Strategic Moves - Regional Environmental Center for Central and ...
Strategic Moves - Regional Environmental Center for Central and ...
Strategic Moves - Regional Environmental Center for Central and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
242<br />
A N N E X E S<br />
A N N E X 5<br />
Serbia (continued)<br />
PROJECT TITLE PROJECT DESCRIPTION TOTAL COST OF<br />
PROJECT (EUR)<br />
Waste projects (continued)<br />
Investment into technical systems <strong>for</strong> environmen- Improvement of environmental conditions in the 6 million<br />
tal protection from the existing trash dump in Nis region. Population benefiting from project (0.236 million secured<br />
implementation: 257,341. from city budget)<br />
Recultivation <strong>and</strong> upgrading of the existing Badra Improvement of environmental conditions in the 0.994 million<br />
l<strong>and</strong>fill in Svilajnac region. Population benefiting directly from project<br />
implementation: 38,000.<br />
Plant <strong>for</strong> briquette production in Kolubara Population benefiting from project 6 million<br />
implementation: 100,000.<br />
<strong>Regional</strong> l<strong>and</strong>fill — Valjevo Up to 30 percent of regional waste will be recycled 19.5 million<br />
<strong>Regional</strong> l<strong>and</strong>fill — Zajecar Development of regional waste management <strong>for</strong><br />
seven municipalities. Population benefiting from<br />
project implementation: 250,000.<br />
15 million<br />
Smederevo sanitary l<strong>and</strong>fill 9.7 million<br />
<strong>Regional</strong> l<strong>and</strong>fill — Nova Varos 5 million<br />
Protection of the Raska River — Sanitation of<br />
exis ting l<strong>and</strong>fills <strong>and</strong> feasibility study<br />
<strong>for</strong> the regional l<strong>and</strong>fill<br />
Water projects<br />
6.12 million<br />
Upgrade <strong>and</strong> extension of the “Kolubara-Prerada” Improvement of water quality of the Kolubara <strong>and</strong> 4.76 million<br />
industrial facility WWTP Sava Rivers. Population benefiting directly from project<br />
implementation: 64,000.<br />
Rejuvenation of Lake Ludas Improved water resources management <strong>for</strong> the region. 3.861 million<br />
Population benefiting directly from project: 150,000.<br />
Improving the sewerage system of the oil Reducing pollution of river Danube. Population directly 3.7 million<br />
refinery in Novi Sad benefiting from project implementation: 350,000.<br />
Collection <strong>and</strong> treatment of wastewater in Reduced transboundary water pollution. Population 5.54 million<br />
Vladicin Han municipality directly benefiting from project implementation: 24,000. (0.55 million secured)<br />
Water utilities in technological park zone in Vrsac 2.3 million<br />
Reconstruction of the water source of “Setonje”<br />
<strong>and</strong> transport pipeline — Petrovac(Branicevo district)<br />
3.2 million<br />
Feasibility study <strong>for</strong> collection, transportation <strong>and</strong><br />
treatment of wastewater in 10 municipalities<br />
Reduction of transboundary water pollution 1.6 million<br />
S T R AT E G I C M O V E S