15.12.2015 Views

TUBING & PIPE

TUBING & PIPE - Alro Steel Corporation

TUBING & PIPE - Alro Steel Corporation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EPOXZKOTE ®<br />

<strong>TUBING</strong><br />

AVAILABLE COLORS<br />

• Red<br />

• Gray<br />

• Black<br />

• Clear<br />

Product Description<br />

Steel tubing produced to A513 and A500 B/C specifications that is phosphate<br />

pretreated and coated with a fully cured weldable epoxy powder coat primer.<br />

Performance Values<br />

• Salt Spray - ASTM B117 1,000 hours @ 1 mil with zero creepage @ scribe<br />

• Adhesion - ASTM D3359-90 5B<br />

• Impact - 100 inch lbs without any de-lamination of coating<br />

• Flexible - Forming and bending without cracking or flaking<br />

• DFT - 0.5 mil average dry film thickness<br />

Improve Efficiency and Productivity with<br />

EPOXZKOTE ®<br />

Powder Primed Tubing<br />

It's clean, primed, ready to weld, ready to fabricate.<br />

Benefits:<br />

• Weld spatter does not stick<br />

• EPOXZKOTE resists grease and oil<br />

• Eliminate embedded oils<br />

• Reduce use of chemical cleaners<br />

• No rust to remove<br />

7-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!