FUNDING PROJECT PROGRESS<br />

NEEDS (EUR)<br />

22 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />

is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />

L<strong>and</strong> acquisition process is ongoing.<br />

12 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />

is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />

L<strong>and</strong> acquisition process is ongoing.<br />

12 million The project is on the EPOP 2007–2009 list.<br />

Project preparation <strong>and</strong> construction are envisaged through PPP.<br />

- Project co-financed by Futureprofit <strong>and</strong> Croatian Waters.<br />

- The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. TA<br />

<strong>for</strong> completing IPA application is assured.<br />

DABLAS/DIF is supporting the feasibility study, including cost benefit analysis.<br />

Project pre-appraisal from EC done in June 2005.<br />

- The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. TA <strong>for</strong> preparing IPA<br />

application assured (EBRD).<br />

Pre-feasibility study is completed.<br />

Co-financing is coming from project’s own sources.<br />

- The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />

0.4 million The project is on the EPOP 2007-2009 list <strong>and</strong> in the IPA project pipeline.<br />

The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />

The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />

<strong>and</strong> feasibility study will be developed through IPA technical assistance pipeline.<br />

The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />

<strong>and</strong> feasibility study will be developed through IPA TA pipeline.<br />

The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />

<strong>and</strong> feasibility study will be developed through IPA TA pipeline,<br />

There is no funding <strong>for</strong> the project available yet, but IPA TA is expected.<br />

The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. IPA application<br />

<strong>and</strong> feasibility study will be developed through IPA TA pipeline.<br />

The project is included on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />

The project is included on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />

Location permit issued, the technical documentation <strong>for</strong> the first phase<br />

will be co-financed 50 percent from Croatian Waters <strong>and</strong> 50 percent from the town of Samobor.<br />

The project is included on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />

Conceptual design <strong>and</strong> EIA developed. Part of collector obtained location<br />

<strong>and</strong> part of collector obtained building permit.<br />