07.01.2016 Views

Housing home user guide

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THINGS YOU MUST DO:<br />

As soon as you move in YOU MUST contact the various suppliers so that water, gas,<br />

electric and telephone are connected in your name.<br />

These may be disconnected from your <strong>home</strong> if you do not apply to have them put<br />

into your name.<br />

For your <strong>home</strong> the contacts are:<br />

Meter Reference<br />

Numbers<br />

Gas Electricity Water<br />

………………….. ……………..<br />

…………….<br />

Meter Number<br />

………………<br />

…………………<br />

…………….<br />

Supplier<br />

British Gas<br />

British Gas<br />

Bournemouth<br />

Water<br />

Supplier contact<br />

telephone 0800 048 0202<br />

0800 048 0202 01202 590059<br />

Meter reading on<br />

day of moving in<br />

Emergency<br />

contact number 0800 111 999<br />

SSE Distribution<br />

08457 708 090<br />

Leakline<br />

08005 878979<br />

a. Water<br />

Your water supply will be metered. To arrange a permanent water supply to your<br />

<strong>home</strong> you will need to apply to the water company shown in the table above. They<br />

will arrange for the existing temporary supply connected for the builder to be<br />

replaced with a permanent supply for yourselves.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!