Strategic Moves - Regional Environmental Center for Central and ...
Strategic Moves - Regional Environmental Center for Central and ...
Strategic Moves - Regional Environmental Center for Central and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
FIGURE 16: IPA allocations to SEE countries per capita (2007–2012)<br />
EUR<br />
70<br />
60<br />
50<br />
40<br />
30<br />
20<br />
10<br />
0<br />
Albania Bosnia <strong>and</strong><br />
Herzegovina<br />
related projects, while multi-beneficiary programmes directed funding totalling<br />
EUR 3.7 million to a number of environment-related projects. Under IPA Component<br />
III, approximately EUR 280 million were allocated to the environment in<br />
2007 to 2009 (EC, 2009).<br />
Component III of the IPA, open to c<strong>and</strong>idate countries, also focuses on the environment<br />
via operational programmes (OPs), which define the area of involvement<br />
(technical assistance, water management or solid waste management) <strong>and</strong><br />
indicate the investment projects to be supported. An operational programme constitutes<br />
the overarching document defining a number of short-term <strong>and</strong> mid-term<br />
national environmental priorities <strong>and</strong> objectives that need to be addressed in the<br />
current programming period. It draws on existing EU <strong>and</strong> national environmental<br />
policies <strong>and</strong> strategies <strong>and</strong> is designed to prepare national institutions to meet the<br />
environmental requirements of the EU accession process. One of the specific objectives<br />
of the Environment Protection OP (EPOP) is to support investments in<br />
the environmental infrastructure sector.<br />
Technical assistance <strong>for</strong> rein<strong>for</strong>cing administrative capacity <strong>for</strong> the implementation<br />
of assistance delivered under the EPOP constitutes an additional priority.<br />
C H A P T E R 7<br />
F I N A N C I N G E N V I R O N M E N TA L I N F R A S T R U C T U R E I N V E S T M E N T S<br />
Croatia Kosovo (under FYR<br />
UNSCR 1244) Macedonia<br />
2007 2008 2009 2010 2011 2012<br />
Source: EC, DG Enlargement<br />
Montenegro<br />
Serbia<br />
S T R AT E G I C M O V E S 159