, Utilities and Communication<br />
(Fixed Costs)<br />
7.01 Office Supplies 9 Month 0.00 INR Zero Only<br />
7.02 Drafting Supplies 9 Month 0.00 INR Zero Only<br />
7.03 Computer Running Costs 9 Month 0.00 INR Zero Only<br />
7.04 Domestic and International Communication 9 Month 0.00 INR Zero Only<br />
8 Office Furniture and Equipment (Rental)<br />
8.01 Office Furniture and Equipment 9 Month 0.00 INR Zero Only<br />
9 Reports and Document Printing<br />
9.01 Monthly Report (3 copies per month) 27 Nos 0.00 INR Zero Only<br />
9.02 Inception Report & QAP 3 Nos 0.00 INR Zero Only<br />
9.03 Environment and Social Impact Screening Report 4 Nos 0.00 INR Zero Only<br />
9.04 Draft Feasibility Report 4 Nos 0.00 INR Zero Only<br />
9.05 Final Feasibility Report 6 Nos 0.00 INR Zero Only<br />
9.06 Strip Plan with L.A. Reports 6 Nos 0.00 INR Zero Only<br />
9.07 Draft Environmental Assessment report& RAP 4 Nos 0.00 INR Zero Only<br />
9.08 Final Environmental Assessment report& RAP 6 Nos 0.00 INR Zero Only<br />
9.09 Draft Detailed Design Report & Drawings etc. Draft 4 Nos 0.00 INR Zero Only<br />
9.1 Draft Bidding Documents 6 Nos 0.00 INR Zero Only<br />
9.12 Final Detailed Project Report with Bill of Quantities, 6 Nos 0.00 INR Zero Only<br />
.13 Final Bidding Documents 6 Nos 0.00 INR Zero Only<br />
9.14 Draft 3(a) ,3(A) and 3(D)& 3G notification for land 9 Nos 0.00 INR Zero Only<br />
10 Survey and Investigation A. Topographical Survey<br />
(Fixed Rate)<br />
10.01 Topographic Survey including hire charges for<br />
equipment (GPS, Total Station, Auto Level etc.) and<br />
supply of survey Teams comprising of project<br />
survey filed staff etc. inclusive of cost of materials,<br />
labourer and construction of BM,(satellite imaginary,<br />
aerial photogrammetry if considered necessary) etc.<br />
complete<br />
159 Km 0.00 INR Zero Only<br />
11 Investigation (Fixed cost)(lumpsum)<br />
11.01 Road and Bridge Inventory 1 LumpSum 0.00 INR Zero Only<br />
11.02 BBD Test and Pavement Evaluation 1 LumpSum 0.00 INR Zero Only<br />
11.03 Roughness Survey 1 LumpSum 0.00 INR Zero Only<br />
11.04 Axle Load Survey 1 LumpSum 0.00 INR Zero Only<br />
11.05 Material Survey and Investigation 1 LumpSum 0.00 INR Zero Only<br />
11.06 Sub-grade Investigation 1 LumpSum 0.00 INR Zero Only<br />
11.07 Traffic Survey 1 LumpSum 0.00 INR Zero Only<br />
11.08 Socio-economic & Census Survey/Studies 1 LumpSum 0.00 INR Zero Only<br />
11.09 Land Acquisition Studies 1 LumpSum 0.00 INR Zero Only<br />
11.1 Any other investigations/surveys 1 LumpSum 0.00 INR Zero Only<br />
12 Estimate of ExpatriateConsultants (Name and<br />
position to be filled in below columns by the<br />
bidder)<br />
12.1 Renumeration of Expatriate Staff including per<br />
diem allowances<br />
12.11 Fill Name and Position 1 Month 0.00 INR Zero Only<br />
12.12 Fill Name and Position 1 Month 0.00 INR Zero Only<br />
12.13 Fill Name and Position 1 Month 0.00 INR Zero Only<br />
12.14 Fill Name and Position 1 Month 0.00 INR Zero Only<br />
12.15 Fill Name and Position 1 Month 0.00 INR Zero Only<br />
12.16 Fill Name and Position 1 Month 0.00 INR Zero Only<br />
12.2 Moblization and Demoblization- International<br />
Airfares (Fixed Costs) (To be filled by bidders in<br />
below columns)<br />
12.21 Position 1 Month 0.00 INR Zero Only<br />
12.22 Position 1 Month 0.00 INR Zero Only<br />
12.23 Position 1 Month 0.00 INR Zero Only<br />
12.24 Position 1 Month 0.00 INR Zero Only<br />
12.25 Position 1 Month 0.00 INR Zero Only<br />
12.26 Position 1 Month 0.00 INR Zero Only<br />
12.3 Moblization and Demoblization-Inland Travel in<br />
Home country (Fixed Costs)<br />
12.4 Other Miscellaneous expenses (Like DA, internal<br />
travel expenses other incidentals)(Fixed Cost)<br />
1 LumpSum 0.00 INR Zero Only<br />
1 LumpSum 0.00 INR Zero Only<br />
13 Sub-Soil Investigation (Boring) (Rate/m)<br />
13.01 a) Boring in all type of soils other than hard rock. 2400 Meter 0.00 INR Zero Only<br />
13.02 b)Boring in hard rock 800 Meter 0.00 INR Zero Only<br />
Total in Figures<br />
0.00 INR Zero Only<br />
Quoted Rate in Words<br />
INR Zero Only