FUNDING PROJECT PROGRESS<br />

NEEDS (EUR)<br />

0.3 million Detailed engineering design completed.<br />

Feasibility study financed by the state budget to a cost of EUR 0.52 million. To be started in 2009.<br />

The project is included in the Mid-term Budget Plan 2009–2011 <strong>and</strong> planned to start in 2011.<br />

EUR 2.2 million is secured from the state budget.<br />

0.3 million Detailed engineering design completed.<br />

Feasibility study financed in 2009 by the state budget (EUR 0.5 million)<br />

The project is included in the Mid-term Budget Plan 2009–2011 <strong>and</strong> planned to start in 2011.<br />

EUR 2.2 million secured from the state budget.<br />

5.83 million Project is listed in the priorities of the Mid-Term Budget Plan 2009–2011<br />

<strong>and</strong> is part of the 2008 IPA/EU investment funds.<br />

EUR 0.164 million secured from state budget <strong>for</strong> feasibility study.<br />

Another EUR 1.5 million budget support is under discussion.<br />

The MPTWW is in discussions with the <strong>Regional</strong> Council of Vlora about the location of the l<strong>and</strong>fill.<br />

N/A Listed as a high-priority project of the Ministry of Environment.<br />

Project is funded by CARDS 2005.<br />

Feasibility study is completed.<br />

Implementation works were started.<br />

Project deadline is November 2009.<br />

3.6 million Negotiations under way with KfW <strong>for</strong> the design of the project.<br />

Project is included in the Mid-Term Budget Plan 2009–2011.<br />

EUR 1.4 million secured from state budget <strong>for</strong> the first phase<br />

Waste management project implemented in Korca region with SIDA support.<br />

0.3 million Project is part of the Mid-Term Budget Plan 2009–2011.<br />

Feasibility study planned in 2009.<br />

EUR 2.2 million <strong>for</strong> the first phase secured from the state budget.<br />

0.3 million Project is part of the Mid-Term Budget Plan 2009–2011.<br />

Feasibility study planned in 2009.<br />

EUR 2.2. million <strong>for</strong> the first phase secured from the state budget.<br />

0.3 million The project is included in the Cross-Cutting Strategy on Environment (2007).<br />

The project is planned to enter into the implementation phase by 2011 <strong>and</strong> to be completed by 2013.<br />

EUR 2.2 million secured from the state budget.<br />