16.11.2015 Views

Shershada_Architecture Portfolio

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PORTFOLIO<br />

ARCHITECTURE<br />

SHERSHADA ABDUL RAUF<br />

LinkedIn: https://www.linkedin.com/pub/shershada-rauf/93/62b/103<br />

E-mail : congenial729@gmail.com<br />

Mobile : 00971528180364<br />

1


CONTENTS<br />

ACADEMIC WORKS<br />

100 Bedded General Hospital<br />

Live Project: Redevelopment of Mixed Use Tower<br />

Play School Design<br />

MIT Campus Walkway Redesign<br />

06<br />

12<br />

19<br />

22<br />

PROFESSIONAL WORKS<br />

In India, at Mendonca Associates:<br />

Upgradation of Playground Facilities- Landscape Design Project - St. Gerosa, Mangalore<br />

26<br />

Redevelopment of Father Muller Road<br />

In Dubai, at Arkitekik Int’l Consulting Engineers and WS Atkins & Partners Overseas:<br />

34<br />

YOTEL- Design of Mixed Use Tower @ Business Bay, Dubai<br />

40<br />

Al Sandos Mansion- Furniture Layouts and Presentation drawings<br />

52<br />

Belhab Towers- Resign of options for typical floors<br />

53<br />

2<br />

I graduated from Faculty of <strong>Architecture</strong>, Manipal University, India as an architect in 2015. Indian by birth,<br />

and global by nature, I spent my formative years in Dubai. The beginning of my passion toward architecture<br />

started thus. I am particularly interested in how aesthetic forms can be blended well with a functional<br />

structure. With a great passion for design, and insatiable curiosity to learn more, I look forward to being<br />

a good team member as well as a leader in creating sustainable, sensitive and responsive designs.<br />

I hold a UAE residency visa, sponsored by my father, and am looking for career opportunities wherein I can<br />

give the best of my creative skills in design while at the same time gain valuable experience and knowledge.<br />

Al Jaddaf Water Transportation Station- Elevation Redesign<br />

Downtown Opera House- Structural Detailing of Water Feature<br />

DAMAC AKOYA- Redesign and Technical Drawings<br />

OTHER INTERESTS<br />

3<br />

53<br />

54<br />

56<br />

58


ACADEMIC<br />

WORKS<br />

4<br />

Featured are some selected works designed as part of the academic curriculum.<br />

Our major architectural projects as part of the design school involved design of:<br />

