FUNDING PROJECT PROGRESS<br />

NEEDS (EUR)<br />

39.3 million First phase of the project, including reconstruction of existing WWTP, is completed.<br />

Phase II, development of new feasibility study <strong>and</strong> construction of new WWTP, is in the preparation stage.<br />

The project was approved <strong>for</strong> financing the project documentation by IPF.<br />

3.1 million Both municipalities signed a contract with KfW in Dec 2007. EUR 2.5 million is secured <strong>for</strong> Kotor<br />

(Kotor: 1.3 <strong>and</strong> <strong>and</strong> 1.2 million is secured <strong>for</strong> Tivat.<br />

Tivat: 1.8 Phase I is in the final stage.<br />

(5,9 million The preparatory stage of Phase II is completed <strong>and</strong> will be followed by developing project<br />

<strong>for</strong> Phase III) <strong>and</strong> tender documentation.<br />

For Phase III, an additional 10 million will be needed<br />

3.1 million Municipality of Niksic signed a contract with the Niksic brewery, which will be obliged<br />

to build a pre-treatment WW facility.<br />

The preparation of tender documentation is currently in progress.<br />

EUR 7 million secured from EIB <strong>and</strong> EUR 2.7 million municipal co-financing)<br />

Application <strong>for</strong> IPA financing was made.<br />

4.8 million EUR 11.3 million is expected as EIB loan.<br />

11.37 million Project implementation is envisaged in three phases, with an overall duration of five years (Phase I:<br />

preparation of FS (ongoing); Phase II: technical documentation <strong>and</strong> tender; Phase III: construction).<br />

EUR 9.1 million secured from KfW bank; EUR 4.2 million from Government of Montenegro<br />

FS was prepared.<br />

2 million EUR 1.5 million secured from EIB <strong>and</strong> EUR 0.5 million local contribution.<br />

5 million Project implementation is envisaged in three phases with an overall duration of five years (Phase I:<br />

preparation of FS (ongoing); Phase II: technical documentation <strong>and</strong> tender; Phase III: construction).<br />

2 million FS <strong>and</strong> EIA are prepared.<br />

EUR 1.84 million secured from Municipal Window <strong>and</strong> EUR 3.67 million from EIB<br />

24 million Project implementation is envisaged in three phases with an overall duration of five years (Phase I:<br />

preparation of FS (ongoing); Phase II: technical documentation <strong>and</strong> tender; Phase III: construction).<br />

FS was finalised in 2009.<br />

FUNDING PROJECT PROGRESS<br />

NEEDS (EUR)<br />

11 million EUR 3 million secured from IPA 2009, <strong>for</strong> all necessary documentation (l<strong>and</strong>-use plans, location<br />

<strong>and</strong> hydrogeological studies, conceptual <strong>and</strong> detailed design, FS, EIA study <strong>and</strong> all necessary permits).<br />

After Phase 1, the remaining EUR 11 million <strong>for</strong> construction will be submitted <strong>for</strong> IPA 2011.<br />

4.4 million Pre-feasibility study, urban plan <strong>and</strong> strategic assessment of financial resources were completed in 2008.<br />

EUR 0.585 million were secured from the NIP <strong>and</strong> an application made <strong>for</strong> additional IPA funds<br />

of EUR 0.585 million <strong>for</strong> the feasibility study.<br />

Negotiations started between the municipality <strong>and</strong> private sector about the recycling technology used.<br />

3.57 million Feasibility study is available.<br />