08.12.2012 Views

Offshore Wind farm alpha ventus - GL Group

Offshore Wind farm alpha ventus - GL Group

Offshore Wind farm alpha ventus - GL Group

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference<br />

05/06.05.2010<br />

lessons learnt<br />

<strong>Offshore</strong> <strong>Wind</strong> <strong>farm</strong><br />

<strong>alpha</strong> <strong>ventus</strong><br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 1


Chronology<br />

• 2001 approval by BSH<br />

• 2005 “<strong>Offshore</strong> Stiftung” founded<br />

• 2006 Deutsche <strong>Offshore</strong> Testfeld- und<br />

Infrastruktur- Gesellschaft (DOTI) founded<br />

• 2007 January Teambuilding<br />

• 2008 Begin offshore Installation Multibrid<br />

and Substation<br />

• 2009 second phase Multibrid, begin<br />

Repower<br />

• 2010 April 27th initial operation<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 2


Foto: BSH<br />

<strong>alpha</strong> <strong>ventus</strong><br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 3


Foto: BSH<br />

<strong>alpha</strong> <strong>ventus</strong><br />

25nm<br />

north Borkum<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 4


<strong>alpha</strong> <strong>ventus</strong> park layout<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 5


BSH (Federal Maritime and Hydrographic Agency)<br />

requirements<br />

Comprehensive Health and safety Manual<br />

Comprehensive ecological investigation / monitoring<br />

Collateral clauses (e.g. maritime traffic)<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 6


<strong>alpha</strong> <strong>ventus</strong> offshore constructions<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 7


Installation of foundations<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 8


Installation of foundations<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 9


Installation of foundations<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 10


Installation of foundations<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 11


Installation of foundations<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 12


Installation of foundations<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 13


Infield cable<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 14


Infield cable<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 15


Infield cable<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 16


Infield cable<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 17


<strong>Wind</strong> turbine and topside installation<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 18


<strong>Wind</strong> turbine and topside installation<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 19


<strong>Wind</strong> turbine and topside installation<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 20


<strong>Wind</strong> turbine and topside installation<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 21


<strong>alpha</strong> <strong>ventus</strong> offshore constructions<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 22


Work safety and security concept<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 23


Several issues included in the manual<br />

„Work safety and security concept“<br />

• Communication Matrix<br />

• Work vessel & helicopter coordinator<br />

• Permit to work system<br />

• Operation centre / Offcom 24/7<br />

• Construction site emergency plan<br />

• Reporting/investigation/analyzing incidents<br />

• Investigation team<br />

• Personal qualification offshore<br />

„ Prospective risk assessment<br />

for all works offshore “<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 24


Areas planned for offshore wind <strong>farm</strong>s<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 25


Lessons learnt<br />

• HSE awareness for all procedures and<br />

operations<br />

• German laws and guidelines have to be adjusted<br />

• national improvement for search and rescue<br />

• Lack of giant equipment for <strong>Offshore</strong> wind energy<br />

• Qualified employee for all aspects of <strong>Offshore</strong> Works<br />

• technical wise almost everything is possible<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 26


Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 27


Thank you for your attention<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 28


Thank you for your attention<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 29


Thank you for your attention<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 30


Thank you for your attention<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 31


Thank you for your attention<br />

Hamburg <strong>Offshore</strong> <strong>Wind</strong> Conference 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!