1. Architect’s house and office<br />

2. Shopping Mall<br />

3. Cultural Centre<br />

4. Play School Design along with Children’s park<br />

5. Redevelopment of High-Rise Mixed Use Building<br />

6. Walkway Design<br />

7. 100-bedded Hospital<br />

8. Sustainable retrofitting of MIT Campus (Thesis)<br />

5


`<br />

SEROTOLOGY<br />

6 m²<br />

HEMATOLOGY<br />

6 m²<br />

DOC<br />

SEROTOLOGY<br />

6 m²<br />

6 m²<br />

DOC HEMATOLOGY<br />

6 m² 6 m²<br />

DOC<br />

6 m²<br />

BILLING & REG.<br />

DOC<br />

6 m²<br />

BILLING & REG.<br />

6 m²<br />

MICROBIO.<br />

6 m²<br />

BIOCHEM.<br />

PHLEBO.<br />

4 m²<br />

MICROBIO.<br />

6 m²<br />

BIOCHEM.<br />

PHLEBO. 6 m²<br />

4 m²<br />

PHLEBO.<br />

4 m²<br />

PHLEBO.<br />

4 m²<br />

A<br />

A<br />

A<br />

A<br />

WORK<br />

5 m²<br />

WORK<br />

5 m²<br />

COLD<br />

3 m²<br />

COLD<br />

3 m²<br />

CHANGE<br />

4 m²<br />

STORE<br />

4 m²<br />

REPROCESSING<br />

CHANGE 4 m²<br />

4 m²<br />

CHEMICAL<br />

PREP.<br />

STORE<br />

64 m² m²<br />

4 m²<br />

REPROCESSING<br />

CHEMICAL<br />

PREP.<br />

6 m²<br />

ORTHO<br />

11 m²<br />

CARDIO ORTHO<br />

911 m² m²<br />

CARDIO<br />

9 m²<br />

ORTHO<br />

11 m²<br />

CARDIO<br />

9 m²<br />

ORTHO<br />

11 m²<br />

CARDIO<br />

9 m²<br />

GENERAL<br />

7 m²<br />

GENERAL<br />

7 m²<br />

GENERAL<br />

7 m²<br />

GENERAL<br />

7 m²<br />

GENERAL<br />

8 m²<br />

GENERAL<br />

8 m²<br />

PHYSIOTHERAPY<br />

ROOM<br />

89 m²<br />

BILLING & REG.<br />

GENERAL<br />

8 m²<br />

PHYSIOTHERAPY<br />

ROOM<br />

89 m²<br />

BILLING & REG.<br />

GENERAL<br />

8 m²<br />

UP<br />

UP<br />

DN<br />

DN<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

B<br />

B<br />

B<br />

B<br />

B<br />

B<br />

B<br />

B<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

38 m²<br />

EXERCISE ROOM<br />

WAX<br />

THERAPY<br />

EXERCISE<br />

5 m²<br />

ROOM<br />

38 m²<br />

WAX<br />

THERAPY<br />

5 m²<br />

PAEDIATRIC PAEDIATRIC<br />

9 m²<br />

8 m²<br />

GYNACOLOGY<br />

LVL<br />

12<br />

+0.00<br />

m²<br />

m<br />

PAEDIATRIC<br />

9 m²<br />

RECORDS<br />

5 m²<br />

ELECTRICAL<br />

3 m²<br />

AHU<br />

3 m²<br />

RECORDS<br />

5 m²<br />

LIFT<br />

ELECTRICAL<br />

LIFT<br />

3 m²<br />

AHU<br />

3 m²<br />

LIFT<br />

LIFT<br />

9 m²<br />

PAEDIATRIC<br />

9 m²<br />

PAEDIATRIC<br />

ELECTRICAL<br />

3 m²<br />

AHU<br />

3 m²<br />

LIFT<br />

ELECTRICAL<br />

LIFT<br />

3 m²<br />

AHU<br />

3 m²<br />

LIFT<br />

LIFT<br />

WHEELCHAIR<br />

BAY<br />

WHEELCHAIR<br />

BAY<br />

8 m²<br />

PAEDIATRIC<br />

ELECTRO-THERAPY<br />

ROOM<br />

51 m²<br />

ELECTRO-THERAPY<br />

ROOM<br />

51 m²<br />

LOCKERS, CHANGING,<br />

SHOWER AREA<br />

14 m²<br />

CONSULTATION<br />

LOCKERS, CHANGING,<br />

SHOWER AREA<br />

PAEDIATRIC<br />

PAEDIATRIC<br />

14 m²<br />

CONSULTATION<br />

LVL +0.00 m<br />

GYNACOLOGY<br />

9 m²<br />

GYNACOLOGY<br />

12 m²<br />

GYNACOLOGY<br />

9 m²<br />

LVL +0.00 m<br />

LVL +0.00 m<br />

GYNACOLOGY<br />

12 m²<br />

GYNACOLOGY<br />

9 m²<br />

GYNACOLOGY<br />

12 m²<br />

GYNACOLOGY<br />

9 m²<br />

23 m²<br />

NURSES ROOM<br />

LVL +0.45 m<br />

LVL +0.45 m<br />

23 m²<br />

NURSES ROOM<br />

LVL +0.45 m<br />

LVL +0.45 m<br />

56 m²<br />

PAEDIATRIC WARD<br />

56 m²<br />

PAEDIATRIC WARD<br />

54 m²<br />

MATERNITY WARD<br />

54 m²<br />

MATERNITY WARD<br />

RECORDS<br />

5 m²<br />

RECORDS<br />

5 m²<br />

ELECTRIC<br />

ELECTRIC LIFT<br />

LIFT<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

DN<br />

AHU<br />

DU<br />

UP<br />

4 m² 3 m²<br />

DN<br />

UP<br />

UP<br />

LVL +0.6 m<br />

LIFT<br />

UP<br />

LVL +0.6 m<br />

LIFT<br />

UP<br />

UP<br />

UP<br />

UP<br />

SERVICE<br />

LIFT<br />

AHU<br />

4 m²<br />

STRET.<br />

LIFT<br />

SERVICE<br />

LIFT<br />

STRET.<br />

LIFT<br />

AHU<br />

4 m²<br />

SERVICE<br />

LIFT<br />

AHU<br />

4 m²<br />

LIFT<br />

SERVICE<br />

LIFT<br />

LIFT<br />

SERVICE CORRIDOR<br />

DU<br />

3 m²<br />

LOUNGE<br />

LVL +0.45 m<br />

LVL +0.00 m<br />

STORE<br />

11 m²<br />

CU<br />

4 m² JANITOR'S RESTING<br />

SPACE<br />

CU<br />

4 m²<br />

SERVICE CORRIDOR<br />

LOUNGE<br />

LVL +0.45 m<br />

LVL +0.00 m<br />

STORE<br />

11 m²<br />

DU<br />

8 m²<br />

DU<br />

8 m²<br />

11 m²<br />

EQ U PI .RO O M<br />

EQ U PI .RO O M<br />

JANITOR'S RESTING<br />

SPACE<br />

MEDICAL<br />

RECORDS ROOM<br />

22 m²<br />

MEDICAL<br />

RECORDS ROOM<br />

MEDICAL 22 m² STORE<br />

19 m²<br />

11 m²<br />

19 m²<br />

MEDICAL STORE<br />

CU<br />

6 5. m ²<br />

DO C S'<br />

11 m²<br />

NURSES RO M<br />

10 m²<br />

CU<br />

ROOM<br />

12 m²<br />

PRO CEDURE<br />

6 5. m ²<br />

10 m²<br />

PRO CEDURE<br />

DO C S'<br />

11 m²<br />

ROOM<br />

12 m²<br />

NURSES RO M<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

NUR,/DOC TOI.<br />

NUR,/DOC TOI.<br />

GENERAL WARD<br />

(FEMALE)<br />

51 m²<br />

GENERAL WARD<br />

(FEMALE)<br />

51 m²<br />

GENERAL WARD<br />

(MALE)<br />

67 m²<br />

GENERAL WARD<br />

(MALE)<br />

67 m²<br />

4 m²<br />

GM'S CABIN<br />

4 m²<br />

GM'S CABIN<br />

TOILETS (F)<br />

TOILETS (M)<br />

TOILETS (F)<br />

TOILETS (M)<br />

22 m²<br />

FRONT OFFICE<br />

22 m²<br />

FRONT OFFICE<br />

4 m²<br />

CMO'S CABIN<br />

4 m²<br />

CMO'S CABIN<br />

LVL +0.90 m<br />

LVL +0.45 m<br />

LVL +0.90 m<br />

LVL +0.45 m<br />

6 m²<br />

HR'S ROOM<br />

6 m²<br />

HR'S ROOM<br />

ACCOUNTS<br />

18 m²<br />

ACCOUNTS<br />

18 m²<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

LVL +0.90 m<br />

LVL +0.90 m<br />

9 m²<br />

DRY STORAGE<br />

8 m²<br />

VEG & FRUITS<br />

CUTLERY &<br />

NON-FOOD<br />

8 m²<br />

GRINDING &<br />

DOUGH<br />

6 m²<br />

CUTLERY &<br />

NON-FOOD<br />

8 m²<br />

POT-WASH<br />

9 m²<br />

UP<br />

PATIENT LIFT<br />

DOC'S LIFT<br />

D/U<br />

C/U<br />

AHU<br />

4 m² 4 m²<br />

4 m²<br />

PATIENT LIFT<br />

CORRIDOR<br />

9 m²<br />

DOC'S LIFT<br />

RES. D/U DOC C/U<br />

AHU<br />

9 4 m² m² 4 m²<br />

4 m²<br />

CORRIDOR<br />

9 m²<br />

SCRUB<br />

5 m²<br />

MINOR OT<br />

RES. DOC<br />

STORE 27 m²<br />

9 m²<br />

8 m²<br />

SCRUB<br />

5 m²<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

PATIENT LIFT<br />

DOC'S LIFT<br />

D/U<br />

7 m²<br />

EQUIPMENT<br />

STORE<br />

9 m²<br />

OT<br />

46 m²<br />

POST OP<br />

38 m²<br />

UP<br />

MINOR OT<br />

STORE 27 m²<br />

8 m²<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

PATIENT LIFT<br />

DOC'S LIFT<br />

D/U<br />

7 m²<br />

EQUIPMENT<br />

STORE<br />

9 m²<br />

9 m²<br />

DRY STORAGE<br />

8 m²<br />

VEG & FRUITS<br />

GRINDING &<br />

DOUGH<br />

6 m²<br />

POT-WASH<br />

9 m²<br />

OT<br />

46 m²<br />

POST OP<br />

38 m²<br />

7 m²<br />

STERILE STORE<br />

Room<br />

9 m²<br />

16 m²<br />

PRE-PREPARATION<br />

7 m²<br />

STERILE STORE<br />

Room<br />

9 m²<br />

16 m²<br />

PRE-PREPARATION<br />

63 m²<br />

PREPARATION<br />

63 m²<br />

PREPARATION<br />

UP<br />

UP<br />

CU<br />

9 m²<br />

CU<br />

9 m²<br />

C<br />

BULK STORAGE<br />

7 m²<br />

C<br />

4 m²<br />

COLD STORE<br />

7 m²<br />

BULK STORAGE<br />

4 m²<br />

COLD STORE<br />

OBSERVATION ROOM<br />

21 m²<br />

OBSERVATION ROOM<br />

21 m²<br />

C<br />

C<br />

SCRUB<br />

7 m²<br />

C<br />

ANTE ROOM<br />

6 m²<br />

SCRUB<br />

7 m²<br />

C<br />

51 m²<br />

STERILE SPACE<br />

ANTE ROOM<br />

6 m²<br />

51 m²<br />

STERILE SPACE<br />

C<br />

C<br />

TRIAGE<br />

37 m²<br />

TRIAGE<br />

37 m²<br />

8 m²<br />

HEAD-CHEF<br />

8 m²<br />

HEAD-CHEF<br />

PACKING<br />

15 m²<br />

PACKING<br />

15 m²<br />

ADMIN&<br />

ORDER-TAKING<br />

11 m²<br />

7 m²<br />

DIETICIAN<br />

SERVING COUNTER<br />

ANTE- ISOLATION ROOM<br />

ROOM<br />

8 m²<br />

DU<br />

6 m²<br />

ADMIN&<br />

ORDER-TAKING<br />

11 m²<br />

7 m²<br />

DIETICIAN<br />

SERVING COUNTER<br />

ANTE-<br />

ROOM<br />

DU<br />

6 m²<br />

8 m²<br />

ISOLATION ROOM<br />

MORGUE<br />

0T<br />

47 m² STERILE STORE<br />

6 m²<br />

0T<br />

47 m²<br />

