VIII Reports and Document Printing<br />
No.<br />
Description<br />
No. of<br />
Copies<br />
1 Monthly Report( 3 per month) 27<br />
2 Inception Report & QAP 3<br />
3 Environment and Social Impact Screening 4<br />
Report<br />
4 Draft Feasibility Report 4<br />
5 Final Feasibility Report 6<br />
6 Strip Plan with L.A. Reports 6<br />
7 Draft Environmental Assessment report& 4<br />
RAP<br />
8 Final Environmental Assessment report& 6<br />
RAP<br />
9 Draft Detailed Design Report & Drawings 4<br />
etc. Draft EMP<br />
10 Draft Bidding Documents 6<br />
11 Final Detailed Project Report with Bill of 6<br />
Quantities, Cost Estimates, Updated<br />
Drawings etc. Final EMP<br />
12 Final Bidding Documents 6<br />
13 Draft 3(a) ,3(A) and 3(D)& 3G notification 9<br />
for land acquisition (3 copies each)<br />
Rate per<br />
Copy (INR)<br />
Total<br />
Amount<br />
(INR)<br />
IX<br />
Survey and Investigation<br />
A Topographical Survey (Fixed Rate)<br />
Item Km. Rate per Km Amount (INR)<br />
Topographic Survey including hire<br />
charges for equipment (GPS, Total<br />
Station, Auto Level etc.) and supply of<br />
survey Teams comprising of project<br />
survey filed staff etc. inclusive of cost of 159<br />
materials, labourer and construction of<br />
BM,(satellite imaginary, aerial<br />
photogrammetry if considered<br />
necessary) etc. complete<br />
B<br />
Investigation (Fixed cost)<br />
No. Description Quantity Amount (INR)<br />
1 Road and Bridge Inventory LS<br />
2 BBD Test and Pavement<br />
LS<br />
Evaluation<br />
3 Roughness Survey LS