Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference<br />
05/06.05.2010<br />
lessons learnt<br />
<strong>Offshore</strong> <strong>Wind</strong> <strong>farm</strong><br />
<strong>alpha</strong> <strong>ventus</strong><br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 1
Chronology<br />
• 2001 approval by BSH<br />
• 2005 “<strong>Offshore</strong> Stiftung” founded<br />
• 2006 Deutsche <strong>Offshore</strong> Testfeld- und<br />
Infrastruktur- Gesellschaft (DOTI) founded<br />
• 2007 January Teambuilding<br />
• 2008 Begin offshore Installation Multibrid<br />
and Substation<br />
• 2009 second phase Multibrid, begin<br />
Repower<br />
• 2010 April 27th initial operation<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 2
Foto: BSH<br />
<strong>alpha</strong> <strong>ventus</strong><br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 3
Foto: BSH<br />
<strong>alpha</strong> <strong>ventus</strong><br />
25nm<br />
north Borkum<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 4
<strong>alpha</strong> <strong>ventus</strong> park layout<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 5
BSH (Federal Maritime and Hydrographic Agency)<br />
requirements<br />
Comprehensive Health and safety Manual<br />
Comprehensive ecological investigation / monitoring<br />
Collateral clauses (e.g. maritime traffic)<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 6
<strong>alpha</strong> <strong>ventus</strong> offshore constructions<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 7
Installation of foundations<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 8
Installation of foundations<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 9
Installation of foundations<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 10
Installation of foundations<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 11
Installation of foundations<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 12
Installation of foundations<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 13
Infield cable<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 14
Infield cable<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 15
Infield cable<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 16
Infield cable<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 17
<strong>Wind</strong> turbine and topside installation<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 18
<strong>Wind</strong> turbine and topside installation<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 19
<strong>Wind</strong> turbine and topside installation<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 20
<strong>Wind</strong> turbine and topside installation<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 21
<strong>alpha</strong> <strong>ventus</strong> offshore constructions<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 22
Work safety and security concept<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 23
Several issues included in the manual<br />
„Work safety and security concept“<br />
• Communication Matrix<br />
• Work vessel & helicopter coordinator<br />
• Permit to work system<br />
• Operation centre / Offcom 24/7<br />
• Construction site emergency plan<br />
• Reporting/investigation/analyzing incidents<br />
• Investigation team<br />
• Personal qualification offshore<br />
„ Prospective risk assessment<br />
for all works offshore “<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 24
Areas planned for offshore wind <strong>farm</strong>s<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 25
Lessons learnt<br />
• HSE awareness for all procedures and<br />
operations<br />
• German laws and guidelines have to be adjusted<br />
• national improvement for search and rescue<br />
• Lack of giant equipment for <strong>Offshore</strong> wind energy<br />
• Qualified employee for all aspects of <strong>Offshore</strong> Works<br />
• technical wise almost everything is possible<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 26
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 27
Thank you for your attention<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 28
Thank you for your attention<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 29
Thank you for your attention<br />
Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 30
Thank you for your attention<br />