PRE-OP<br />

29 m²<br />

PRE-OP<br />

29 m²<br />

MORGUE<br />

6 m²<br />

STERILE STORE<br />

CLEANING<br />

AREA<br />

CLEANING<br />

AREA<br />

EMERG.<br />

LIFT<br />

X-RAY ROOM<br />

18 m²<br />

EMERG.<br />

LIFT<br />

X-RAY ROOM<br />

18 m²<br />

LOBBY<br />

13 m²<br />

LOBBY<br />

13 m²<br />

C/U<br />

5 m²<br />

D/U<br />

6 m²<br />

LIFT<br />

C/U<br />

5 m²<br />

D/U<br />

6 m²<br />

CU<br />

7 m²<br />

DU<br />

8 m²<br />

LIFT<br />

CU<br />

7 m²<br />

DU<br />

8 m²<br />

AHU<br />

4 m²<br />

Room<br />

5 m²<br />

AHU<br />

4 m²<br />

Room<br />

5 m²<br />

CU<br />

CORRIDOR<br />

36 m²<br />

IMAGE<br />

PROCESSING<br />

12 m²<br />

DU<br />

CU<br />

DU<br />

LAB<br />

25 m²<br />

CORRIDOR<br />

36 m²<br />

IMAGE<br />

PROCESSING<br />

12 m²<br />

CU<br />

CU<br />

DOCS ROOM<br />

8 m²<br />

10 m²<br />

NURSES ROOM<br />

DOCS ROOM<br />

8 m²<br />

EQUIPMENT<br />

ROOM<br />

10 m²<br />

10 m²<br />

NURSES ROOM<br />

EQUIPMENT<br />

ROOM<br />

10 m²<br />

LAB<br />

BLEEDING<br />

25 m²<br />

ROOM<br />

24 m²<br />

BLEEDING ROOM<br />

24 m²<br />

RECEPTION<br />

12 m²<br />

INSTRUMENT<br />

SORTING<br />

RECEPTION 24 m²<br />

12 m²<br />

INSTRUMENT<br />

STERILE STORE<br />

SORTING<br />

16 m²<br />

24 m²<br />

16 m²<br />

STERILE STORE<br />

16 m²<br />

TREADMILL TESTING<br />

9 m²<br />

MEDICAL RECORDS<br />

16 m²<br />

TREADMILL TESTING<br />

9 m²<br />

MEDICAL RECORDS<br />

LABOR ROOM<br />

18 m²<br />

LABOR ROOM<br />

18 m²<br />

WAITING AREA<br />

MRI<br />

41 m²<br />

12 m²<br />

ULTRA SOUND<br />

DU<br />

MRI<br />

41 m²<br />

SERVICE<br />

AREA<br />

12 m²<br />

ULTRA SOUND<br />

DU<br />

SERVICE<br />

AREA<br />

UP<br />

TECH<br />

8 UPm²<br />

STORAGE<br />

10 m²<br />

STORAGE<br />

DOC'S<br />

10 m²<br />

PANTRY<br />

ROOM<br />

TECH<br />

7 m²<br />

7 m²<br />

8 m²<br />

ECG<br />

ECHO ECG<br />

9 m²<br />

7 m²<br />

WAITING AREA<br />

Room<br />

4 m²<br />

Room<br />

4 m²<br />

ECG<br />

9 m²<br />

DOC'S<br />

ROOM<br />

7 m²<br />

EEG<br />

20 m²<br />

MAMMOGRAPHY<br />

12 m²<br />

EMERGENCY PARKING<br />

(2 VANS)<br />

16 m²<br />

NICU- PRENATAL<br />

NICU- PRENATAL<br />

16 m² CCU<br />

41 m²<br />

Room<br />

4 m²<br />

Room<br />

4 m²<br />

ISO.ROOMCCU<br />

8 m² 41 m²<br />

ISO ROOM<br />

8 m²<br />

ISO ROOM<br />

8 m²<br />

ICU<br />

41 m²<br />

STAFF CHANGE<br />

20 ICU m²<br />

41 m²<br />

39 m²<br />

STERILIZING<br />

SERVICE<br />

LIFT<br />

ECHO<br />

TECH<br />

ECG<br />

ROOM<br />

7 m²<br />

7 m²<br />

EEG<br />

20 m²<br />

40 m²<br />

DECONTAMINATION<br />

CT SCAN<br />

26 m²<br />

CHANGING CT SCAN<br />

26 m²<br />

MAMMOGRAPHY<br />

12 m²<br />

EMERGENCY PARKING<br />

(2 VANS)<br />

ISO.ROOM<br />

8 m²<br />

20 m²<br />

STAFF CHANGE<br />

39 m²<br />

STERILIZING<br />

SERVICE<br />

LIFT<br />

PANTRY<br />

7 m²<br />

TECH ROOM<br />

7 m²<br />

40 m²<br />

DECONTAMINATION<br />

CHANGING<br />

SERVICE<br />

LIFT<br />

NICU-SICK SERVICE<br />

LIFT<br />

14 m²<br />

14 m²<br />

NICU-SICK<br />

STORE<br />

4 m²<br />

STORE<br />

4 m²<br />

STORE<br />

4 m²<br />

STORE<br />

4 m²<br />

A<br />

A<br />

A<br />

A<br />

100-BEDDED<br />

HOSPITAL<br />

The project brief was to design a 100 bedded general<br />

hospital in a small Indian town called Brahmavar.<br />

Acknowledging emotional well-being of patients as<br />

catalysts to positive therapeutic outcomes, the hospital<br />

was designed keeping in mind that healing enviroments<br />

are good medicines. The concept resulted in well-lit,<br />

spacious spaces with good accessibilty to greenery.<br />

fUNCTIONALITY<br />

+ + =<br />

ACCESS TO HEALING<br />

SPACES<br />

REDUCED TRAVEL<br />

DISTANCE<br />

FINAL STRUCTURE<br />

SERVING COUNTER<br />

SERVING COUNTER<br />

service<br />

entry<br />

GROUND FLOOR<br />

IN-PATIENT DEPARTMENT(+2 FLOORS ACC TO FIRST<br />

FLOOR LAYOUT)<br />

OUT PATIENT DEPARTMENT<br />

Dialysis/labs/physiotherapy<br />

floor1:<br />

floor2:<br />

FIRST FLOOR<br />

emergency/radiology/diagnostics/blood transfusion/morgue<br />

ot/icu/nicu/labor room<br />

SITE PLAN<br />

secondary road<br />

kitchen and dining<br />

6<br />

kEY PLANSHOWING PLACEMENT OF DEPARTMENTS<br />

main road<br />

vehicular<br />

entry<br />

pedestrian<br />

entry<br />

emergency<br />

entry<br />

7


6 m²<br />

SEROTOLOGY<br />

6 m²<br />

HEMATOLOGY<br />

DOC<br />

6 m²<br />

DOC<br />

6 m²<br />

BILLING & REG.<br />

6 m²<br />

MICROBIO.<br />

6 m²<br />

BIOCHEM.<br />

4 m²<br />

PHLEBO.<br />

4 m²<br />

PHLEBO.<br />

A<br />

A<br />

WORK<br />

5 m²<br />

COLD<br />

3 m²<br />

CHANGE<br />

4 m²<br />

STORE<br />

4 m²<br />

4 m²<br />

REPROCESSING<br />

CHEMICAL<br />

PREP.<br />

6 m²<br />

ORTHO<br />

11 m²<br />

CARDIO<br />

9 m²<br />

ORTHO<br />

11 m²<br />

CARDIO<br />

9 m²<br />

GENERAL<br />

7 m²<br />

GENERAL<br />

7 m²<br />

GENERAL<br />

8 m²<br />

PHYSIOTHERAPY<br />

ROOM<br />

89 m²<br />

BILLING & REG.<br />

GENERAL<br />

8 m²<br />

UP<br />

DN<br />

LVL +0.15 m<br />

B<br />

B<br />

B<br />

B<br />

LVL +0.15 m<br />

38 m²<br />

EXERCISE ROOM<br />

WAX<br />

THERAPY<br />

5 m²<br />

9 m²<br />

PAEDIATRIC<br />

RECORDS<br />

5 m²<br />

3 m²<br />

ELECTRICAL<br />

AHU<br />

3 m²<br />

LIFT<br />

LIFT<br />

PAEDIATRIC<br />

9 m²<br />

3 m²<br />

ELECTRICAL<br />

AHU<br />

3 m²<br />

LIFT<br />

LIFT<br />

WHEELCHAIR<br />

BAY<br />

8 m²<br />

PAEDIATRIC<br />

ELECTRO-THERAPY<br />

ROOM<br />

51 m²<br />

LOCKERS, CHANGING,<br />

SHOWER AREA<br />

PAEDIATRIC<br />

14 m²<br />

CONSULTATION<br />

LVL +0.00 m<br />

12 m²<br />

GYNACOLOGY<br />

9 m²<br />

GYNACOLOGY<br />

LVL +0.00 m<br />

GYNACOLOGY<br />

12 m²<br />

GYNACOLOGY<br />

9 m²<br />

23 m²<br />

NURSES ROOM<br />

LVL +0.45 m<br />

LVL +0.45 m<br />

56 m²<br />

PAEDIATRIC WARD<br />

54 m²<br />

MATERNITY WARD<br />

5 m²<br />

RECORDS<br />

ELECTRIC<br />

LIFT<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

LIFT<br />

LIFT<br />

UP<br />

UP<br />

DN<br />

LVL +0.6 m<br />

LIFT<br />

UP<br />

UP<br />

AHU<br />

4 m²<br />

SERVICE<br />

LIFT<br />

STRET.<br />

LIFT<br />

AHU<br />

4 m²<br />

SERVICE<br />

LIFT<br />

LIFT<br />

DU<br />

3 m²<br />

CU<br />

4 m²<br />

SERVICE CORRIDOR<br />

LOUNGE<br />

LVL +0.45 m<br />

LVL +0.00 m<br />

STORE<br />

11 m²<br />

DU<br />

8 m²<br />

EQ U PI .RO O M<br />

JANITOR'S RESTING<br />

SPACE<br />

11 m²<br />

MEDICAL<br />

RECORDS ROOM<br />

22 m²<br />

19 m²<br />

MEDICAL STORE<br />

CU<br />

6 5. m ²<br />

DO C S'<br />

11 m²<br />

NURSES RO O M<br />

10 m²<br />

PRO CEDURE<br />

ROOM<br />

12 m²<br />

LVL +0.15 m<br />

LVL +0.15 m<br />

NUR,/DOC TOI.<br />

GENERAL WARD<br />

(FEMALE)<br />

GENERAL WARD<br />

(MALE)<br />

67 m²<br />

51 m²<br />

4 m²<br />

GM'S CABIN<br />

TOILETS (F)<br />

TOILETS (M)<br />

22 m²<br />

FRONT OFFICE<br />

4 m²<br />

CMO'S CABIN<br />

LVL +0.90 m<br />

LVL +0.45 m<br />

6 m²<br />

HR'S ROOM<br />

18 m²<br />

ACCOUNTS<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

LVL +0.90 m<br />

PATIENT LIFT<br />

DOC'S LIFT<br />

D/U<br />

4 m²<br />

9 m²<br />

RES. DOC<br />

SCRUB<br />

5 m²<br />

9 m²<br />

CORRIDOR<br />

9 m²<br />

DRY STORAGE<br />

8 m²<br />

VEG & FRUITS<br />

CUTLERY &<br />

NON-FOOD<br />

C/U<br />

4 m²<br />

8 m²<br />

GRINDING &<br />

DOUGH<br />

6 m²<br />

9 m²<br />

POT-WASH<br />

UP<br />

AHU<br />

4 m²<br />

MINOR OT<br />

8 m²<br />

STORE 27 m²<br />

VISITORS'<br />

LIFT<br />

VISITORS'<br />

LIFT<br />

PATIENT LIFT<br />

DOC'S LIFT<br />

D/U<br />

7 m²<br />

EQUIPMENT<br />

STORE<br />

9 m²<br />

OT<br />

46 m²<br />

POST OP<br />

38 m²<br />

7 m²<br />

STERILE STORE<br />

Room<br />

9 m²<br />

16 m²<br />

PRE-PREPARATION<br />

63 m²<br />

PREPARATION<br />

UP<br />

CU<br />

9 m²<br />

C<br />

7 m²<br />

BULK STORAGE<br />

4 m²<br />

COLD STORE<br />

OBSERVATION ROOM<br />

21 m²<br />

C<br />

SCRUB<br />

7 m²<br />

C<br />

6 m²<br />

ANTE ROOM<br />

51 m²<br />

STERILE SPACE<br />

C<br />

TRIAGE<br />

