FUNDING PROJECT PROGRESS<br />

NEEDS (EUR)<br />

4.5 million Included in NEAP.<br />

Project developed in collaboration with UNDP.<br />

The project is in the initial preparation of the project fiche/scope.<br />

Pre-feasibility study <strong>and</strong> EIA exist.<br />

10 million Included in NEAP.<br />

The Kosovo <strong>Environmental</strong> Action Plan 2006–2010 lists this project.<br />

2 million Included in NEAP.<br />

In collaboration with the municipality of Hani i Elezit <strong>and</strong> MESP the project proposal is in its initial preparation stage.<br />

The project is in the process of tendering <strong>and</strong> expression of interest.<br />

37.77 million Project is listed in the development strategy <strong>for</strong> Kosovo 2007–2013, the NEAP<br />

<strong>and</strong> the National Strategy <strong>for</strong> Wastewater.<br />

Project was presented to the donor conference <strong>for</strong> Kosovo (as defined under UNSCR) in July 2008.<br />

93.694 million Included in NEAP.<br />

Project was presented to the donor conference <strong>for</strong> Kosovo (as defined under UNSCR 1244) in July 2008.<br />

Ownership issues are not settled.<br />

127.89 million Project included in the draft development strategy <strong>for</strong> Kosovo (as defined<br />

under UNSCR 1244) 2007–2013 <strong>and</strong> the NEAP.<br />

Project was presented to the donor conference <strong>for</strong> Kosovo (as defined under UNSCR 1244) in July 2008.<br />

73.872 million Included in NEAP.<br />

Project was presented to the donor conference <strong>for</strong> Kosovo (as defined under UNSCR 1244) in July 2008.<br />

The feasibility study, financed by KfW, has been completed.<br />

45.283 million Included in draft development strategy <strong>for</strong> Kosovo (as defined under UNSCR 1244) 2007–2013 <strong>and</strong> NEAP.<br />

Pre-feasibility study is completed.<br />

The project was presented to the donor conference <strong>for</strong> Kosovo (as defined under UNSCR 1244) in July 2008.<br />

56.793 million Included in draft development strategy <strong>for</strong> Kosovo 2007-2013 <strong>and</strong> NEAP.<br />

Pre-feasibility study completed.<br />

The project was presented to the donor conference <strong>for</strong> Kosovo in July 2008.<br />

62.067 million Included in draft development strategy <strong>for</strong> Kosovo (as defined under UNSCR 1244) 2007–2013 <strong>and</strong> NEAP.<br />

The project was presented to the donor conference <strong>for</strong> Kosovo (as defined under UNSCR 1244) in July 2008.<br />

Implemented by the Pristina water company.<br />

Feasibility study completed in 2007.<br />