National Gypsum Construction Guide - 12th Edition
National Gypsum Construction Guide - 12th Edition National Gypsum Construction Guide - 12th Edition
LANDING 134 CAVITY SHAFTWALL SYSTEMS A A 1/2" FIRE-SHIELD C GYPSUM BOARD STAIR HANGER ROD 09260X Scale: 3" = 1'-0" 1/2" FIRE-SHIELD C GYPSUM BOARD 2 1/2" STUD TRACK 20 GA. HANGER ROD 1" FIRE-SHIELD SHAFTLINER SHAFTWALL STUD 1/2" FIRE-SHIELD C GYPSUM BOARD 2 1/2" STEEL STUDS, 16" O.C. CHASE WALL 09260EE Scale: 3" = 1'-0" 2 1/2" x 20 GA. STUD TRACK BRACES EVERY 2ND STUD AT 1/3 POINTS OF STUD HEIGHT AT 4' O.C. MAX. CERAMIC TILE MR GYPSUM BOARD 1 5/8" TYPE S OR S-12 SCREWS SHAFTWALL STUD, 24" O.C. PAN HEAD SCREWS SHAFTWALL CHASE WALL (SECTION A-A) 09260FF Scale: 3" = 1'-0" HANGER ROD SHAFTWALL STUD STAIRWELL STAIR HANGER ROD 09260Y Scale: 3" = 1'-0" 1" FIRE-SHIELD SHAFTLINER SHAFTWALL STUD 1/2" FIRE-SHIELD C GYPSUM BOARD 1" FIRE-SHIELD SHAFTLINER
Note: Maintain 24" module Shaftwall Stud spacing regardless of duct location. Shaftwall Stud h A. b B TYPICAL DUCT OPENING RECOMMENDED FRAMING Fasten J Track in this manner Duct Shaftwall Studs 24" 24" 24" 24" A Cut here and bend down B. J Track Headers with ends slotted to fit into shaftwall studs. J Track Length b+h+b and legs cut at those lengths and folded as shown to slip into void. Attach to J Track header with pan head screws. J Track 09 21 16.23/NGC CAVITY SHAFTWALL SYSTEMS 135 09 21 16.23
- Page 85 and 86: Exposure to excessive or continuous
- Page 87 and 88: RECOMMENDATIONS Installation of Sou
- Page 89 and 90: PACKAGING 2' x 2' - 4 pcs./bundle,
- Page 91 and 92: Gold Bond ® BRAND Foil Back Gypsum
- Page 93 and 94: Table 1 25 GAUGE STUDS/PARTITION LI
- Page 95 and 96: Drywall Metal Framing* 25 & 20 GAUG
- Page 97 and 98: DETAILS STUD SPLICE 16" LENGTH OF T
- Page 99 and 100: RECOMMENDATIONS 1. FRAMING Align fl
- Page 101 and 102: Steel Frame Ceilings/Furring Channe
- Page 103 and 104: Wood Frame Walls and Ceilings/Singl
- Page 105 and 106: TECHNICAL DATA 09 29 00/NGC FASTENE
- Page 107 and 108: 2. Laminating is an excellent way t
- Page 109 and 110: INSTALLATION SPLICE ON JOIST 1 1/4"
- Page 111 and 112: RECOMMENDATIONS Z FURRING 1. Begin
- Page 113 and 114: STEEL JAMB 1" FIRE-SHIELD SHAFTLINE
- Page 115 and 116: ProForm BRAND Taping Joint Compound
- Page 117 and 118: ProForm ® BRAND Texture Products D
- Page 119 and 120: RECOMMENDATIONS A. For specific rec
- Page 121 and 122: LEVEL 5 All joints and interior ang
- Page 123 and 124: D.Fire-Resistant Mold-Resistant Gyp
- Page 125 and 126: 12 TH EDITION Cavity Shaftwa l Syst
- Page 127 and 128: VIEW A-A U498 2 HOUR STAIRWELL CONS
- Page 129 and 130: CORNERBEAD J TRACK DETAILS PAN HEAD
- Page 131 and 132: 20 GA. 3" LEG J TRACK SHAFTWALL J T
- Page 133 and 134: CANTS SCREWED TO SHAFTWALL STUDS 75
- Page 135: TOGGLE BOLT SHAFTWALL STUD 6" x 23
- Page 139 and 140: Horizontal Shaftwall Duct and Ceili
- Page 141 and 142: 12 TH EDITION H-Stud Area Separatio
- Page 143 and 144: AREA SEPARATION WALL LIMITING HEIGH
- Page 145 and 146: 1" FIRE-SHIELD SHAFTLINER 3/4" AIR
- Page 147 and 148: 12 TH EDITION PermaBase ® BRAND Ce
- Page 149 and 150: WARRANTY � 30-year limited warran
- Page 151 and 152: FLOOR UNDERLAYMENT COUNTERTOP JOINT
- Page 153 and 154: WATER-MANAGED, HIGH-IMPACT RESISTAN
- Page 155 and 156: PERMABASE ® BRAND CEMENT BOARD TEC
- Page 157 and 158: INSTALLATION INTERIOR APPLICATIONS
- Page 159 and 160: 12 TH EDITION Index A Accessories .
- Page 161 and 162: L Laminated partitions ............
- Page 163 and 164: INDEX OF CAD DETAIL DRAWINGS DETAIL
- Page 165 and 166: 1-800 NATIONAL ® HAS THE ANSWERS T
Note: Maintain 24" module Shaftwall Stud spacing regardless of duct location.<br />
Shaftwall<br />
Stud<br />
h<br />
A.<br />
b<br />
B<br />
TYPICAL DUCT OPENING<br />
RECOMMENDED FRAMING<br />
Fasten<br />
J Track<br />
in this<br />
manner<br />
Duct<br />
Shaftwall<br />
Studs<br />
24" 24" 24" 24"<br />
A<br />
Cut here and<br />
bend down<br />
B.<br />
J Track Headers<br />
with ends<br />
slotted to fit into<br />
shaftwall studs.<br />
J Track Length<br />
b+h+b and legs<br />
cut at those<br />
lengths and<br />
folded as shown<br />
to slip into void.<br />
Attach to J Track<br />
header with pan<br />
head screws.<br />
J Track<br />
09 21 16.23/NGC<br />
CAVITY SHAFTWALL SYSTEMS<br />
135<br />
09 21 16.23