07.12.2012 Views

Strategic Moves - Regional Environmental Center for Central and ...

Strategic Moves - Regional Environmental Center for Central and ...

Strategic Moves - Regional Environmental Center for Central and ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

94<br />

C H A P T E R 4<br />

E C O N O M I C D E V E L O P M E N T A N D T H E E U A C C E S S I O N P R O C E S S<br />

TABLE 10: Indicative estimates of investment outlays <strong>for</strong> the waste sector<br />

BENEFIT TYPE AIR<br />

Albania Estimated investment needs up to 2022 are EUR 150 million <strong>for</strong> the waste sector; investment<br />

of EUR 9.8 million is <strong>for</strong>eseen <strong>for</strong> the L<strong>and</strong>fill Directive until 2012<br />

Bosnia <strong>and</strong> No in<strong>for</strong>mation available<br />

Herzegovina<br />

Croatia Estimated investment needs are EUR 7.6 billion <strong>for</strong> the waste sector. Of this, EUR 11 million<br />

are needed <strong>for</strong> the WFD (2007–2010), EUR 191 million <strong>for</strong> the L<strong>and</strong>fill Directive (2010–2018);<br />

<strong>and</strong> EUR 9 million <strong>for</strong> the Hazardous Waste Directive (2009–2013)<br />

FYR Estimated investment needs up to 2012 are EUR 211 million <strong>for</strong> the waste sector. Of this,<br />

Macedonia EUR 400 million are needed <strong>for</strong> the WFD; EUR 6 billion <strong>for</strong> the L<strong>and</strong>fill Directive;<br />

EUR 500 million <strong>for</strong> the Hazardous Waste Directive; EUR 400 million <strong>for</strong> the Sewage Sludge<br />

Directive; <strong>and</strong> EUR 300 million <strong>for</strong> the Incineration Directive<br />

Kosovo (as Estimated investment needs up to 2012 are EUR 4.6 million <strong>for</strong> the waste sector. Of this,<br />

defined under EUR 1.2 million are needed <strong>for</strong> the WFD (2007–2013); EUR 0.7 million <strong>for</strong> the L<strong>and</strong>fill Directive<br />

UNSCR 1244) (2008–2012); EUR 1.041 million <strong>for</strong> the Hazardous Waste Directive (2007–2012);<br />

<strong>and</strong> EUR 1.75 million <strong>for</strong> the Incineration Directive (2008–2012)<br />

Montenegro Estimated investment needs are EUR 129.7 million, of which EUR 128.5 million are investments,<br />

remediation <strong>and</strong> management costs; <strong>and</strong> EUR 1.18 million administrative costs<br />

Source: REC survey, 2009<br />

TABLE 11: Infrastructure facility needs identified in the waste sector in Serbia<br />

29 regional sanitary 44 transfer 17 recycling 7 composting 4 incinerators<br />

l<strong>and</strong>fills <strong>for</strong> 160 stations <strong>for</strong> 63 centres <strong>for</strong> 160 facilities <strong>for</strong> <strong>for</strong> 160<br />

municipalities municipalities municipalities 146 municipalities municipalities<br />

Source: National Sustainable Development Strategy 2008<br />

S T R AT E G I C M O V E S<br />

need <strong>for</strong> wide-ranging monitoring together with facilities <strong>and</strong> data processing. As in<br />

the waste sector, budgets need to be allocated <strong>for</strong> human <strong>and</strong> institutional reorganisation<br />

<strong>and</strong> training (REC <strong>and</strong> Umweltbundesamt GmbH, 2008).<br />

Air quality sector<br />

The major costs of implementing the air quality directives will be borne by the<br />

source operators, who will need to cover the costs of emission abatement equipment,<br />

the upgrading of existing plants or the installation of new plants. Funds there<strong>for</strong>e<br />

need to be raised <strong>for</strong> capital investment <strong>and</strong> any recurrent operational costs.<br />

The application of the air quality directives will also require the provision of training<br />

to ensure that staff have sufficient competencies to per<strong>for</strong>m the required tasks<br />

in relation to air quality monitoring, modelling, management, planning, <strong>and</strong> regulation<br />

<strong>and</strong> en<strong>for</strong>cement.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!