• API Recommended Practice 575, I
- Page 15 and 16:
Charlie Chong/ Fion Zhang
- Page 17 and 18:
ASME SECTION IX EXERCISES Charlie C
- Page 19 and 20:
TASK# 1 Read the following paragrap
- Page 21 and 22:
Q5. Where are notch-toughness requi
- Page 23 and 24:
Q9. How is the minimum specimen cur
- Page 25 and 26:
Q13. Procedure and performance macr
- Page 27 and 28:
Charlie Chong/ Fion Zhang #2
- Page 29 and 30:
QW-191.1 Radiographic Examination Q
- Page 31 and 32:
Q3. When may longitudinal-bend test
- Page 33 and 34:
QW-100.3 Welding Procedure Specific
- Page 35 and 36:
Q8. What are the test orientations
- Page 37 and 38:
Task#2 Ref Para. 1. A QW-10()3 2. B
- Page 39 and 40:
Reading: General Requirements QW-10
- Page 41 and 42:
Q5. What constitutes a "set" of red
- Page 43 and 44:
Q7. The WPS must list ___ variables
- Page 45 and 46:
Task#3 Ref Para 1. A QW-484 2. C QW
- Page 47 and 48:
Reading: Procedure Qualifications Q
- Page 49 and 50:
Q5. The qualification of the ___is
- Page 51 and 52:
QW-200.4 (b) For GTAW, SMAW, GMAW,
- Page 53 and 54:
Charlie Chong/ Fion Zhang #5
- Page 55 and 56:
QW-200.4 Combination of Welding Pro
- Page 57 and 58:
Discussion: GTAW PQR variables: T=1
- Page 59 and 60:
Q5. What limitation is invoked when
- Page 61 and 62:
Q9: An organization's operational c
- Page 63 and 64:
Q12. The ____ is a true record of t
- Page 65 and 66:
Charlie Chong/ Fion Zhang #6
- Page 67 and 68:
Reading: Performance Qualifications
- Page 69 and 70:
Q5. How are the thickness limits de
- Page 71 and 72:
Q9. What welding positions on pipe
- Page 73 and 74:
QW-304 Welders Except for the speci
- Page 75 and 76:
TASK#7 Reading: Performance Qualifi
- Page 77 and 78:
Q5. Why is the Manufacturer respons
- Page 79 and 80:
Q9. When performance qualification
- Page 81 and 82:
Q13. Failure of any portion of a co
- Page 83 and 84:
Charlie Chong/ Fion Zhang #8
- Page 85 and 86:
TASK#8 Welding Data QW-400 thru QW-
- Page 87 and 88:
Q2. Under what conditions may a WPS
- Page 89 and 90:
Q6. A change in a welding condition
- Page 91 and 92:
Q8. The grouping of ____and____ by
- Page 93 and 94:
Charlie Chong/ Fion Zhang #9
- Page 95 and 96:
TASK#9 Welding Data QW-451 thru QW-
- Page 97 and 98:
Q3. In reviewing the form QW-483 (P
- Page 99 and 100:
Q5. The SAW process is commonly cla
- Page 101 and 102: ASME SECTION IX PRACTICE QUESTIONS
- Page 103 and 104: Q5. New Welding Procedure Specifica
- Page 105 and 106: Q9. A welder qualifying with plate
- Page 107 and 108: Q12. Charpy V-notch tests are perfo
- Page 109 and 110: Q17. A WPS must describe: A. Essent
- Page 111 and 112: Q21. For the SAW process ______ is
- Page 113 and 114: Q26. Immediate retests of welders q
- Page 115 and 116: QW-452 Performance Qualification Th
- Page 117 and 118: QW-430 F-NUMBERS QW-431 General The
- Page 119 and 120: Q32. Ferrous weld metal chemical co
- Page 121 and 122: Q36. What is the basic difference b
- Page 123 and 124: QW-304 Welders Except for the speci
- Page 125 and 126: Q40. Who is responsible for qualifi
- Page 127 and 128: Q44. A repair organization has a WP
- Page 129 and 130: QW-424 Base Metals Used for Procedu
- Page 131 and 132: Q45. What positions are necessary t
- Page 133 and 134: Q48. May a GMAW, short circuit tran
- Page 135 and 136: ESW Electroslag welding (ESW) is a
- Page 137 and 138: Charlie Chong/ Fion Zhang #11
- Page 139 and 140: Q54. A welder was qualified with a
- Page 141 and 142: Charlie Chong/ Fion Zhang
- Page 143 and 144: Q55. What are the primary classific
- Page 145 and 146: Q58. Applicable essential variables
- Page 147 and 148: Q62. The test that determines the u
- Page 149 and 150: Q66. A non-essential variable may b
- Page 151: Q71. Unless notch-toughness is a co
- Page 155 and 156: Q81. A WPS must address all applica
- Page 157 and 158: Q86. A welder is qualified to weld
- Page 159 and 160: Q88. What period of inactivity from
- Page 161 and 162: Q92. Each manufacturer or contracto
- Page 163 and 164: Charlie Chong/ Fion Zhang
- Page 165 and 166: QW-405.3 A change from upward to do
- Page 167 and 168: 98. Under which of the following co
- Page 169 and 170: Charlie Chong/ Fion Zhang
- Page 171 and 172: Happy Holi Charlie Chong/ Fion Zhan
- Page 173 and 174: Happy Holi Charlie Chong/ Fion Zhan
- Page 175 and 176: Happy Holi Charlie Chong/ Fion Zhan
- Page 177 and 178: Charlie Chong/ Fion Zhang
- Page 179 and 180: Good Luck! Charlie Chong/ Fion Zhan