37 m²<br />

8 m²<br />

HEAD-CHEF<br />

PACKING<br />

15 m²<br />

ADMIN&<br />

ORDER-TAKING<br />

11 m²<br />

7 m²<br />

DIETICIAN<br />

SERVING COUNTER<br />

ANTE-<br />

ROOM<br />

DU<br />

6 m²<br />

8 m²<br />

ISOLATION ROOM<br />

0T<br />

47 m²<br />

PRE-OP<br />

29 m²<br />

MORGUE<br />

6 m²<br />

STERILE STORE<br />

EMERG.<br />

LIFT<br />

CLEANING<br />

AREA<br />

LOBBY<br />

13 m²<br />

C/U<br />

5 m²<br />

D/U<br />

6 m²<br />

LIFT<br />

CU<br />

7 m²<br />

DU<br />

8 m²<br />

18 m²<br />

X-RAY ROOM<br />

AHU<br />

4 m²<br />

Room<br />

5 m²<br />

CU<br />

CORRIDOR<br />

36 m²<br />

IMAGE<br />

PROCESSING<br />

12 m²<br />

CU<br />

8 m²<br />

DOCS ROOM<br />

10 m²<br />

NURSES ROOM<br />

EQUIPMENT<br />

ROOM<br />

10 m²<br />

LAB<br />

25 m²<br />

DU<br />

BLEEDING ROOM<br />

24 m²<br />

12 m²<br />

RECEPTION<br />

INSTRUMENT<br />

SORTING<br />

24 m²<br />

16 m²<br />

STERILE STORE<br />

16 m²<br />

TREADMILL TESTING<br />

9 m²<br />

MEDICAL RECORDS<br />

18 m²<br />

LABOR ROOM<br />

MRI<br />

41 m²<br />

12 m²<br />

ULTRA SOUND<br />

DU<br />

SERVICE<br />

AREA<br />

UP<br />

ECG<br />

9 m²<br />

TECH<br />

8 m²<br />

WAITING AREA<br />

Room<br />

4 m²<br />

Room<br />

4 m²<br />

DOC'S<br />

ROOM<br />

7 m²<br />

STORAGE<br />

10 m²<br />

ECHO ECG<br />

7 m²<br />

EEG<br />

20 m²<br />

12 m²<br />

MAMMOGRAPHY<br />

EMERGENCY PARKING<br />

(2 VANS)<br />

NICU- PRENATAL<br />

16 m²<br />

8 m²<br />

ISO.ROOM<br />

CCU<br />

41 m²<br />

8 m²<br />

ISO ROOM<br />

ICU<br />

41 m²<br />

20 m²<br />

STAFF CHANGE<br />

39 m²<br />

STERILIZING<br />

SERVICE<br />

LIFT<br />

PANTRY<br />

7 m²<br />

7 m²<br />

TECH ROOM<br />

40 m²<br />

DECONTAMINATION<br />

CT SCAN<br />

26 m²<br />

CHANGING<br />

SERVICE<br />

LIFT<br />

NICU-SICK<br />

14 m²<br />

STORE<br />

4 m²<br />

STORE<br />

4 m²<br />

A<br />

A<br />

ENTRANCE PLAZA<br />

SSL +0.45m<br />

LVL +0.00m<br />

REFERENCE LEVEL<br />

ENTRANCE PLAZA<br />

SSL +0.45m<br />

PLAZA ROOFING<br />

SSL +4.45m<br />

LVL TOP +0.00m OF WALL<br />

REFERENCE LVL +4.05m LEVEL<br />

ENTRANCE PLAZA<br />

SSL +0.45m<br />

LVL +0.00m<br />

REFERENCE LEVEL<br />

TOP OF PARAPET<br />

LVL +10.10m<br />

ROOF DECK<br />

SSL +9.20m<br />

TOP OF PARAPET<br />

LVL +10.10m<br />

ROOF DECK<br />

SSL +9.20m<br />

FIRST FLOOR<br />

SSL +5.05m<br />

TOP OF PARAPET<br />

LVL +10.10m<br />

FIRST FLOOR<br />

SSL +5.05m<br />

ROOF DECK<br />

SSL +9.20m<br />

GROUND FLOOR<br />

SSL +0.90m<br />

SSL +0.45m<br />

GROUND FLOOR<br />

SSL +0.90m<br />

FIRST FLOOR<br />

SSL +5.05m +0.45m<br />

GROUND FLOOR<br />

SSL +0.90m<br />

SSL +0.45m<br />

ENTRANCE<br />

PLAZA LEVEL<br />

ENTRANCE<br />

PLAZA LEVEL<br />

ENTRANCE<br />

PLAZA LEVEL<br />

SSL LVL ROOF +0.00m +4.30m<br />

DECK<br />

REFERENCE LEVEL<br />

CORRIDOR CU STERILE<br />

SPACE<br />

CORRIDOR CU STERILE<br />

SPACE<br />

TRIAGE CORRIDOR OBSERVATION<br />

CORRIDOR CU STERILE<br />

ANTE SCRUB T1 T2 ROOM T3 SHOWER LOBBY<br />

SPACE<br />

ROOM<br />

ANTE<br />

ROOM<br />

ANTE<br />

ROOM<br />

SCRUB T1 T2 T3 SHOWER LOBBY<br />

SCRUB T1 T2 T3 SHOWER LOBBY<br />

TRIAGE CORRIDOR OBSERVATION<br />

ROOM<br />

TRIAGE CORRIDOR OBSERVATION<br />

ROOM<br />

ENTRANCE<br />

LOBBY<br />

ENTRANCE<br />

LOBBY<br />

ENTRANCE<br />

LOBBY<br />

GREEN PLAZA/ENTRANCE FOYER<br />

GREEN PLAZA/ENTRANCE FOYER<br />

GREEN PLAZA/ENTRANCE FOYER<br />

PHYSIOTHERAPY<br />

ROOM<br />

PHYSIOTHERAPY<br />

ROOM<br />

PHYSIOTHERAPY<br />

ROOM<br />

VISITORS'<br />

SEATING<br />

WAITING FOYER<br />

TOILET CORRIDOR ENTRANCE LOBBY<br />

CAFETERIA<br />

SEATING<br />

VISITORS'<br />

SEATING<br />

WAITING FOYER<br />

TOILET CORRIDOR ENTRANCE LOBBY<br />

CAFETERIA<br />

SEATING<br />

VISITORS'<br />

SEATING<br />

TOILET CORRIDOR ENTRANCE LOBBY<br />

CAFETERIA<br />

SEATING<br />

WAITING FOYER<br />

PREPARATION<br />

PREPARATION<br />

PREPARATION<br />

COLD<br />

STORE<br />

COLD<br />

STORE<br />

COLD<br />

STORE<br />

BULK<br />

STORE<br />

BULK<br />

STORE<br />

BULK<br />

STORE<br />

LOBBY<br />

LOBBY<br />

LOBBY<br />

TOP OF PARAPET<br />

LVL +5.95m<br />

ROOF DECK<br />

SSL +5.05m<br />

TOP OF PARAPET<br />

LVL +5.95m<br />

ROOF DECK<br />

SSL +5.05m<br />

GROUND FLOOR<br />

SSL +0.90m<br />

TOP OF PARAPET<br />

LVL +5.95m<br />

GROUND FLOOR<br />

SSL +0.90m<br />

ROOF DECK<br />

SSL +5.05m<br />

GROUND FLOOR<br />

SSL +0.90m<br />

DU<br />

DU<br />

DU<br />

SSL +9.20m<br />

SSL +8.30m<br />

SSL +9.20m<br />

SSL +8.30m<br />

SSL +4.15m<br />

SSL +9.20m<br />

SSL +4.15m<br />

SSL +8.30m<br />

SSL +0.15m<br />

LVL +0.00m<br />

SSL +0.15m<br />

LVL +0.00m<br />

SSL +4.15m<br />

SSL +0.15m<br />

LVL +0.00m<br />

PASSAGE<br />

PASSAGE<br />

PASSAGE<br />

ROOF<br />

FIRST FLOOR<br />

ROOF<br />

DOCS ROOM PASSAGE ANTE ISO.ROOM TOILET<br />

ROOM<br />

DOCS ROOM PASSAGE ANTE ISO.ROOM TOILET<br />

ROOM<br />

TREADMILL TESTING<br />

EEG<br />

DOCS ROOM PASSAGE ANTE ISO.ROOM TOILET<br />

ROOM<br />

TOP OF PARAPET<br />

ROOF<br />

TOP OF PARAPET<br />

FIRST FLOOR<br />

TOP OF PARAPET<br />

GROUND FLOOR<br />

REFERENCE LEVEL<br />

GROUND FLOOR<br />

REFERENCE LEVEL<br />

FIRST FLOOR<br />

GROUND FLOOR<br />

REFERENCE LEVEL<br />

TREADMILL TESTING<br />

TREADMILL TESTING<br />

EEG<br />

EEG<br />

STORE<br />

STORE<br />

STORE<br />

TOP OF PARAPET<br />

LVL +10.10m<br />

ROOF DECK<br />

SSL +9.20m<br />

TOP OF PARAPET<br />

LVL +10.10m<br />

ROOF DECK<br />

SSL +9.20m<br />

FIRST FLOOR<br />

SSL +5.05m<br />

SSL +4.60m<br />

TOP OF PARAPET<br />

LVL +10.10m<br />

FIRST FLOOR<br />

SSL +5.05m<br />

ROOF DECK<br />

SSL +4.60m +9.20m PLAZA ROOFING<br />

SSL +0.90m<br />

SSL +0.45m<br />

LVL +0.00m<br />

SSL +0.90m GROUND FLOOR<br />

FIRST FLOOR<br />

SSL +0.45m +5.05m ENTRANCE PLAZA<br />

SSL +4.60m PLAZA ROOFING<br />

LVL +0.00m REFERENCE LEVEL<br />

SSL +0.90m<br />

SSL +0.45m<br />

LVL +0.00m<br />

PLAZA ROOFING<br />

GROUND FLOOR<br />

ENTRANCE PLAZA<br />

REFERENCE LEVEL<br />

GROUND FLOOR<br />

ENTRANCE PLAZA<br />

REFERENCE LEVEL<br />

SERVING COUNTER<br />

PLAZA ROOFING<br />

SSL +4.45m<br />

TOP OF WALL<br />

LVL +4.05m<br />

FLOORPLANS<br />

8<br />

GROUND FLOOR<br />

PLAZA ROOFING<br />

SSL +4.45m<br />

TOP OF WALL<br />

LVL +4.05m<br />

SECTIONAL<br />

ELEVATION<br />

ROOF DECK<br />

SSL +4.30m<br />

ROOF DECK<br />

SSL +4.30m<br />

GROUND FLOOR<br />

SSL +0.15m<br />

LVL +0.00m<br />

REFERENCE LEVEL<br />

SSL +0.15m<br />

GROUND FLOOR<br />

GROUND FLOOR<br />

SSL +0.15m<br />

LVL +0.00m<br />

REFERENCE LEVEL<br />

SECTION AA<br />

SECTION BB<br />

SECTION CC<br />

4.1614<br />

4.1614<br />

9<br />

FIRST FLOOR<br />

4.1614


The users enter into a “green plaza” with a lattice<br />

shade, creating interesting light and shade patterns<br />

as the day passes, as well as providing a weather-proof<br />

area for uniting, and more importantly doing<br />

away with the claustrophic atmosphere of hospitals.<br />

The users are then led into their specific areas of<br />

need from this space.<br />

AERIAL PERSPECTIVE<br />

The area has been landscaped heavily to reduce the temperatures<br />

in the otherwise hot site. As seen, attempt has been made<br />

to amalgamate landscape with the physical structure through roof<br />

gardens, courtyards, accessible green balconies etc.<br />

10<br />

11


MIXED USE TOWER<br />

DESIGN AND DETAILING<br />

When family, societal values and community are the crux of a residential<br />

development, how do you relocate them into a high rise structure keeping<br />

them happy?, It was thus important to design a haven that will sustain the<br />

very feeling that the residents built their life around. This remaininng the major<br />

goal of the project, a design approach was adopted that not only catered<br />

to the sustainable needs of the environment for users of all age groups. The<br />

creation of “vertical gardens” thus became a priority.<br />

To sustain this society further, neighborhood shops were provided within the<br />

same structure, thereby boosting the economy and reinforcing the concept of<br />

