FUNDING PROJECT PROGRESS<br />
NEEDS (EUR)<br />
22 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />
is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />
L<strong>and</strong> acquisition process is ongoing.<br />
12 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />
is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />
L<strong>and</strong> acquisition process is ongoing.<br />
12 million The project is on the EPOP 2007–2009 list.<br />
Project preparation <strong>and</strong> construction are envisaged through PPP.<br />
- Project co-financed by Futureprofit <strong>and</strong> Croatian Waters.<br />
- The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. TA<br />
<strong>for</strong> completing IPA application is assured.<br />
DABLAS/DIF is supporting the feasibility study, including cost benefit analysis.<br />
Project pre-appraisal from EC done in June 2005.<br />
- The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. TA <strong>for</strong> preparing IPA<br />
application assured (EBRD).<br />
Pre-feasibility study is completed.<br />
Co-financing is coming from project’s own sources.<br />
- The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
0.4 million The project is on the EPOP 2007-2009 list <strong>and</strong> in the IPA project pipeline.<br />
The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />
<strong>and</strong> feasibility study will be developed through IPA technical assistance pipeline.<br />
The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />
<strong>and</strong> feasibility study will be developed through IPA TA pipeline.<br />
The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />
<strong>and</strong> feasibility study will be developed through IPA TA pipeline,<br />
There is no funding <strong>for</strong> the project available yet, but IPA TA is expected.<br />
The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />
<strong>and</strong> feasibility study will be developed through IPA TA pipeline.<br />
The project is included on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
The project is included on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
Location permit issued, the technical documentation <strong>for</strong> the first phase<br />
will be co-financed 50 percent from Croatian Waters <strong>and</strong> 50 percent from the town of Samobor.<br />
The project is included on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
Conceptual design <strong>and</strong> EIA developed. Part of collector obtained location<br />
<strong>and</strong> part of collector obtained building permit.<br />
A N N E X E S<br />
A N N E X 5<br />
S T R AT E G I C M O V E S 233