Projects under Operations as of 31 December <strong>2015</strong><br />
Switchboard, Cable Tray and Support System Manufacturing and Distributing Work:<br />
As of 31 December <strong>2015</strong>, number of the Projects where the work under which have been accepted for carrying out by<br />
the Company and the manufacturing being underway account for the total value of 79.46 million Baht which can be detailed<br />
as follows:<br />
Product Category<br />
Work Pending for Delivery<br />
(Million Baht)<br />
Estimated Time of Delivery<br />
Switchboard W 60.22 Quarter 1-2/2016<br />
Cable Tray and Support System Work 19.24 Quarter 1-2/2016<br />
Total 79.46<br />
<strong>Annual</strong> <strong>Report</strong> <strong>2015</strong><br />
High Voltage and Communication Tower and Hot-dip Galvanized Steel Fabrication Manufacturing and Distributing work<br />
As of 31 December <strong>2015</strong>, number of the Projects where the work under which have been accepted for carrying out by<br />
the Company and the manufacturing being underway account for the total value of 630 million Baht. The work worth fortyseven<br />
percent (47%) of the Project work value has already been delivered where the work value having been under the<br />
manufactures but has not yet been delivered is 330 million Baht which can be detailed as follows:<br />
Product Category<br />
Work Pending for Delivery<br />
(Million Baht)<br />
Estimated Time of Delivery<br />
High voltage tower work 282 Quarter 1-2/2016<br />
Substation steel fabrication tower work 23 Quarter 1-2/2016<br />
Telecommunication tower work 25 Quarter 1-2/2016<br />
General steel fabircation work<br />
Total 330<br />