“social sustainability”<br />

The project was aptly named,<br />

“THE ARCHITECTURE<br />

OF<br />

HAPPINESS”<br />

PROCESS<br />

THE<br />

Plot divided<br />

to provide<br />

central open<br />

space.<br />

Four different<br />

towers of<br />

varying heights.<br />

Concept of<br />

single tower<br />

discarded to reduce<br />

estrangement.<br />

Central open<br />

space gives<br />

opportunties<br />

for community<br />

activities.<br />

Form follows<br />

function. Plan<br />

form representing<br />

chawl-tested<br />

examples of community<br />

living. As<br />

seen in Plan 1.<br />

DESIGN CONSTANTS<br />

OPENNESS<br />

IMPORTANCE TO NATURAL LIGHT AND<br />

VENTILATION<br />

+<br />

SUSTAINABLE TECHNIQUES<br />

USE OF SUSTAINABLE ELEMENTS AND<br />

TECHNIQUES<br />

+<br />

EMPHASIS ON SUSTAIBLE INCLU-<br />

SIVE COMMUNITIES<br />

BRINGING TOGETHER DIFFERENT CLASSES OF<br />

SOCIETY<br />

AFFORDABLE HOUSING UNITS<br />

No. of tenements per floor reduced,<br />

accomodating the new orientation to<br />

optimize responsiveness. Oriented<br />

acc. to wind direction and cross ventilation<br />

through large open spaces<br />

as seen in Plan 2.<br />

SERVICE CORE<br />

FIGURE SHOWING FRONTAGE VIEW POINTS<br />

View points decided the<br />

location of the commercial<br />

complex which was<br />

to be separate from the<br />

residential to ensure<br />

safety and privacy.<br />

Access point ‘d’ was<br />

chosen as it was farthest<br />

from any junctions.<br />

‘d’ is located on the local<br />

road and any vehicular<br />

exit and entry from site<br />

will not hamper flow of<br />

traffic.<br />

FIGURE SHOWING POSSIBLE ACCESS POINTS<br />

FIGURE SHOWING WIND DIRECTION SW-NE<br />

A passive design approach<br />

to optimize wind<br />

direction and completely<br />

take advantage of its<br />

cooling and ventilating<br />

effects.<br />

The orientation was changed again<br />

and using similiar modules, a ore<br />

compact plan was devised which had<br />

the following benefits.<br />

-Central open spaces<br />

-Intermediate open spaces in the<br />

form of voids on multiple levels<br />

-Naturally lit and ventilated modules<br />

PLAN 1 PLAN 2<br />

12<br />

13<br />

FINAL DEVELOPMENT BEGAN BASED ON THIS PLAN


1 2 3<br />

4 5 6<br />

7 8 9<br />

* 0 #<br />

Ext. EXT<br />

1 2 3<br />

4 5 6<br />

7 8 9<br />

* 0 #<br />

Ext. EXT<br />

TD<br />

9<br />

W1<br />

W1<br />

D2<br />

D2<br />

BEDROOM 1 DINING CUM<br />

LIVING<br />

3.5MX4.3M<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

BEDROOM 2<br />

D3<br />

TOILET<br />

V V<br />

PODIUM LVL +0.45 +0.45 +0.90<br />

W1<br />

W1<br />

W1<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

BEDROOM 2<br />

KITCHEN<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

BEDROOM 1<br />

KITCHEN<br />

D2<br />

DINING CUM<br />

LIVING<br />

+0.90<br />

D2<br />

D3<br />

D3<br />

ATT. TOILET<br />

ATT. TOILET<br />

V V<br />

+1.90<br />

BEDROOM 2 BEDROOM 2<br />

V<br />

TOILET<br />

+1.90<br />

+2.90<br />

D3<br />

TOILET<br />

W1<br />

BEDROOM 1<br />

KITCHEN<br />

D2 D2<br />

DINING CUM<br />

LIVING<br />

+2.90<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V V<br />

W1<br />

TOILET<br />

KITCHEN<br />

V V V V<br />

V<br />

W1<br />

D3<br />

TOILET<br />

TOILET D3<br />

W1<br />

BEDROOM 1<br />

ATT.<br />

ATT.<br />

D2<br />

TOILET<br />

TOILET<br />

BEDROOM 1 D2<br />

D2<br />

D3<br />

D3<br />

D2<br />

DINING CUM<br />

LIVING<br />

DINING CUM<br />

W1<br />

LIVING<br />

W1<br />

D1<br />

BEDROOM 2<br />

D2<br />

D2 BEDROOM 2<br />

D2<br />

KITCHEN<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1 W1<br />

W1<br />

W1<br />

W1<br />

D2<br />

D1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2 D2 D2 D2<br />

TOILET<br />

D1<br />

D2<br />

D3<br />

D1<br />

D3<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

BEDROOM 1<br />

V<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

V<br />

V<br />

V V<br />

D3<br />

D3<br />

D2<br />

D1<br />

D1<br />

D2<br />

D2<br />

D1<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

BEDROOM 1<br />

D1<br />

DINING CUM<br />

W1<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

D2<br />

TOILET<br />

BEDROOM 2<br />

TOILET<br />

D3<br />

W1<br />

V<br />

V<br />

V<br />

D1<br />

D2<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

D2<br />

BEDROOM 1<br />

W1<br />

BEDROOM 2<br />

KITCHEN<br />

W1<br />

D2<br />

W1<br />

W1<br />

W1<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

D2<br />

D2<br />

W1<br />

BEDROOM 1 DINING CUM<br />

LIVING<br />

3.5MX4.3M<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

BEDROOM 2<br />

BEDROOM 1<br />

KITCHEN<br />

D2<br />

DINING CUM<br />

LIVING<br />

BEDROOM 2 BEDROOM 2<br />

D2<br />

D3<br />

ATT. TOILET<br />

V<br />

TOILET<br />

D3<br />

ATT. TOILET<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

D2<br />

DINING CUM<br />

LIVING<br />

W1<br />

KITCHEN<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V<br />

W1<br />

D3<br />

BEDROOM 1<br />

ATT.<br />

D2<br />

TOILET<br />

W1<br />

BEDROOM 2<br />

D2<br />

D2<br />

W1 KITCHEN<br />

D2<br />

D1<br />

V<br />

V V V<br />

W1<br />

D3<br />

TOILET<br />

D3<br />

BEDROOM 1<br />

ATT.<br />

ATT.<br />

D2<br />

TOILET<br />

TOILET<br />

D2<br />

D3<br />

D2<br />

DINING CUM<br />

LIVING<br />

DINING CUM<br />

W1<br />

D1<br />

LIVING<br />

BEDROOM 2<br />

D2<br />

D2<br />

KITCHEN<br />

D2<br />

W1 W1<br />

W1<br />

W1<br />

W1<br />

D2<br />

D1<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2 D2 D2 D2<br />

TOILET<br />

D1<br />

D2<br />

D3<br />

D1<br />

D3<br />

ATT.<br />

TOILET<br />

TOILET<br />

V V<br />

D3<br />

BEDROOM 1<br />

V<br />

V V<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

V<br />

V<br />

D3<br />

D3<br />

D2<br />

D1<br />

D1<br />

D2<br />

D2<br />

D1<br />

D2<br />

D2<br />

W1<br />

ATT.<br />

TOILET<br />

W1<br />

W1<br />

V<br />

W1<br />

D2<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

Type 1 (Existing Tenements)<br />

Spaces Units Dim.<br />

Area (m2)<br />

The biggest challenge in the project was creating<br />

livable spaces that were not very different<br />

from the users’ current living situations. Providing<br />

for existing tenements, while bringing in new<br />

users ensuring affordability and social inclusion<br />

and relocating them into a high-rise tower, it was<br />

important to heed their one demand- social interaction.<br />

This goal needed to be achieved without<br />

compromising on the fsi, build up or saleable area.<br />

UP<br />

9<br />

LIFT<br />

LIFT<br />

10<br />

US<br />

TD<br />

ED<br />

FD<br />

UP<br />

US<br />

TD<br />

ED<br />

FD<br />

L<br />

UTILITY STORAGE<br />

TELEPHONE DUCT<br />

ELECTRIC DUCT<br />

FIRE DUCT<br />

LIFT<br />

Bedroom<br />

Kitchen<br />

Living<br />

Attached bath<br />

Common bath<br />

Balcony<br />

2<br />

1<br />

1<br />

1<br />

1<br />

2<br />

3.5*3.0<br />

2.5*2.0<br />

3.5*4.0<br />

1.2*2.1<br />

1.2*2.1<br />

1.5*1.0<br />

21<br />

5<br />

14<br />

2.52<br />

2.52<br />

3<br />

FLOOR PLANS<br />

Inclusion of voids or cut-outs for recreational spaces<br />

were the best solution. These double-heighted spaces<br />

dedicated for varying age-groups are open from<br />

three sides with protective railings and free from fsi.<br />

•Commercial intentionally separated from residential<br />

area to ensure privacy.<br />

•the promotion of neighborhood shops in commercial<br />

complex would help boost economy of the locality.<br />

•but, since the cost of saleable area would be too<br />

high for such establishments, the concept of street<br />

shopping inspired by mumbai’s infamous street<br />

shopping itself was conceived.<br />

•wherein, the central courtyard would be an area for<br />

local stalls, artisans etc to set up temporarily, thereby<br />

sustaining local culture and economy.<br />

•this developed the concept of spaces that would<br />

be used as<br />

-set up of temporary stalls<br />

-performance space<br />

-open gallery space<br />

1 2 3 4 5 6 7 8<br />

6M X 4M<br />

11 12 13<br />

14<br />

20<br />

US<br />

21 22<br />

LIFT<br />

LIFT<br />

ED<br />

FD<br />

COMMERCIAL PLAN<br />

16 17 18<br />

19<br />

Cupboard 2 0.6*1.5<br />

Total Saleable Space<br />

Total Carpet Area<br />

Total Built Up<br />

Type 3 (Studio Apartment)<br />

Spaces Units Dim.<br />

Living + B/R 1 -<br />

Kitchen 1 2.5*2.0<br />

Attached bath 1 1.3*2.1<br />

Balcony 0 0<br />

Total Saleable Space<br />

Total Carpet Area<br />

Total Built Up<br />

Type 2 (3BHK)<br />

Spaces<br />

Bedroom 1<br />

Bedroom 2<br />

Bedroom 3<br />

Kitchen<br />

Units<br />

1<br />

1<br />

1<br />

1<br />

Dim.<br />

4.1*4.0<br />

3.5*3.5<br />

2.9*4.1<br />

3.5*2.5<br />

1.8<br />

49.84<br />

45<br />

49.5<br />

Area (m2)<br />

14.88<br />

5<br />

2.5<br />

0<br />

49.84<br />

45<br />

49.5<br />

Area (m2)<br />

16.4<br />

12.25<br />

11.89<br />

8.75<br />

10 11 12 13 14 15 16 17 18 19<br />

1 2 3 4 5 6 7 8 9<br />

10<br />

8 7 6 5 4 3 2 1<br />

SEATING AREA<br />

SEATING AREA ABOVE<br />

CLUB HOUSE BELOW<br />

RAMP<br />

1:10<br />

ROOF PLAN<br />

Living<br />

1<br />

-<br />

25<br />

Attached bath<br />

3<br />

1.2*2.1<br />

7.56<br />

Balcony<br />

3<br />

1.5*1<br />

4.5<br />

Cupboard 1<br />

Cupboard 2<br />

2<br />

2<br />

.6*1.5<br />

.6*1<br />

1.8<br />

1.2<br />

PODIUM PLAN<br />

14<br />

Pvt terrace 1<br />

Total Saleable Space<br />

1.5*1.0<br />

35<br />

124.35<br />

TYPICAL PLAN<br />

15<br />

Total Carpet Area<br />

81.85<br />

Total Built Up<br />

110


WALL FOR<br />

FREE EXPRESSION<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

LEARN WHILE<br />

YOU PLAY<br />

ZONE<br />

SANDBOX<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 2<br />

KITCHEN<br />

W1<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

V<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

W1 W1<br />

W1<br />

KITCHEN<br />

BEDROOM 1<br />

KITCHEN<br />

D2<br />

D2<br />

DINING CUM<br />

LIVING<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2 D2 D2 D2<br />

TOILET<br />

D3<br />

D1<br />

BEDROOM 2 BEDROOM 2<br />

D2<br />

D3<br />

ATT. TOILET<br />

W1 V V<br />

GRAFFITI<br />

FLOOR<br />

W1<br />

BEDROOM 1 DINING CUM<br />

LIVING<br />

3.5MX4.3M<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

BEDROOM 2<br />

D3<br />

TOILET<br />

BEDROOM 2<br />

KITCHEN<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

V<br />

V V<br />

W1<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

D2<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

W1<br />

D1<br />

BEDROOM 2<br />

D2<br />

D2<br />

KITCHEN<br />

D2<br />

W1 W1<br />

V<br />

W1<br />

V<br />

D1<br />

D1<br />

D1<br />

D2<br />

BEDROOM 1<br />

KITCHEN<br />

D2<br />

D2<br />

DINING CUM<br />

LIVING<br />

D1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

D3<br />

ATT.<br />

TOILET<br />

V<br />

TOILET<br />

TOILET<br />

D3<br />

BEDROOM 1<br />

V<br />

V<br />

V V<br />

D3<br />

ATT. TOILET<br />

D3<br />

TOILET<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

D3<br />

D1<br />

D2<br />

D3<br />

ATT. TOILET<br />

V<br />

TOILET<br />

V<br />

D3<br />

BEDROOM 2 BEDROOM 2<br />

ATT.<br />

TOILET<br />

TOILET<br />

V V<br />

BEDROOM 1<br />

D3<br />

ATT. TOILET<br />

D3<br />

D2<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

D1<br />

D2<br />

DINING CUM<br />

LIVING<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2 D2 D2 D2<br />

TOILET<br />

D1<br />

D2<br />

D3<br />

D3<br />

V<br />

V V<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

