142<br />

C H A P T E R 6<br />

WAT E R A N D WA S T E U T I L I T I E S I N S E E — S TAT U S A N D R E F O R M<br />

TABLE 18: Conditions <strong>for</strong> the successful implementation of private sector options<br />

CONDITION SERVICE MANAGEMENT LEASE BOT CONCESSION DIVESTITURE<br />

CONTRACT CONTRACT (BULK) (RETAIL)<br />

Stakeholder Unimportant Low to moderate Moderate to high Moderate to high High levels High levels<br />

support <strong>and</strong><br />

political<br />

commitment<br />

levels needed levels needed levels needed needed needed<br />

Cost-recovering Not necessary Preferred but Necessary Preferred Necessary Necessary<br />

tariffs in the short not necessary<br />

term in the short term<br />

Autonomy of<br />

the utility<br />

Unimportant Important Very important Unimportant Very important Very important<br />

Good system Possible to Sufficient Good Good Good Good<br />

in<strong>for</strong>mation proceed with in<strong>for</strong>mation in<strong>for</strong>mation in<strong>for</strong>mation in<strong>for</strong>mation in<strong>for</strong>mation<br />

only limited required to required required required required<br />

in<strong>for</strong>mation set incentives<br />

Developed Minimal Minimal Strong capacity Strong capacity Strong Strong<br />

regulatory monitoring monitoring <strong>for</strong> regulation <strong>for</strong> regulation regulatory regulatory<br />

framework capacity needed capacity needed <strong>and</strong> coordination <strong>and</strong> coordination capacity capacity<br />

needed needed needed<br />

Good country Not necessary Not necessary Not necessary Higher rating Higher rating Higher rating<br />

credit rating (limited will reduce will reduce will reduce<br />

relevance) costs costs costs<br />

Source: Toolkit <strong>for</strong> Private Participation in Water <strong>and</strong> Sanitation, World Bank, 2000 (adjusted)<br />

S T R AT E G I C M O V E S<br />

Risks:<br />

• The lack of an adequate waste fee collection structure may result in insufficient<br />

financial means to conclude a contract.<br />

• Local politicians should accept a certain level of independence on the part of<br />

solid waste management services: ongoing influence over collection activities is<br />

no longer possible.<br />

• If an insufficient number of private companies are interested, the competition<br />

may not be optimal, resulting in a less than optimum price/quality ratio.<br />

• If the municipal organisation is not developed — due, <strong>for</strong> example, to various<br />

changes in the number of municipalities in the past — the control function of<br />

the municipality may be insufficient.<br />

• Poor-quality tender documentation may result in the need <strong>for</strong> additional<br />

arrangements. The private company that already has a contract may misuse its<br />

position <strong>and</strong> impose unfavourable conditions <strong>for</strong> the additional services.