Strategic Moves - Regional Environmental Center for Central and ...
Strategic Moves - Regional Environmental Center for Central and ...
Strategic Moves - Regional Environmental Center for Central and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TABLE 23: <strong>Environmental</strong> projects supported by the IPF in 2009<br />
It is intended to be coherent with the IPA planning documents <strong>and</strong> with national<br />
<strong>and</strong> multi-beneficiary programmes. The Western Balkans Infrastructure Initiative,<br />
the intermediate step towards the creation of the WBIF, will be based on the<br />
following components: a) the IPF; b) a joint grant facility receiving grant resources<br />
allocated from the EC IPA through the IPF, grant contributions from the EIB, the<br />
EBRD <strong>and</strong> the CEB, <strong>and</strong> bilateral grant contributions from member states <strong>and</strong><br />
other donors through the European Western Balkans Joint Fund (EWBJF); <strong>and</strong><br />
c) a joint lending facility coordinated by the partner IFIs.<br />
The framework will be consistent with the IPA <strong>and</strong> will enhance the ownership<br />
of the beneficiaries (EC SEC [2009] 1309).<br />
The Western Balkans Investment Coordination Plat<strong>for</strong>m (WBICP) was<br />
launched by the EC <strong>and</strong> partner IFIs (CEB, EBRD, EIB) with the aim of preparing<br />
the ground <strong>for</strong> the WBIF (EC, 2009). The WBICP website currently provides<br />
in<strong>for</strong>mation <strong>and</strong> tools to support infrastructure investment coordination among all<br />
regional donors. The coordination plat<strong>for</strong>m is based on a comprehensive review of<br />
ongoing <strong>and</strong> planned programmes <strong>and</strong> activities implemented by the EC, IFIs <strong>and</strong><br />
bilateral donors in the region in the field of infrastructure (WBICP website). The<br />
general objective is to provide country beneficiaries with a global overview of existing<br />
facilities <strong>and</strong> instruments applied <strong>for</strong> financial assistance both at national<br />
<strong>and</strong> regional levels. The sectors covered will include transport, energy, environment<br />
<strong>and</strong> social. Other programmes, funds <strong>and</strong> initiatives funded from national<br />
sources will also be included. A mapping exercise will address all <strong>for</strong>ms of delivery<br />
methods such as non-reimbursable grants, different types of lending programmes<br />
<strong>and</strong> loans, grant co-financing, soft technical assistance <strong>and</strong> capacity-building measures<br />
associated with the provision of investments.<br />
C H A P T E R 7<br />
F I N A N C I N G E N V I R O N M E N TA L I N F R A S T R U C T U R E I N V E S T M E N T S<br />
TITLE COUNTRY/IES SUBSECTOR PROJECT SCOPE<br />
Detailed Designs <strong>for</strong> Lezha Albania Water A wastewater treatment plant is under construction.<br />
City <strong>and</strong> Shengjin protection Scoping mission planned to define design specifications<br />
Sewerage Network <strong>and</strong> implement the detailed design project.<br />
Kamza Water Supply <strong>and</strong> Albania Water Scoping mission planned to complete ToR <strong>and</strong> implement<br />
Sewerage Project Feasibility supply the feasibility study to determine long-term investment needs<br />
Study <strong>and</strong> priority investment programme.<br />
Detailed Designs <strong>for</strong> the Albania Water There is an urgent need to exp<strong>and</strong> the capacity of the existing<br />
Extension of Kavaja protection WWTP in Kavaja to treat sewerage from Golemi beach.<br />
Wastewater Treatment Plant Scoping mission planned to determine design parameters<br />
<strong>and</strong> <strong>for</strong> Golemi Sewerage<br />
Network<br />
<strong>and</strong> implement the detailed design project.<br />
Berane Wastewater Montenegro Water Currently water losses are high <strong>and</strong> the wastewater collection<br />
Treatment Plant Feasibility protection <strong>and</strong> treatment infrastructure is inadequate.<br />
Study Feasibility study planned to prepare long-term strategic<br />
investment plans <strong>and</strong> a bankable priority investment project<br />
in relation to water <strong>and</strong> wastewater.<br />
S T R AT E G I C M O V E S 179