V<br />

V<br />

D3<br />

D3<br />

D2<br />

D1<br />

D2<br />

D2<br />

BEDROOM 1<br />

D1<br />

D2<br />

DINING CUM<br />

LIVING<br />

D1<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

W1<br />

W1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V<br />

D1<br />

D1<br />

D2<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V V<br />

TOILET<br />

D3<br />

ATT.<br />

TOILET<br />

D3<br />

D2<br />

DINING CUM<br />

LIVING<br />

D2<br />

W1<br />

W1<br />

KITCHEN<br />

W1<br />

W1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V<br />

D1<br />

D1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

D2<br />

V<br />

W1<br />

W1<br />

V<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

TOILET<br />

KITCHEN<br />

D2<br />

BEDROOM 1<br />

W1<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

KITCHEN<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

TOILET<br />

KITCHEN<br />

D2<br />

BEDROOM 1<br />

W1<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

BEDROOM 1 DINING CUM<br />

LIVING<br />

3.5MX4.3M<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

BEDROOM 2<br />

D3<br />

TOILET<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 2<br />

KITCHEN<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

V<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

W1 W1<br />

W1<br />

KITCHEN<br />

V<br />

W1<br />

V<br />

BEDROOM 1<br />

KITCHEN<br />

D2<br />

BEDROOM 1 DINING CUM<br />

LIVING<br />

3.5MX4.3M<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

BEDROOM 2<br />

D3<br />

TOILET<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 2<br />

KITCHEN<br />

D2<br />

D2<br />

W1<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

V<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

W1 W1<br />

D2<br />

DINING CUM<br />

LIVING<br />

D1<br />

D1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

V<br />

W1<br />

W1<br />

W1<br />

V<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2 D2 D2 D2<br />

TOILET<br />

D1<br />

D2<br />

D2<br />

DINING CUM<br />

LIVING<br />

D3<br />

D1<br />

BEDROOM 2 BEDROOM 2<br />

D2<br />

D3<br />

ATT. TOILET<br />

D3<br />

BEDROOM 1<br />

KITCHEN<br />

D2<br />

D1<br />

D1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

ATT.<br />

TOILET<br />

V<br />

TOILET<br />

TOILET<br />

D3<br />

BEDROOM 1<br />

V<br />

V V<br />

V<br />

V V<br />

D3<br />

ATT. TOILET<br />

D3<br />

TOILET<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

D3<br />

D1<br />

D2<br />

D3<br />

ATT. TOILET<br />

V<br />

TOILET<br />

V<br />

D3<br />

BEDROOM 2 BEDROOM 2<br />

ATT.<br />

TOILET<br />

TOILET<br />

BEDROOM 1<br />

D3<br />

ATT. TOILET<br />

D3<br />

D2<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

D1<br />

D2<br />

DINING CUM<br />

LIVING<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2 D2 D2 D2<br />

TOILET<br />

D1<br />

D2<br />

D3<br />

D3<br />

V<br />

V V<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

V<br />

V<br />

V V<br />

D3<br />

D3<br />

D2<br />

D1<br />

D2<br />

D2<br />

BEDROOM 1<br />

D1<br />

W1<br />

KITCHEN<br />

W1<br />

W1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V<br />

D1<br />

D1<br />

D2<br />

DINING CUM<br />

LIVING<br />

D1<br />

D2<br />

D2<br />

D2<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V V<br />

TOILET<br />

D3<br />

ATT.<br />

TOILET<br />

D3<br />

D2<br />

DINING CUM<br />

LIVING<br />

D2<br />

W1<br />

W1<br />

W1<br />

KITCHEN<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V<br />

D1<br />

D1<br />

D2<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V V<br />

TOILET<br />

D3<br />

ATT.<br />

TOILET<br />

D3<br />

D2<br />

DINING CUM<br />

LIVING<br />

D2<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

TOILET<br />

KITCHEN<br />

D2<br />

BEDROOM 1<br />

W1<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

KITCHEN<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

TOILET<br />

KITCHEN<br />

D2<br />

BEDROOM 1<br />

W1<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

KITCHEN<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

KITCHEN<br />

BEDROOM 1<br />

DINING CUM CUM<br />

LIVING<br />

3.5MX4.3M<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

BEDROOM 2<br />

D3<br />

TOILET<br />

BEDROOM 2<br />

KITCHEN<br />

1.5000<br />

D2<br />

D2<br />

W1<br />

V V<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

D2<br />

D2<br />

V<br />

V V<br />

W1<br />

D3<br />

TOILET<br />

BEDROOM 1<br />

ATT.<br />

D2<br />

TOILET<br />

D2<br />

D3<br />

DINING CUM<br />

LIVING<br />

W1<br />

D1<br />

BEDROOM 2<br />

D2<br />

D2<br />

KITCHEN<br />

D2<br />

W1 W1<br />

V<br />

W1<br />

V<br />

D1<br />

D1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D2 D2<br />

KITCHEN<br />

W1<br />

BEDROOM 2<br />

D2<br />

D3<br />

ATT.<br />

TOILET<br />

TOILET<br />

V V<br />

D3<br />

BEDROOM 1<br />

V<br />

D2<br />

D2<br />

W1 W1 W1 W1<br />

V<br />

D3<br />

D3<br />

D2<br />

D1<br />

D2<br />

D2<br />

W1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V<br />

D1<br />

D1<br />

DINING CUM<br />

LIVING<br />

D3<br />

D2<br />

ATT.<br />

TOILET<br />

TOILET<br />

D3<br />

V<br />

V<br />

V V<br />

TOILET<br />

D3<br />

ATT.<br />

TOILET<br />

D3<br />

D2<br />

DINING CUM<br />

LIVING<br />

D2<br />

W1<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

TOILET<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

KITCHEN<br />

W1<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

W1<br />

DINING CUM<br />

LIVING<br />

LIVING<br />

CUM<br />

DINING<br />

OPEN<br />

KITCHEN<br />

TOILET<br />

BEDROOM 2 BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

D2<br />

BEDROOM 2<br />

D3<br />

ATT. TOILET<br />

TOILET<br />

D3<br />

TOILET<br />

OPEN<br />

KITCHEN<br />

W1<br />

D2<br />

BEDROOM 1<br />

D2<br />

DINING CUM<br />

LIVING<br />

LIVING<br />

CUM<br />

DINING<br />

W1<br />

KITCHEN<br />

D2<br />

W1<br />

W1<br />

DINING CUM<br />

LIVING<br />

BEDROOM 1<br />

BEDROOM 1 BEDROOM 1<br />

W1<br />

W1<br />

D2<br />

KITCHEN<br />

W1<br />

DINING CUM<br />

LIVING<br />

D2<br />

BEDROOM 1<br />

D2<br />

W1<br />

TOILET<br />

D3<br />

ATT. TOILET<br />

D3<br />

BEDROOM 2<br />

D2<br />

BEDROOM 2<br />

D2<br />

OPEN<br />

TERRACE<br />

KITCHEN<br />

BEDROOM4<br />

C/BOARD<br />

D3 D3<br />

D2<br />

D2<br />

D2<br />

D2<br />

BEDROOM 1<br />

BEDROOM 2<br />

BEDROOM 1<br />

BEDROOM 2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D3<br />

D2<br />

LIVING CUM<br />

DINING<br />

D3<br />

D2<br />

LIVING CUM<br />

DINING<br />

D2<br />

D2<br />

D<br />

LIVING CUM<br />

DINING<br />

BEDROOM3<br />

D3<br />

D3<br />

BEDROOM 2<br />

D1<br />

D1<br />

1.4994<br />

D<br />

D2<br />

BEDROOM 1<br />

D3<br />

D3<br />

TOILET<br />

D3<br />

ATT. TOILET<br />

DINING CUM D2<br />

D3<br />

LIVING<br />

D2 D2<br />

BEDROOM 2<br />

KITCHEN<br />

BEDROOM 1<br />

W1<br />

D2<br />

D1<br />

D2<br />

W1 W1<br />

D2<br />

D2<br />

W1<br />

D2<br />

W1<br />

BEDROOM 1<br />

KITCHEN<br />

BEDROOM 2<br />

D2 D2<br />

DINING CUM<br />

D3<br />

D2<br />

LIVING<br />

ATT. TOILET<br />

D3<br />

TOILET<br />

D3<br />

D3<br />

BEDROOM 1<br />

D2<br />

W1<br />

D1<br />

D<br />

D2<br />

D1<br />

D1<br />

BEDROOM 2<br />

D3<br />

D3<br />

BEDROOM3<br />

LIVING CUM<br />

DINING<br />

D2<br />

D2<br />

LIVING CUM<br />

DINING<br />

D2<br />

D3<br />

LIVING CUM<br />

DINING<br />

D<br />

D3<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D2<br />

D3<br />

D2<br />

D2<br />

BEDROOM 2 D2<br />

BEDROOM 1<br />

BEDROOM 2 D2<br />

BEDROOM 1<br />

BEDROOM4<br />

KITCHEN<br />

D3<br />

OPEN<br />

TERRACE<br />

D2<br />

D2<br />

C/BOARD<br />

D2<br />

COMMUNITY<br />

ZONE<br />

FIFTH FLOOR PLAN<br />

FOR THE KIDS<br />

DESIGNED FOR THE YOUNGEST USERS- TO LIVE, LAUGH AND<br />

LEARN TO ENCOURAGE THE ARTIST FOR ACTIVE LEARNING WITH<br />

EDUCATIONAL IMPLICATIONS TO PLAY TIME.<br />

DRAWING SPACE PROVIDED ON FLOOR AS WELL!<br />

A SPOT FOR PARENTS TO RELAX AND INTERACT WHILE THEIR<br />

CHILDREN PLAY.<br />

SEVENTH FLOOR PLAN<br />

FOR THE HIGH-OCTANE<br />

A HIGH ENERGY ZONE MEANT FOR SOCIAL INTERACTIONS.<br />

PROVISION OF AMPHITHEATRE FOR ENABLING COMMUNITY<br />

ACTIVITIES, INTERACTIONS, PERFORMANCE ETC.<br />

SIXTEENTH FLOOR PLAN<br />

THE SOCIAL CAVE<br />

A TOP FLOOR ESCAPE WITH PROVISION FOR SMALL FOOD STALLS.<br />

DESIGNED ALSO AS A ‘HANG-OUT’ SPOT IDEAL FOR HOSTING BIRTHDAY<br />

PARTIES AND COMMUNITY GATHERINGS O SPECIAL OCCASSIONS.<br />

SEVENTEENTH FLOOR PLAN<br />

NEW, LARGER TENE-<br />

MENTS<br />

THIS WAS DONE TO ENSURE A MIXED GROUP OF PEOPLE FROM<br />

DIFFERENT ECONOMIC BACKGROUNDS.<br />

THE STUDIO APARTMENT WILL CATER TO YOUNG INDIVID-<br />

UAL/S WITH LOWER INCOME. THIS WOULD FURTHER BUILD<br />

THE STRENGTH OF THE COMMUNITY AS THERE COULD BE<br />

PERSONAL GROWTH AND COMMUNAL GROWTH, FROM THESE<br />

INTERACTIONS.<br />

EIGHTEENTH FLOOR PLAN<br />

THE PENT-HOUSE<br />

PROVISION OF PENT-HOUSE IN THE RESIDENTIAL COMPLEX<br />

CATERED TO THE NEEDS OF FAMILIES IN THE AREA WITH HIGH-<br />

ER NO. OF FAMILY MEMBERS, AS WELL AS TO THE ECONOMIC<br />

NEEDS OF THE PROJECTS.<br />

NINTH FLOOR PLAN<br />

FOR THE THINKERS<br />

FOURTEENTH FLOOR PLAN<br />

FOR THE CONTEMPLATIVE<br />

16<br />

A SPACE TO THINK CONTEMPLAE AND RELAX. FOR PEOPLE OF ALL AGE<br />

GROUPS.<br />

GAZEBOS FOR SHADED SEATING AREA TO MEDITATE AND ENJOY A<br />

PERFECT EVENING SUNSET.<br />

BAMBOO BARRIER MEANT FOR PRIVACY AND LIGHT AND SHADE EFFECTS.<br />

A MULTI-LEVEL SPACE THAT CATERS TO OUR MORE QUIET RESIDENTS.<br />

•PROVISION OF LIBRARY<br />

•OUTDOOR SOLITARY SPACES TO COMPLEMENT THE QUIET ATMOSPHERE.<br />

17


-2.4 M<br />

MACHINE ROOM AND<br />

MUMTY SPACE<br />

TOP FLOOR OF FIFTEENTH<br />

+49.2M<br />

FLOOR<br />

FIFTEENTH FLOOR<br />

TOP FLOOR OF FOURTEENTH<br />

+46.6M<br />

FLOOR<br />

FOURTEENTH FLOOR<br />

+44M<br />

TOP FLOOR OF THIRTEENTH<br />

FLOOR<br />

THIRTEENTH FLOOR<br />

TOP FLOOR OF TWELTH<br />

+41.4M<br />

FLOOR<br />

TWELTH FLOOR<br />

TOP FLOOR OF ELEVENTH<br />

+38.8M FLOOR<br />

ELEVENTH FLOOR<br />

TOP FLOOR OF TENTH<br />

+36.2M FLOOR<br />

TENTH FLOOR<br />

TOP FLOOR OF NINTH FLOOR<br />

+33.6M<br />

NINTH FLOOR<br />

+31M TOP FLOOR OF EIGHTH FLOOR<br />

EIGHTH FLOOR<br />

TOP FLOOR OF SEVENTH<br />

+28.4M<br />

FLOOR<br />

+57M<br />

MACHINE ROOM AND MUMTY SPACE<br />

+54.4M TOP FLOOR OF EIGHTEENTH FLOOR<br />

EIGHTEENTH FLOOR<br />

+51.8M TOP FLOOR OF SEVENTEENTH FLOOR<br />

SEVENTEENTH FLOOR<br />

TOP FLOOR OF SIXTEENTH<br />

+49.2M<br />

FLOOR<br />

SIXTEENTH FLOOR<br />

TOP FLOOR OF FOURTEENTH<br />

+46.6M<br />

FLOOR<br />

FOURTEENTH FLOOR<br />

+44M<br />

TOP FLOOR OF 13TH FLOOR<br />

13TH FLOOR<br />

TOP FLOOR OF 12TH<br />

+41.4M<br />

FLOOR<br />

12TH FLOOR<br />

TOP FLOOR OF 11TH FLOOR<br />

+38.8M<br />

11TH FLOOR<br />

TOP FLOOR OF 10TH<br />

+36.2M FLOOR<br />

10TH FLOOR<br />

TOP FLOOR OF 9TH FLOOR<br />

+33.6M<br />

9TH FLOOR<br />

+31M TOP FLOOR OF 8TH FLOOR<br />

8TH FLOOR<br />

+28.4M TOP FLOOR OF 7TH FLOOR<br />

What interested you as a child? What kind of an environment<br />

kept your interest active? How are the current building<br />

structures failing a child’s natural behavior?<br />

With these questions in mind, the project was embarked<br />

on. Level differences, graffiti walls, movable partitions between<br />

classrooms, colors and more colors, rope-climbing<br />

and slides as part of building structure, huge open courtyards,<br />

the possiblities and the effects of design were endless.<br />

