20.06.2016 Views

REQUEST FOR PROPOSALS

6i9th772k

6i9th772k

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(Form-II)<br />

Format of Financial Proposal<br />

Summary of Cost in Local and Foreign Currency ( US $ )<br />

No. Description Amount Amount<br />

(LC)* (FC)*<br />

(INR)<br />

Local Consultants<br />

I Remuneration for Local Staff (inclusive of per<br />

Diem allowance)<br />

II<br />

III<br />

IV<br />

V<br />

VI<br />

VII<br />

VIII<br />

Support Staff (inclusive of per diem allowance)<br />

Transportation*<br />

Duty Travel to Site*<br />

Office Rent*<br />

Office Supplies, Utilities and Communication*<br />

Office Furniture and Equipment (Rental)*<br />

Reports and Document Printing<br />

IX<br />

Surveys & Investigations<br />

A Topographical Survey<br />

B Investigations<br />

Contingency Expenses for pre-<br />

X Construction phase<br />

Subtotal Local Consultants :<br />

Foreign Consultants<br />

Remuneration for Expatriate Staff(inclusive of per<br />

F-I Diem allowance)<br />

F-II Mobilization and Demobilization<br />

Total Cost Net of Tax :<br />

Taxes I. Income Tax (Expatriate)<br />

and II. Import duties<br />

Duties III. Value added tax<br />

Total cost net of service tax**<br />

Service Tax<br />

TOTAL COSTS (Including Service Tax)<br />

* - The Consultant should bear in mind that the expenses under this category would be<br />

admissible for 12 months only during the DPR preparation phase. A minimum<br />

infrastructure would be permitted during the pre-construction phase (LA& Clearances)for<br />

which a separate quote may be given as stipulated above.<br />

LC* Local Currency<br />

FC* Foreign Currency US $

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!