<strong>Watershed</strong> Minnesota River <strong>Achievements</strong> Basin <strong>Report</strong> 2008<br />
<strong>Watershed</strong> <strong>Achievements</strong> <strong>Report</strong> Statewide 2015<br />
Project involving multiple watersheds<br />
Greater Blue Earth and Des Moines<br />
River SSTS loans<br />
This project was implemented to aid in replacing failing<br />
sewage treatment systems in Watonwan, Blue Earth,<br />
Cottonwood and Jackson Counties; thereby reducing<br />
surface and groundwater contaminants such as fecal<br />
coliform in the Watonwan, Le Sueur, Cottonwood<br />
and Des Moines River watersheds. A total loan fund<br />
of $1,2000,000.00 was dedicated to this project at an<br />
amount of $300,000.00 per county. Blue Earth County<br />
(BEC) was able to bring 52 systems into compliance<br />
using a total of $531,210.63 of their available funds.<br />
Watonwan County was able to bring 32 systems into<br />
compliance using a total of $298,839.61 of their available<br />
funds. Cottonwood County was able to bring 16 systems<br />
into compliance using $192,455.35 of their available<br />
funds. Of the total of $1,200,000.00 in available funds,<br />
$1,022,505.59 was utilized. Additional funds may have<br />
been used in early 2014 but spring weather delayed the<br />
start of the 2014 septic installation season.<br />
Goals<br />
• Bring failing septic systems in Watonwan County into<br />
compliance<br />
• Bring failing septic systems in BEC into compliance<br />
• Bring failing septic systems in Cottonwood County into<br />
compliance<br />
Results that count<br />
• 32 systems in Watonwan County brought into<br />
compliance<br />
• 52 systems in BEC brought into compliance<br />
• 16 systems in Cottonwood County brought into<br />
compliance<br />
Financial information<br />
Funding type: CWP<br />
Grant amount: $0<br />
Final in-kind: $126,080<br />
Final Loan: $1,022,506<br />
Contact information<br />
David Haler, Land Management Director<br />
Watonwan County<br />
108, 8th Street Sout<br />
Suite 2<br />
Saint James , MN 56081<br />
507-375-1225<br />
David.Haler@co.watonwan.mn.us<br />
MPCA Project Manager: Paul Davis<br />
New septic system trench being prepared in Watonwan County<br />
Minnesota Pollution Control Agency www.pca.state.mn.us 79