PLAY SCHOOL<br />

SEVENTH FLOOR<br />

+25.8M<br />

TOP FLOOR OF SIXTH<br />

FLOOR<br />

7TH FLOOR<br />

+25.8M<br />

TOP FLOOR OF 6TH<br />

FLOOR<br />

SIXTH FLOOR<br />

6TH FLOOR<br />

+23.2M TOP OF FIFTH FLOOR<br />

+23.2M TOP OF 5TH FLOOR<br />

FIFTH FLOOR<br />

5TH FLOOR<br />

+20.6M TOP OF FOURTH FLOOR<br />

+20.6M TOP OF 4TH FLOOR<br />

FOURTH FLOOR<br />

4TH FLOOR<br />

+18M<br />

TOP OF THIRD FLOOR<br />

+18M<br />

TOP OF 3RD FLOOR<br />

THIRD FLOOR<br />

3RD FLOOR<br />

+15.45M<br />

TOP OF SECOND FLOOR<br />

+15.45M<br />

TOP OF 2ND FLOOR<br />

SECTIONS<br />

SECTION AA'<br />

VOID<br />

+12.85M<br />

+10.25M<br />

+7.65M<br />

+7.2M<br />

+4.8 M<br />

+2.4 M<br />

+0.0 M<br />

SECOND FLOOR<br />

TOP OF FIRST FLOOR<br />

FIRST FLOOR<br />

TOP OF GROUND FLOOR<br />

GROUND FLOOR<br />

PLIINTH<br />

STILT 3<br />

TOP OF STILT 2<br />

STILT 2<br />

TOP OF STILT 1<br />

STILT 1<br />

TOP OF BASEMENT<br />

BASEMENT<br />

+57M<br />

MACHINE ROOM AND MUMTY SPACE<br />

+54.4M TOP FLOOR OF EIGHTEENTH FLOOR<br />

EIGHTEENTH FLOOR<br />

+51.8M TOP FLOOR OF SEVENTEENTH FLOOR<br />

SEVENTEENTH FLOOR<br />

TOP FLOOR OF SIXTEENTH<br />

+49.2M<br />

FLOOR<br />

SIXTEENTH FLOOR<br />

TOP FLOOR OF FOURTEENTH<br />

+46.6M<br />

FLOOR<br />

FOURTEENTH FLOOR<br />

+44M<br />

TOP FLOOR OF 13TH FLOOR<br />

+41.4M<br />

+38.8M<br />

+36.2M<br />

+33.6M<br />

+31M<br />

13TH FLOOR<br />

TOP FLOOR OF 12TH<br />

FLOOR<br />

12TH FLOOR<br />

TOP FLOOR OF 11TH FLOOR<br />

11TH FLOOR<br />

TOP FLOOR OF 10TH<br />

FLOOR<br />

10TH FLOOR<br />

TOP FLOOR OF 9TH FLOOR<br />

9TH FLOOR<br />

TOP FLOOR OF 8TH FLOOR<br />

3.5<br />

2.1<br />

3.5<br />

SECTION BB'<br />

+12.85M<br />

+10.25M<br />

+7.65M<br />

+7.2M<br />

+4.8 M<br />

+2.4 M<br />

+0.0 M<br />

-2.4 M<br />

2ND FLOOR<br />

TOP OF1ST FLOOR<br />

1ST FLOOR<br />

TOP OF GROUND FLOOR<br />

GROUND FLOOR<br />

PLIINTH<br />

STILT 3<br />

TOP OF STILT 2<br />

STILT 2<br />

TOP OF STILT 1<br />

STILT 1<br />

TOP OF BASEMENT<br />

BASEMENT<br />

8TH FLOOR<br />

+28.4M<br />

TOP FLOOR OF 7TH FLOOR<br />

7TH FLOOR<br />

+25.8M<br />

TOP FLOOR OF 6TH<br />

FLOOR<br />

6TH FLOOR<br />

+23.2M<br />

TOP OF 5TH FLOOR<br />

5TH FLOOR<br />

+20.6M<br />

TOP OF 4TH FLOOR<br />

4TH FLOOR<br />

+18M<br />

TOP OF 3RD FLOOR<br />

3RD FLOOR<br />

+15.45M<br />

TOP OF 2ND FLOOR<br />

2ND FLOOR<br />

+12.85M<br />

TOP OF1ST FLOOR<br />

1ST FLOOR<br />

+10.25M<br />

TOP OF GROUND FLOOR<br />

GROUND FLOOR<br />

+7.65M<br />

+7.2M<br />

PLIINTH<br />

STILT 3<br />

+4.8 M<br />

TOP OF STILT 2<br />

STILT 2<br />

+2.4 M<br />

TOP OF STILT 1<br />

+0.0 M<br />

STILT 1<br />

TOP OF BASEMENT<br />

-2.4 M<br />

BASEMENT<br />

18<br />

SECTION CC'<br />

19


play area<br />

9<br />

8<br />

play area<br />

7<br />

SITE PLAN<br />

Main road<br />

pedestrian entry<br />

secondary road<br />

play area<br />

Vehicular<br />

entry<br />

Inspired after reading charles jencks and gardens of cosmic<br />

speculation, the same concept of design was adopted, using<br />

“cosmic phenomenon in architecture”,<br />

and<br />

“phase differences”<br />

The ever-changing universe forming the inspiration, a building<br />

was designed that rose from th e ground and eventually merge<br />

into it.<br />

FLOOR PLAN<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

10<br />

11<br />

Reception<br />

Office<br />

Staff toilet<br />

Principal’s room<br />

Storage + pantry<br />

Worker’s room<br />

Staff +sick room<br />

Toilets for kids<br />

Classroom 1<br />

Classroom 2<br />

Non -teaching staff<br />

(assistants’) room<br />

1<br />

2<br />

5<br />

3<br />

6<br />

4<br />

ELEVATIONS<br />

SECTION AA<br />

SE ELEVATION<br />

NW ELEVATION<br />

SW ELEVATION<br />

NE ELEVATION<br />

20<br />

SECTIONS<br />

SECTION BB<br />

21


WALKWAY DESIGN<br />

22<br />

23


PROFESSIONAL<br />

WORKS (2014-2015)<br />

24<br />

As part of the academic course, I have gained professional experience in the<br />

past one year working in Dubai as well as India. I have been humbled with the<br />

opportunity to work for several reknowned firms such as W.S. Atkins & Partners<br />

Overseas, Arkiteknik International Consulting Engineers (Dubai) and Mendonca<br />

Associates (India.) Projected are few of my professional works done in these<br />

offices.<br />

25


UPGRADATION OF PLAYGROUND<br />

SUMMARY<br />

This project was executed in St. Gerosa<br />

High School, Mangalore, India in a limited<br />

budget with crowd-funding. Hence,<br />

here were limitations to the design ideas<br />

that could be executed.<br />

upgradation OF playground@ st. gerosa high school, mangalore<br />

Being the project leader, I was involved<br />

in extensively in every step of the project,<br />

including costing and estimation,<br />

design, site supervision, project management<br />

etc.<br />

Softwares used: Adobe Illustrator, Adobe<br />

Photoshop, Autocad, Sketchup.<br />

Principal Architect: Ar. shok Mendonca<br />

26<br />

1<br />

STEEP SEATING GALLERY<br />

THE STEPS ALTHOUGH PROVIDING BETTER VISIBILITY ARE<br />

RISKY TO NEGOTIATE AND HAS POTENTIAL OF CAUSING<br />

INJURIES.<br />

REMODELLED TO INCREASE ACCESSIBILITY/ SAFETY. ALSO<br />

CLAD WITH BRICK TILES TO MAKE IT MORE PRESENTABLE<br />

2<br />

THE DRAIN ON THE NW- NE SIDE SEEMS TO BE<br />

NARROWED. ALSO WIDE SPACE SPACE AVAILABLE AT EDGE<br />

OF DRAIN, WHICH COULD BE TAKEN ADVANTAGE OF.<br />

AUDIENCE ON THIS GALLERY GETS DIRECT EXPOSURE TO<br />

MORNING GLARE.<br />

CLEAR DRAIN AND RAISE SIDE ON GALLERY SIDE.<br />

USE SPACE AVAILABLE TO INCREASE STEPS TO A<br />

STANDARDISED HEIGHT/ WIDTH RATIO. IF BUDGET<br />

PERMITS, PROVIDE CANTIVERED CANOPY.<br />

3<br />

DRAINAGE / CANOPY / GALLERY<br />

TOILET ACCESS<br />

THE STEPS TO TOILETS ARE POORLY PLANNED.<br />

THE GALLERY ARRANGEMENT ALSO UPSET AS A<br />

RESULT.<br />

REDESIGN OF MOVEMENT POSSIBLE THEREBY<br />

IMPROVING THE GALLERY SEATING AND SAFETY<br />

OF USERS.<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

4<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

S C H O O L<br />

SHED<br />

SERVICES INTEGRATION<br />

THE PLUMBING LINES ARE EXPOSED, AFFECTING BOTH THE<br />

SAFETY OF PIPES AS WELL AS THE USERS.<br />

CREATE TRENCH/ CONDUITS IN THE REMODELLED STEPS TO<br />

ELIMINATE THIS CLASH<br />

Hand Wash<br />

5<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

GRADING OF GROUND<br />

12<br />

THE SURFACE IS NOT ADEQUATELY SLOPED AND NOT<br />

UNIFORM.<br />

THE SURFACE COULD BE UNIFORMLY SLOPED TOWARDS THE<br />

STAGE BLOCK OR TOWARDS THE CENTRE AS PER THE<br />

OPTION CHOSEN. @ APPROXIMATLY 1% WHICH COULD<br />

HELP IN BETTER DRAINAGE. THE MINIMUM SLOPE<br />

REQUIRED IS .62 M AGAINST THE AVAILABLE .31<br />

SPACE AVAILABLE DUE TO NEW<br />

RETENTION<br />

THE SPACE CREATED BY THE OFFSET OF FOUNDATION OF<br />

NEW RETENTION WALL, RELEASES SPACE TOWARDS THE<br />

GROUND<br />

THIS COULD BE UTILISED FOR CREATION OF ADDITIONAL<br />

GALLERIES AND SUPPLEMENTARY PLANING<br />

6<br />

BUILDING<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

UTILIZATION OF FIELD<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

11 OBSTACLES ON FIELD<br />

THE POLES ROVIDED FOR SOME OF THE GAMES COULD POSE<br />

TO BE A HAZARD.<br />

ARRANGEMENTS TO PROVIDE SOCKETS IN GROUND FOR<br />

DISMANTLING.<br />

10 DRAIN HAZARD<br />

THE AVALABLE SPACE BEING LIMITED, PLANNING FOR<br />

MULTIPLE GAMES ID THE ONLY WAY TO MAXIMISE THE<br />

UTILITY OF GROUND<br />

PROPOSAL TO PROVIDE 5 LANE ATHLETIC TRACKS, THROW<br />

BALL (2 NO.S), KHO KHO AND MINI FOOTBALL.<br />

THE DRAIN COVER PROJECTS OUT FROM THE SURFACE OF<br />

THE FIELD CREATING HAZARD<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

THE DRAIN TO BE MADE FLUSH TO THE NEW FIELD PROFILE.<br />

9<br />

8<br />

ELIMINATION OF DRAIN<br />

THE RCC COVERED DRAIN IS A HAZARD<br />

REALIGN ALONG THE PERIPHERY OF THE BUILDING/<br />

AMNETIES, WITH COVER FLUSHED TO THE GROUND PROFILE<br />

TREES ON FIELD<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

SOME OF THE MATURE TREES ARE WELL ESTABLISHED IN THE<br />

FIELD<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

THE TREE TRUNK DEFINES THE EXTENT OF THE TRACK FIELD<br />

(INDICATED IN DOTTED). THE MAX LENGTH OF OUTER<br />

TRACK AVAILABLE IS 148 M .<br />

7<br />

TRACK FOR SPRINTS<br />

upgradation OF playground@ st. gerosa high school, mangalore<br />

THE LONGEST AVAILABLE IS FROM THE<br />

SAND PIT TO THE NORTHWEST GALLERY.<br />

IT IS POSSIBLE TO CREATE A 50M DASH<br />

TRACK PARALLEL TO THE NE GALLERY.<br />

identification of issues<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

BY AN AUTODESK EDUCATIONAL PRODUCT<br />

BROCHURE FOR APPEAL FOR CROWD-FUNDING<br />

DETAILS OF SOUTH WEST GALLERY<br />

B<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

A<br />

A<br />

B<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PLAN OF SOUTH WEST GALLERY<br />

-AA<br />

PRODUCED BY AN AUTODESK EDU<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PROPOSED PLAN OF PLAYGROUND<br />

SECTION BB<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

radation OF playground@ st. gerosa high school, mangaloreCONCEPTUAL VIEWS FOR APPEAL<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

DETAILS OF NORTH EAST GALLERY<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

VIEW OF BRICK CLADDING IN NE GALLERY<br />

VIEW OF NW GALLERY<br />

VIEW OF NW GALLERY<br />

SECTION THROUGH NORTHEAST GALLERY<br />

CONCEPTUAL design : APPEAL PRESENTATIONS<br />

CED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PR<br />

27


trench<br />

S_05<br />

RP-1<br />

Cover top finish level =100.341f<br />

Outgoing invert level =99.891<br />

Distance from the last chamber=17.688m @1%=100.341-0.176= 100.165m<br />

Fin ground level at 1st branch =100.165f<br />

Outgoing invert level at 1st junction=100.165-(0.228+0.200+0.210)=99.527m<br />

60 m ash track- 6 lanes ( 0.9 m X 6 no.s)<br />

Inner perimeter of track = 117 m<br />

Cover top finish level =99.963f<br />

Outgoing invert level =99.325<br />

Distance from the last chamber=20.270m @1%=100.165-0.202= 99.963m<br />

Fin ground level at 1st branch =99.963f<br />

Outgoing invert level at 1st junction=99.963-(0.228+0.200+0.210)=99.325m<br />

Difference between fin gr level & invert = 0.638m<br />

Outgoing invert leading to convent well / 110mm Ø PVC pipe, CL2 /=99.325m<br />

(provide valve in inspection chamber at entry to convent well)<br />

P15<br />

14.393<br />

Existing drain invert level<br />

1.401<br />

Existing drain invert level<br />

1.401<br />

1.500<br />

Existing ground level<br />

0.100<br />

0.100<br />

0.100<br />

0.600<br />

0.600<br />

Existing ground level<br />

0.100<br />

0.100<br />

0.600<br />

1.500<br />

3.806 1.500<br />

3.754<br />

0.600<br />

0.100<br />

0.600<br />

0.100<br />

0.600<br />

Existing drain invert level<br />

1.401<br />

Existing ground level<br />

0.100<br />

0.100<br />

0.600<br />

0.415<br />

0.101<br />

28<br />

0.101<br />

0.415<br />

0.101<br />

1.475<br />

1.920<br />

2.423<br />

2.227<br />

8" Ø pipe<br />

20.544<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

Perforated pipe -01<br />

20.268<br />

6" dia pipe to be connected to well<br />

REORGANIZED PLAN- GIRLS’ TOILET<br />

PLAYGROUND AND SURROUNDINGS<br />

20.268<br />

6" dia pipe to be connected to we l<br />

LIGHTROOFING AND FOOTING DETAILS<br />

KEY PLAN<br />

RP-2<br />

4" Ø PVC pipe, CL2 /=99.325m<br />

Outgoing invert level =99.325 /<br />

leading to convent well /<br />

8" Ø pipe to drain<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

LIGHTROOFING AND FOOTING DETAILS<br />

This project had several constituents:<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

