20.06.2016 Views

REQUEST FOR PROPOSALS

6i9th772k

6i9th772k

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VIII Reports and Document Printing<br />

No.<br />

Description<br />

No. of<br />

Copies<br />

1 Monthly Report( 3 per month) 27<br />

2 Inception Report & QAP 3<br />

3 Environment and Social Impact Screening 4<br />

Report<br />

4 Draft Feasibility Report 4<br />

5 Final Feasibility Report 6<br />

6 Strip Plan with L.A. Reports 6<br />

7 Draft Environmental Assessment report& 4<br />

RAP<br />

8 Final Environmental Assessment report& 6<br />

RAP<br />

9 Draft Detailed Design Report & Drawings 4<br />

etc. Draft EMP<br />

10 Draft Bidding Documents 6<br />

11 Final Detailed Project Report with Bill of 6<br />

Quantities, Cost Estimates, Updated<br />

Drawings etc. Final EMP<br />

12 Final Bidding Documents 6<br />

13 Draft 3(a) ,3(A) and 3(D)& 3G notification 9<br />

for land acquisition (3 copies each)<br />

Rate per<br />

Copy (INR)<br />

Total<br />

Amount<br />

(INR)<br />

IX<br />

Survey and Investigation<br />

A Topographical Survey (Fixed Rate)<br />

Item Km. Rate per Km Amount (INR)<br />

Topographic Survey including hire<br />

charges for equipment (GPS, Total<br />

Station, Auto Level etc.) and supply of<br />

survey Teams comprising of project<br />

survey filed staff etc. inclusive of cost of 159<br />

materials, labourer and construction of<br />

BM,(satellite imaginary, aerial<br />

photogrammetry if considered<br />

necessary) etc. complete<br />

B<br />

Investigation (Fixed cost)<br />

No. Description Quantity Amount (INR)<br />

1 Road and Bridge Inventory LS<br />

2 BBD Test and Pavement<br />

LS<br />

Evaluation<br />

3 Roughness Survey LS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!