FUNDING PROJECT PROGRESS<br />
NEEDS (EUR)<br />
12 million Project is co-financed by local budget, <strong>Environmental</strong> Protection <strong>and</strong> Energy Efficiency Fund <strong>and</strong> Phare 2006.<br />
Construction is envisaged through IPA 2010–2011.<br />
12 million Project was added to this list in November 2007.<br />
Location of the WMC has not yet been defined.<br />
20 million Included in EPOP 2007–2009.<br />
Priority of the National Action Plan (NAP) <strong>for</strong> the Protection of the Mediterranean Sea<br />
against Pollution from L<strong>and</strong>-Based Sources.<br />
Remediation <strong>and</strong> closure plan is completed.<br />
EPEEF co-financed project with EUR 2.4 million.<br />
Funds <strong>for</strong> project preparation planned to be secured through IPA OP 2007–2009<br />
<strong>and</strong> IPA OP 2010–2011. Funds <strong>for</strong> co-financing of remediation will be secured through SF OP 2011–2013.<br />
0,026 million Preparation of project documentation <strong>and</strong> permits is tendered out <strong>and</strong> all permits were due to<br />
be issued by September 2009.<br />
Additional co-financing is <strong>for</strong>eseen from EPEEF. Funds secured <strong>for</strong> preparation of project documentation.<br />
12 million Included in EPOP 2007–2009.<br />
Project is awaiting necessary permits.<br />
Location of WMC has not yet been defined.<br />
Investment value was re-estimated.<br />
24 million (loan) Included in EPOP 2007–2009 <strong>and</strong> IPA project pipeline. Construction is envisaged<br />
through IPA 2010–2011.<br />
Feasibility study completed. Building permit issued. Other project documentation is in preparation.<br />
Project is co-financed by Phare 2006, local budget <strong>and</strong> EPEEF.<br />
Investment value approximated.<br />
27.2 million Included in EPOP 2007–2009.<br />
Project is co-financed by EPEEF <strong>and</strong> CARDS 2002 TA (FS).<br />
IPA application is submitted.<br />
L<strong>and</strong> acquisition process is ongoing.<br />
1.1 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
The project is co-financed by EPEEF (EUR 1.1 million).<br />
Preparation works are in progress.<br />
The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline.<br />
12 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />
is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />
Start-up of project technical documentation design.<br />
12 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />
is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />
Start-up of project technical documentation design.<br />
12 million The project is on the EPOP 2007–2009 list <strong>and</strong> in the IPA project pipeline. Project preparation<br />
is envisaged through IPA 2010–2011, <strong>and</strong> construction through SF OP 2011–2013.<br />
The project is co-financed by EPEEF <strong>for</strong> investigation works on WMC locations.<br />
Start-up of project technical documentation design.<br />