198<br />

C H A P T E R 8<br />

P R I O R I T I S AT I O N O F I N F R A S T R U C T U R E P R O J E C T S — T H E P E I P L I S T S<br />

TABLE 25: Summary of PEIP projects that secured complete financing in the 2007–2009 period<br />

COUNTRY PROJECT VALUE PROJECT SUMMARY<br />

(MILLION EUR)<br />

Albania<br />

Croatia<br />

S T R AT E G I C M O V E S<br />

4.0 Waste management plan <strong>and</strong> l<strong>and</strong>fill construction <strong>for</strong> the city of Shkodra<br />

51.1 Mariscina county waste management centre (near Rijeka)<br />

57.8 Kastijun regional waste management centre (near Pula)<br />

13.5 Remediation of the red sludge lagoon of the <strong>for</strong>mer alumina factory (near Obrovac)<br />

5.2 Remediation <strong>and</strong> expansion of the Sagulje-Ivik municipal waste l<strong>and</strong>fill<br />

(near Nova Gradiska)<br />

4.0 Establishment of the national network <strong>for</strong> permanent air quality monitoring<br />

in the Republic of Croatia<br />

31.1 Wastewater treatment plant in Slavonski Brod<br />

Kosovo (as defined under UNSCR 1244)<br />

1.5 Wastewater treatment of Trepca Arana lead zinc mine<br />

3.5 Rehabilitation of the ash l<strong>and</strong>fills of the Kosova A <strong>and</strong> B power plants: Transportation<br />

of ashes from existing l<strong>and</strong>fills to the Mirash <strong>and</strong> Bardh mining sites<br />

1.5 Rehabilitation of the ash l<strong>and</strong>fills of the Kosova A <strong>and</strong> B power plants:<br />

Complete recultivation of existing ash l<strong>and</strong>fills<br />

1.5 Rehabilitation of the ash l<strong>and</strong>fills of the Kosova A <strong>and</strong> B power plants:<br />

Hydroseeding method<br />

Montenegro<br />

7.5 Remediation measures <strong>for</strong> Mojkovac mining waste disposal site<br />

11.8 Closure <strong>and</strong> remediation of the existing waste disposal site <strong>and</strong> construction<br />

of a new Podgorica l<strong>and</strong>fill, along with a recycling centre<br />

Serbia<br />

18.6 Upgrade <strong>and</strong> extension of wastewater treatment plant in Subotica<br />

2.0 Equipment supply <strong>for</strong> the recultivation <strong>and</strong> preservation of the ash<br />

<strong>and</strong> slag deposit in Kolubara<br />

In Bosnia <strong>and</strong> Herzegovina, four projects received significant amounts of<br />

funding, although not sufficient to begin the construction phase, thus they are still<br />

included on the PEIP lists. However, the overall amounts committed to projects on<br />

the PEIP lists in the 2007–2009 period are significant (at around EUR 78 million).<br />

For the water supply <strong>and</strong> wastewater treatment project of the city of Mostar<br />

<strong>and</strong> surrounding settlements, the conceptual design <strong>and</strong> feasibility study were completed.<br />

The preparation of the design <strong>for</strong> the main collector of the sewerage system<br />

was contracted thanks to a World Bank (GEF) grant of USD 2.8 million. Subject<br />

to the finalisation of the detailed design, the EIB will provide a loan to the amount