PART E<br />

Physical design and materials<br />

SECTION 6<br />

Introduction<br />

INTRODUCTION<br />

SECTION 7<br />

High quality footways<br />

PART A<br />

A vision for London’s streets<br />

SECTION 8<br />

Carriageways<br />

PART B<br />

From strategy to delivery<br />

SECTION 9<br />

Crossings<br />

SECTION 10<br />

Kerbside activity<br />

PART C<br />

New measures for new challenges<br />

SECTION 11<br />

Footway amenities<br />

PART D<br />

Balancing priorities<br />

SECTION 12<br />

Safety and functionality<br />

SECTION 13<br />

Street environment<br />

PART F<br />

Appendix<br />

SECTION 14<br />

Transport interchanges<br />

+<br />

Streetscape Guidance<br />

[Part E – Physical design and materials] Footway amenities 227<br />

Procedures<br />

There are various consents and approvals<br />

required as part of the delivery process. Such as:<br />

Stage<br />

Pre-planning<br />

consent:<br />

Prior to<br />

construction:<br />

Requirement<br />

• Archaeological impact<br />

assessment (where relevant)<br />

• Arboricultural assessment<br />

(where relevant)<br />

• Ground radar survey<br />

• Topographical survey<br />

• Planning permission<br />

• Stage 1/2 Road Safety Audit<br />

• Planning permission from the<br />

relevant local planning<br />

authority<br />

• Traffic Regulation Order (for<br />

carriageway sites)<br />

• Permit for construction works<br />

• Parking suspension (where<br />

relevant)<br />

• UKPN install feeder pillar for<br />

electricity supply<br />

• Watching briefs arranged<br />

(where relevant)<br />

• S8 agreement/private lease<br />

completed<br />

• Area reinstated around<br />

foundations<br />

• Install appropriate TSRGD<br />

traffic signs and line marking<br />

Stage<br />

Prior to<br />

installation:<br />

Postinstallation:<br />

Requirement<br />

• Permit for works<br />

• Parking suspension (where<br />

relevant)<br />

• Mapping updated on local<br />

docking stations<br />

• CAT/LAT test completed<br />

• Health and safety<br />

documentation completed<br />

• Stage 3 Road Safety Audit is<br />

required as soon as possible<br />

once live, wherever possible<br />

within three months of<br />

becoming operational. Please<br />

refer to TfL SQA-0170<br />

Additional information<br />

Transport Trading Limited:<br />

London Cycle Hire Scheme Agreement, 2009:<br />

Schedule 2 – On-Street Infrastructure Statement<br />

of Requirements Lot 1<br />

Schedule 37 – Docking Station Implementation<br />

and Traffic Management