Sci Electric Public Company Limited<br />

the jobs directly from employers and subcontract or outsource the jobs to trading partner skillful in various fields such as<br />

Consultant for Project Administration and Technique or Engineering, Contractor for the Constructions or Supplier of Raw Materials.<br />

The nature of works will thoroughly cover the providing of services and installing of electrical systems as follows:<br />

2.1 High Voltage Transmission Line System; It is the high voltage transmission line system connected from power<br />

generating system which will be transmitted to a power station or from a point of a power station to a point of another<br />

power station through high voltage transmission lines and high voltage transmission towers which are constructed to<br />

be able to take electrical voltage ranging from 69 Kilovolt (kV), 115 kV, 230 kV up to 500 kV<br />

2.2 Substation; It is the structural and system construction work within the substation that takes the power from power<br />

generation plant before being distributed to household families or industrial districts. In this connection, the Company will<br />

supply products which are steel structures of the substation in conjunction with its allies skillful in installing and constructing<br />

the substation and procure other equipment for use in the substation.<br />

2.3 Power Distribution System; It is the construction work on electrical distribution wiring system of 400 volt up to 22 kilovolt<br />

together with rehabilitating the distribution system by installing equipment in the system for more efficiency in the system.<br />

The Company places the importance on adopting the advanced technology for use in controlling and monitoring fol<br />

low-ups on the functions of the power distribution system which, in this connection, electrical voltage and efficiency on<br />

the power distributions will be reported to be aware of by the operator, thus, in the case where any point of the power<br />

distribution system has run into a problem or sustained a damage, the system will report the result back to the Control<br />

Center, resulting in the subsequently remedial actions to be able to expeditiously respond to the situation that would help<br />

reduce problem arising from the distribution system which may affect the revenues on the power distributions.<br />

The Company accounts for the past projects as follows:<br />

• High Voltage Distribution System Construction Project in Lao People’s Democratic Republic (Lao PDR) in 2009-<br />

2013 which was the work on 115 kV with the length of 150 kilometer in Lao PDR Southern Region from Salavan<br />

through Xekong onto Xe Kaman. The Company took the contracting work in the form of Turn Key in conjunction<br />

with a company from Japan, by taking the responsibility for the transmission line work.<br />

• Power Distribution System Rehabilitation Project (PDSR) during the year 2013-<strong>2015</strong> in 4 Lao PDR main towns which<br />

are Capital City of Vientianne, Thakhek, Savannakhet and Pakse of which the Company was the main<br />

contractor.<br />

3. Project Development and Investment Business<br />

The Company had foreseen the potentials and growth of power business from renewal energy, thus, prompting it to begin<br />

putting the investments on power generation from a small scale hydropower which was 3.2 megawatt Tad Salen Hydropower<br />

Plant in Xepone, Savannakhet Province, Lao PDR. In 2008, Tad Salen Power Co., Ltd., (“Tad Salen” or “TAD”), the Company’s<br />

subsidiary signed the Power Purchase Agreement with Laos State Enterprise (EDL). The dam construction began in 2010 and<br />

was complete in 2012. The Company conducted the pretests on the function before making formal distributions of the power<br />

to EDL with the concessionary period of 30 years.<br />