Understanding API ICP653 Reading 15-Worksheet-11a
Charlie Chong/ Fion Zhang #4
Reading: Procedure Qualifications QW-200 thru QW-283 Q1. Qualification of the WPS using test coupons made of plate also qualifies for pipe and vice versa. (a) True (b) False ANS: a Q2. How does the Manufacturer attest that the information in the PQR is a true record of the variables that were used during the welding of the test coupons and that the resulting tensile, bend, or macro-etch test results are in compliance with Section IX? (a) By having the Manufacturer certify and notarize the PQR . (b) By having the welder certify the PQR (c) By having the Manufacturer certify the PQR. ANS: c Charlie Chong/ Fion Zhang
- Page 1 and 2: Charlie Chong/ Fion Zhang
- Page 3 and 4: Expert at Works Charlie Chong/ Fion
- Page 5 and 6: Expert at Works Charlie Chong/ Fion
- Page 7 and 8: Charlie Chong/ Fion Zhang Fion Zhan
- Page 9 and 10: The Magical Book of Tank Inspection
- Page 11 and 12: API 653 Exam Administration -- Publ
- Page 13 and 14: • API Recommended Practice 575, I
- Page 15 and 16: Charlie Chong/ Fion Zhang
- Page 17 and 18: ASME SECTION IX EXERCISES Charlie C
- Page 19 and 20: TASK# 1 Read the following paragrap
- Page 21 and 22: Q5. Where are notch-toughness requi
- Page 23 and 24: Q9. How is the minimum specimen cur
- Page 25 and 26: Q13. Procedure and performance macr
- Page 27 and 28: Charlie Chong/ Fion Zhang #2
- Page 29 and 30: QW-191.1 Radiographic Examination Q
- Page 31 and 32: Q3. When may longitudinal-bend test
- Page 33 and 34: QW-100.3 Welding Procedure Specific
- Page 35 and 36: Q8. What are the test orientations
- Page 37 and 38: Task#2 Ref Para. 1. A QW-10()3 2. B
- Page 39 and 40: Reading: General Requirements QW-10
- Page 41 and 42: Q5. What constitutes a "set" of red
- Page 43 and 44: Q7. The WPS must list ___ variables
- Page 45: Task#3 Ref Para 1. A QW-484 2. C QW
- Page 49 and 50: Q5. The qualification of the ___is
- Page 51 and 52: QW-200.4 (b) For GTAW, SMAW, GMAW,
- Page 53 and 54: Charlie Chong/ Fion Zhang #5
- Page 55 and 56: QW-200.4 Combination of Welding Pro
- Page 57 and 58: Discussion: GTAW PQR variables: T=1
- Page 59 and 60: Q5. What limitation is invoked when
- Page 61 and 62: Q9: An organization's operational c
- Page 63 and 64: Q12. The ____ is a true record of t
- Page 65 and 66: Charlie Chong/ Fion Zhang #6
- Page 67 and 68: Reading: Performance Qualifications
- Page 69 and 70: Q5. How are the thickness limits de
- Page 71 and 72: Q9. What welding positions on pipe
- Page 73 and 74: QW-304 Welders Except for the speci
- Page 75 and 76: TASK#7 Reading: Performance Qualifi
- Page 77 and 78: Q5. Why is the Manufacturer respons
- Page 79 and 80: Q9. When performance qualification
- Page 81 and 82: Q13. Failure of any portion of a co
- Page 83 and 84: Charlie Chong/ Fion Zhang #8
- Page 85 and 86: TASK#8 Welding Data QW-400 thru QW-
- Page 87 and 88: Q2. Under what conditions may a WPS
- Page 89 and 90: Q6. A change in a welding condition
- Page 91 and 92: Q8. The grouping of ____and____ by
- Page 93 and 94: Charlie Chong/ Fion Zhang #9
- Page 95 and 96: TASK#9 Welding Data QW-451 thru QW-
<strong>Reading</strong>: Procedure Qualifications<br />
QW-200 thru QW-283<br />
Q1. Qualification of the WPS using test coupons made of plate also qualifies<br />
for pipe and vice versa.<br />
(a) True<br />
(b) False<br />
ANS: a<br />
Q2. How does the Manufacturer attest that the information in the PQR is a<br />
true record of the variables that were used during the welding of the test<br />
coupons and that the resulting tensile, bend, or macro-etch test results are in<br />
compliance with Section IX?<br />
(a) By having the Manufacturer certify and notarize the PQR .<br />
(b) By having the welder certify the PQR<br />
(c) By having the Manufacturer certify the PQR.<br />
ANS: c<br />
Charlie Chong/ Fion Zhang