Australia's junior explorers - The ASIA Miner
Australia's junior explorers - The ASIA Miner
Australia's junior explorers - The ASIA Miner
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
China<br />
Follow-up exploration in Yejiaba area<br />
MINCO Gold has started an exploration<br />
program at the Longnan pr oject in Gansu<br />
province aimed at following up multiple drill<br />
targets defined in its 2010 and 2011 pr ograms.<br />
<strong>The</strong> new program is focusing primarily<br />
on the Shajinba and Baimashi sub-areas<br />
within the Yejiaba area, and includes surface<br />
trenching, sampling, drilling and tunnelling.<br />
<strong>The</strong> company has planned about 3000<br />
metres of diamond drilling in eight holes and<br />
about 3000 metres of underground tunnelling<br />
designed to follow-up the drill targets.<br />
<strong>The</strong> surface trenching and sampling is being<br />
conducted to determine the overall footprint<br />
of the multiple gold zones identified in the<br />
Yejiaba metallogenic trend.<br />
<strong>The</strong> initial parts of the pr ogram include<br />
mobilization of geological teams, initiation of<br />
surface work, and the delivery and set up of<br />
a drill rig at the Baimashi gold zone. Testing<br />
of Baimashi Zones 1 and 2, along with the<br />
corresponding induced polarization anomalies<br />
previously defined at the depth will be<br />
conducted to pr ovide data for initial r esource<br />
definition and program extensions.<br />
Canadian-based Minco Gold has successfully<br />
maintained 12 exploration permits<br />
in the south of Gansu province, collectively<br />
referred to as the Longnan project. As well<br />
as the exploration follow-up, the company<br />
has initiated construction of an access road<br />
18 | <strong>ASIA</strong> <strong>Miner</strong> | July/August 2012<br />
to the Yejiaba area facilitating the tunnelling<br />
and drilling. Minco Gold owns an exploration<br />
property portfolio covering more than<br />
1000sqkm of mineral rights in China.<br />
Meanwhile, Minco Gold’s vice president finance<br />
and chief financial officer Paul Zhang<br />
resigned during April with the company’ s<br />
corporate controller Ellen Wei appointed interim<br />
chief financial of ficer. She has been<br />
with the company since February 2005 and<br />
was appointed corporate controller in January<br />
2009.<br />
<strong>The</strong> company has planned about 3000 metres of diamond drilling<br />
in eight holes and about 3000 metres of underground tunnelling<br />
designed to follow-up the drill targets.<br />
叶家坝区域跟进的钻探作业<br />
明科金矿公司旗下的甘肃省陇南项目已经启<br />
动了勘探项目,旨在跟进2010年和2011年计<br />
划圈定的多个钻探靶区。此次计划主要关注<br />
叶家坝区域的沙金坝和白马石子区域,包括<br />
地表槽探、取样、钻探和坑探。<br />
为了跟进这些钻探靶区,公司计划实施约<br />
300米金刚石钻探、共计8个钻孔和约3000米<br />
地下坑探。地表槽探和取样正在进行之中,<br />
旨在确定在叶家坝成矿带发现的多个金矿化<br />
区域的总体生态足迹。<br />
该计划的初始部分包括地质队的调动、<br />
地表工作的初始化和白马石金成矿区域的钻<br />
机交付与安装。白马石1号与2号区域以及<br />
先前在深部确定的相应的激电异常将被进行<br />
测试,为初步的资源定义和计划的扩展提供<br />
数据。<br />
总部位于加拿大的明科金矿公司已经成功<br />
地保有甘肃省南部的12个勘探许可证,统<br />
称为陇南项目。除了跟进的钻探作业,公司<br />
启动了通向叶家坝区域的道路建设工作,以<br />
推进坑探和钻探作业。明科黄金公司在中国<br />
Ellen Wei has more than 10 years experiences<br />
with a major Chinese auditing firm<br />
and three years with Ernst & Young LLP respectively.<br />
Before being appointed as corporate<br />
controller, she served four years as<br />
the CFO for Minco Mining (China) Ltd.<br />
Minco Gold’s new exploration program is focused on the Yejiaba area of the Longnan project to follow up former<br />
promising results.<br />
拥有的勘探资产组合,覆盖的矿权面积超过<br />
1000平方公里以上。<br />
同时,明科黄金公司的财务副总裁兼首席财<br />
务官Paul Zhang先生于四月份辞职,公司财务<br />
总监Ellen Wei女士被任命为临时首席财务官。<br />
她自2005年2月开始在公司工作,于2009年1<br />
月被任命为财务总监。<br />
Ellen Wei女士在一家大型的中国审计公司工<br />
作过10年,在安永会计师事务所工作过3年。<br />
在被任命为财务总监之前,她在明科矿业(<br />
中国)有限公司担任了四年首席财务官。