Insulation
XAiIs
XAiIs
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
11<br />
2015 Key Targets<br />
Energy and Greenhouse Gas Emissions<br />
During 2015 work will continue to focus on initiatives that contribute towards the 2018 net zero energy target. The AD plant will move<br />
into full use.<br />
Raw Material Use & Manufacturing Efficiency<br />
The focus on continuous improvement will continue in 2015, with the aim of achieving World Class Operations Management (WCOM)<br />
Gold in Pembridge in 2015 and across all sites by 2018. A particular emphasis will be placed on improvements in the manufacturing<br />
process.<br />
Biodiversity and Land Management<br />
In 2015 Kingspan <strong>Insulation</strong> aims to repeat the biodiversity study carried out on the Pembridge site.<br />
Sustainability Reporting<br />
Investigations into the requirements for GRI4 reporting will take place in 2015, and an assessment as to the feasibility of moving this<br />
report to this level in the future.<br />
Kingspan <strong>Insulation</strong>’s third manufacturing site, at Basildon, Essex, is currently outside the scope of this report due to a much lower<br />
baseline of sustainability reporting. During 2015 planning will take place to develop the sustainability reporting systems at this location.<br />
Kingspan <strong>Insulation</strong>’s structural insulated panel system continues to<br />
deliver a high level of fabric performance on all projects.