Understanding API ICP653 Reading 15-Worksheet-11a
Task#6 Ref Para. 1. B QW-321.4 2. C QW-304.1 3. C QW-302.2 4. A QW-301.3 5. B QW-306 6. A QW-306 7. A QW-461.9 8. A QW-302, 304 9. B QW-302.3 10. B QW-321 11. C QW-~04 12. B QW-361.1 13. B QW-322.1 Charlie Chong/ Fion Zhang
Reading: Performance Qualifications QW-300 thru QW-383 Q1. What are the retest requirements for a welder who has failed his renewal qualification test after he has received additional training or practice? (a) Complete requalification in accordance with QW-301.2. (b) A new test shall be made for each position he failed. (c) Weld a single test coupon of either plate or pipe. ANS: b Q2. What is the length of a welder's first production weld that needs to be radiographed for qualification? (a) 3' (b) 3" (c) 6“ ANS: c Charlie Chong/ Fion Zhang
- Page 15 and 16: Charlie Chong/ Fion Zhang
- Page 17 and 18: ASME SECTION IX EXERCISES Charlie C
- Page 19 and 20: TASK# 1 Read the following paragrap
- Page 21 and 22: Q5. Where are notch-toughness requi
- Page 23 and 24: Q9. How is the minimum specimen cur
- Page 25 and 26: Q13. Procedure and performance macr
- Page 27 and 28: Charlie Chong/ Fion Zhang #2
- Page 29 and 30: QW-191.1 Radiographic Examination Q
- Page 31 and 32: Q3. When may longitudinal-bend test
- Page 33 and 34: QW-100.3 Welding Procedure Specific
- Page 35 and 36: Q8. What are the test orientations
- Page 37 and 38: Task#2 Ref Para. 1. A QW-10()3 2. B
- Page 39 and 40: Reading: General Requirements QW-10
- Page 41 and 42: Q5. What constitutes a "set" of red
- Page 43 and 44: Q7. The WPS must list ___ variables
- Page 45 and 46: Task#3 Ref Para 1. A QW-484 2. C QW
- Page 47 and 48: Reading: Procedure Qualifications Q
- Page 49 and 50: Q5. The qualification of the ___is
- Page 51 and 52: QW-200.4 (b) For GTAW, SMAW, GMAW,
- Page 53 and 54: Charlie Chong/ Fion Zhang #5
- Page 55 and 56: QW-200.4 Combination of Welding Pro
- Page 57 and 58: Discussion: GTAW PQR variables: T=1
- Page 59 and 60: Q5. What limitation is invoked when
- Page 61 and 62: Q9: An organization's operational c
- Page 63 and 64: Q12. The ____ is a true record of t
- Page 65: Charlie Chong/ Fion Zhang #6
- Page 69 and 70: Q5. How are the thickness limits de
- Page 71 and 72: Q9. What welding positions on pipe
- Page 73 and 74: QW-304 Welders Except for the speci
- Page 75 and 76: TASK#7 Reading: Performance Qualifi
- Page 77 and 78: Q5. Why is the Manufacturer respons
- Page 79 and 80: Q9. When performance qualification
- Page 81 and 82: Q13. Failure of any portion of a co
- Page 83 and 84: Charlie Chong/ Fion Zhang #8
- Page 85 and 86: TASK#8 Welding Data QW-400 thru QW-
- Page 87 and 88: Q2. Under what conditions may a WPS
- Page 89 and 90: Q6. A change in a welding condition
- Page 91 and 92: Q8. The grouping of ____and____ by
- Page 93 and 94: Charlie Chong/ Fion Zhang #9
- Page 95 and 96: TASK#9 Welding Data QW-451 thru QW-
- Page 97 and 98: Q3. In reviewing the form QW-483 (P
- Page 99 and 100: Q5. The SAW process is commonly cla
- Page 101 and 102: ASME SECTION IX PRACTICE QUESTIONS
- Page 103 and 104: Q5. New Welding Procedure Specifica
- Page 105 and 106: Q9. A welder qualifying with plate
- Page 107 and 108: Q12. Charpy V-notch tests are perfo
- Page 109 and 110: Q17. A WPS must describe: A. Essent
- Page 111 and 112: Q21. For the SAW process ______ is
- Page 113 and 114: Q26. Immediate retests of welders q
- Page 115 and 116: QW-452 Performance Qualification Th
Task#6 Ref Para.<br />
1. B QW-321.4<br />
2. C QW-304.1<br />
3. C QW-302.2<br />
4. A QW-301.3<br />
5. B QW-306<br />
6. A QW-306<br />
7. A QW-461.9<br />
8. A QW-302, 304<br />
9. B QW-302.3<br />
10. B QW-321<br />
11. C QW-~04<br />
12. B QW-361.1<br />
13. B QW-322.1<br />
Charlie Chong/ Fion Zhang