Understanding API ICP653 Reading 15-Worksheet-11a

24.03.2016 Views

Q3. The ——— is intended to provide direction for the welder, while the ——— was used in qualifying the ——— and details the test results. (a) WPS-PQR-WPQ (b) WPS-WPQ.-WPS (c) WPS-PQR-WPS, ANS: c Q4. What Figure Number is used for procedure qualification, reduced-section tension tests specimens, for pipe having an O.D. greater than 3"? (a) OW-462.1 (b) QW462.1 (c) QW462.1 ANS: Charlie Chong/ Fion Zhang

Q5. Where are notch-toughness requirements for the specimen, orientation and acceptance criteria found? (a) ASTM E208 (b) SA-370 (c) Construction Code ANS: b Q6. The radiographic acceptance criteria for welders qualified in accordance with QW-142 is found in: (a) The Construction Code (b) QW-191.2.2 (c) QW-192.2 ANS: Charlie Chong/ Fion Zhang

Q3. The ——— is intended to provide direction for the welder, while the ———<br />

was used in qualifying the ——— and details the test results.<br />

(a) WPS-PQR-WPQ<br />

(b) WPS-WPQ.-WPS<br />

(c) WPS-PQR-WPS,<br />

ANS: c<br />

Q4. What Figure Number is used for procedure qualification, reduced-section<br />

tension tests specimens, for pipe having an O.D. greater than 3"?<br />

(a) OW-462.1<br />

(b) QW462.1<br />

(c) QW462.1<br />

ANS:<br />

Charlie Chong/ Fion Zhang

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!