08.03.2016 Views

Best Practices Magazine - issue nº1 - English

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Case Study I Hayat Kimya<br />

Eurasian Plate<br />

Izmit<br />

Anatolia<br />

Major construction challenge:<br />

its location<br />

The city of Izmit is located at the beginning<br />

of the Northern Anatolian fault line, which<br />

runs along the upper zone of the peninsula<br />

and which makes up the greater part of<br />

Turkey’s territory. This stretch, parallel to<br />

the Black Sea, also coincides with the fault<br />

line that crosses the Sea of Marmara and<br />

the Bosphorus Strait.<br />

African Plate<br />

Arabian Plate<br />

To build a warehouse of these dimensions<br />

in a place with such a high rate of earthquakes,<br />

with a height of more than 45 m<br />

and with stacker cranes prepared to move<br />

two pallets at a time and operate in doubledepth<br />

racks, was a challenge never before<br />

surpassed by Mecalux. Furthermore, the<br />

warehouse was built in an area exposed<br />

18 <strong>Best</strong> <strong>Practices</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!