1. Upgradation of Play-ground facilities.<br />

2. Redesign of galleries.<br />

3. Upgradation of toilet facilities of girls and boys.<br />

4. Design of water trough near the play ground.<br />

5. Redesign of water drainage facilities.<br />

20.341<br />

0.230<br />

150 Ø pipe (20.3 kg/ m)<br />

od=166.5<br />

thickness= 8.25 mm<br />

100.751<br />

100.370<br />

F AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

P-19<br />

0.381<br />

0.075<br />

F AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

REORGANIZED PLAN- GIRLS’ TOILET<br />

0.812<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

1.5 0<br />

0.050<br />

Section through stage<br />

0.230<br />

150 Ø pipe (20.3 kg/ m)<br />

od=166.5<br />

thickness= 8.25 mm<br />

Existing gallery outline<br />

100.751<br />

100.370<br />

0.100 0.100<br />

0.415<br />

0.765<br />

0.381<br />

S-01<br />

1.500<br />

PLAN<br />

0.050<br />

0.075<br />

0.100<br />

1.800<br />

0.812<br />

0.600<br />

Section through stage<br />

Existing gallery outline<br />

0.075<br />

0.075<br />

0.075<br />

0.706<br />

0.100 0.100<br />

0.415<br />

0.765<br />

0.306<br />

S-01<br />

PLAN<br />

Section of NorthWest Gallery S-01<br />

Section of NorthWest Gallery S-01<br />

1.800<br />

0.110<br />

0.075<br />

0.075<br />

0.075 0.100<br />

0.075<br />

0.306<br />

99.9680.706<br />

Existing ground level<br />

0.100<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

0.100<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

0.110<br />

0.075<br />

99.968<br />

Existing ground level<br />

0.100<br />

0.100<br />

ENTRANCE STAIRS AND DRAINS<br />

Existing ground level<br />

102.296<br />

Riser = 0.381<br />

Tread = 0.609<br />

Riser = 0.381<br />

Tread = 0.609<br />

0.641<br />

0.641<br />

0.100<br />

1.500<br />

0.130<br />

0.100<br />

0.100<br />

0.884<br />

1.800<br />

1.800<br />

3.806 1.500<br />

0.050<br />

0.812<br />

0.050<br />

0.812<br />

Section through steps<br />

0.100<br />

0.415<br />

0.100<br />

0.100<br />

100.786<br />

Riser = 0.150m<br />

Tread = 0.300m<br />

0.574<br />

0.100<br />

0.415<br />

100.786<br />

1.800<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

Existing stage profile<br />

0.100 Riser = 0.150m<br />

Tread = 0.300m<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, M<br />

S-02<br />

0.100<br />

STAGE ENTRANCE STAIR AND DRAIN DETAILS<br />

Existing drain invert level<br />

3.754<br />

100.804<br />

0.600<br />

1.800<br />

0.415x0.415/12mm thk MS<br />

Existing stage base plate profile with provision for<br />

18mm Ø MS threaded bolts, projecting<br />

38 mm above footing surface,<br />

of 0.228m length set as assembly<br />

at time of pouring of concrete to<br />

specified spacing<br />

10 mm bar @ .15 m c/c<br />

10 mm bar @ .15 m c/c<br />

0.075<br />

PRODUCED BY AN AUTODESK 0.100 EDUCATIONAL PRODUCT<br />

0.075<br />

150 Ø pipe (20.3 kg/ m)<br />

0.100<br />

od=166.5<br />

0.765<br />

0.100<br />

thickness= 8.25 mm<br />

150 Ø pipe (20.3 kg/ m)<br />

0.574<br />

od=166.5<br />

thickness= 8.25 mm<br />

Section through steps<br />

S-02<br />

DETAILS<br />

0.415x0.415/12mm thk MS<br />

base plate with provision for<br />

18mm Ø MS threaded bolts, projecting<br />

38 mm above footing surface,<br />

of 0.228m length set as assembly<br />

at time of pouring of concrete to<br />

0.075<br />

specified spacing<br />

0.075<br />

10 mm bar @ .15 m c/c<br />

0.765<br />

10 mm bar @ .15 m c/c<br />

Existing granite<br />

slabs used as covers<br />

GALLERY SECTIONAL<br />

Existing ground level<br />

102.296<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

1.637<br />

SECTION OF UPPER FOOTING<br />

1:3 CM plaster to finish<br />

1:3 CM plaster to finish<br />

flush with 229x229x20mm thk<br />

flush with 229x229x20mm thk<br />

terracotta tiles<br />

terracotta tiles<br />

edge tiles<br />

edge tiles<br />

16mm MS bars to be rammed<br />

16mm MS bars to be rammed<br />

into existing masonary ,<br />

into existing masonary ,<br />

approx 0.228m, to anchor the<br />

approx 0.228m, to anchor the<br />

PCC work above @ approx 6 ft ² grid<br />

PCC work above @ approx 150 Ø pipe 6 ft ² (20.3 grid kg/ m)<br />

od=166.5<br />

thickness= 8.25 mm<br />

Existing gallery outline<br />

Road Widening Outline / 100' ROW<br />

4.947<br />

Existing gallery outline<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

0.130<br />

0.884<br />

6.841<br />

Existing granite<br />

slabs used as covers<br />

Existing granite<br />

slabs used as covers<br />

STAGE ENTRANCE STAIR AND DRAIN DETAILS<br />

Section of NorthWest Gallery S-02<br />

Section of NorthWest Gallery S-02<br />

DETAILS<br />

1:3:6 PCC using 20mm<br />

1:3:6 PCC using 20mm<br />

downgraded aggregate with nominal reinforcement<br />

downgraded aggregate with nominal reinforcement Distribution steel @ .3 c/c<br />

Distribution steel @ .3 c/c<br />

Main reinforcement bars @ .45 c/c.<br />

0.230<br />

100.751<br />

100.370<br />

0.130<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

Main reinforcement bars @ .45 c/c.<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

Riser = 0.381<br />

Tread = 0.609<br />

Existing gallery outline<br />

0.361<br />

0.884<br />

100.804<br />

0.415x0.415/12mm thk MS<br />

base plate with provision for<br />

18mm Ø MS threaded bolts, projecting<br />

38 mm above footing surface,<br />

of 0.228m length set as assembly<br />

at time of pouring of concrete to<br />

specified spacing<br />

10 mm bar @ .15 m c/c<br />

10 mm bar @ .15 m c/c<br />

1.637<br />

SECTION OF UPPER FOOTING<br />

0.100<br />

0.100<br />

PRODUCED BY AN AUTODESK EDUCATIONAL 150 Ø PRODUCT<br />

pipe (20.3 kg/ m)<br />

150 Ø pipe (20.3 kg/ m)<br />

od=166.5<br />

od=166.5<br />

thickness= 8.25 mm<br />

thickness= 8.25 mm<br />

1.637<br />

SECTION OF UPPER FOOTING<br />

Riser = 0.381<br />

Tread = 0.609<br />

0.663<br />

Road Widening Outline / 100' ROW<br />

4.947<br />

1.401<br />

Section of NorthWest Gallery S-01<br />

0.361<br />

Existing gallery outline<br />

SECTION OF LOWER FOOTING<br />

Existing ground level<br />

0.415x0.415/12mm thk MS<br />

base plate with provision for<br />

18mm Ø MS threaded bolts, projecting<br />

38 Existing mm above ground footing level surface,<br />

of 102.296 0.228m length set as assembly<br />

at time of pouring of concrete to<br />

specified spacing<br />

10 mm bar @ .15 m c/c<br />

10 mm bar @ .15 m c/c<br />

6.841<br />

0.230<br />

100.751<br />

100.370<br />

Road Widening Outline / 100' ROW<br />

0.230<br />

4.947<br />

0.100<br />

150 Ø pipe (20.3 kg/ m)<br />

od=166.5<br />

thickness= 8.25 mm<br />

100.751<br />

100.370<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

Riser = 0.381<br />

Tread = 0.609<br />

Riser = 0.381<br />

Tread = 0.609<br />

SECTION OF UPPER FOOTING<br />

100.291<br />

Existing ground level<br />

100.291<br />

0.282 Existing ground level<br />

0.282<br />

Section of SouthWest Gallery S-04<br />

Section of SouthWest Gallery S-04<br />

0.439<br />

0.439<br />

SECTION OF LOWER FOOTING<br />

LIGHTROOFING AND FOOTING DETAILS<br />

6.841<br />

0.230<br />

100.751<br />

100.370<br />

0.100<br />

SECTION<br />

ODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

0.381<br />

150 Ø pipe (20.3 kg/ m)<br />

od=166.5<br />

thickness= 8.25 mm<br />

0.415x0.415/12mm thk MS<br />

base plate with provision for<br />

18mm Ø MS threaded bolts, projecting<br />

38 mm above footing surface,<br />

of 0.228m length set as assembly<br />

at time of pouring of concrete to<br />

specified spacing<br />

10 mm bar @ .15 m c/c<br />

10 mm bar @ .15 m c/c<br />

0.100<br />

PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT<br />

SECTION OF UPPER FOOTING<br />

0.100<br />

0.600<br />

LIGHT ROOFING AND FOOTING<br />

Section of NorthWest Gallery S-01<br />

0.663<br />

Riser = 0.381<br />

Tread = 0.609<br />

0.100<br />

Existing ground level<br />

102.296<br />

Riser = 0.381<br />

Tread = 0.609<br />

0.100<br />

0.100<br />

0.230<br />

LIGHTROOFING AND FOOTING DETA<br />

SECTION OF LOWER FOOTING<br />

150 Ø pipe (20.3 kg/ m)<br />

od=166.5<br />

thickness= 8.25 mm<br />

100.751<br />

100.370<br />

1:3 CM plaster to finish<br />

flush with 229x229x20mm thk<br />

terracotta tiles<br />

edge tiles<br />

16mm MS bars to be rammed<br />

1:3 CM plaster to finish<br />

into existing masonary ,<br />

flush with 229x229x20mm thk<br />

approx 0.228m, to anchor the<br />

terracotta tiles<br />

PCC work above @ approx 6 ft ² grid<br />

edge tiles<br />

150 Ø 16mm pipe (20.3 MS bars kg/ m) to be rammed<br />

od=166.5 into existing masonary ,<br />

thickness= 8.25 mm<br />

approx 0.228m, to anchor the<br />

PCC work above @ approx 6 ft ² grid<br />

DETAILS<br />

1:3:6 PCC using 20mm<br />

downgraded aggregate with nominal reinforcement<br />

Distribution steel @ .3 c/c<br />

1:3:6 PCC using 20mm<br />

downgraded aggregate with nominal reinforcement<br />

Distribution steel @ .3 c/c<br />

Section of NorthEast Gallery S-03<br />

Section of NorthEast Gallery S-03<br />

Existing gallery outline<br />

Section of NorthWest Gallery S-02<br />

Existing gallery outline<br />

0.381<br />

0.100<br />

Section of NorthWest Gallery S-02<br />

Main reinforcement bars @ .45 c/c.<br />

Main reinforcement bars @ .45 c/c.<br />

100.751<br />

100.292<br />

29<br />

0.075<br />

100.751<br />

100.292<br />

R<br />

Tr<br />

0.07


Outlet 6"Ø pipe<br />

99.890<br />

0.150<br />

2 mm precast RCC cover<br />

0.075<br />

precast RCC frame<br />

0.150<br />

00<br />

1.839 0.150<br />

er flow pipe 6"Ø<br />

100mm thk RCC wall with<br />

18mm thk plaster in two layer<br />

on inner side<br />

0.100<br />

4"thk hardcore using<br />

40mm aggregates<br />

and soil<br />

GRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

Key Plan<br />

0.100<br />

0.200<br />

3"Øinlet / toilet roof<br />

100.299m<br />

100.149m<br />

Section S-02<br />

0.117 0.678<br />

0.012<br />

1.136<br />

Angle section 50x50 /6 mm thk/fixed in to pcc<br />

44 mm pre cast rcc cover<br />

0.006 0.012<br />

0.117 0.678<br />

0.117<br />

0.702<br />

150mm PCC with 18mm thk<br />

3"Øinlet / toilet roof<br />

plaster in two layer on inner side<br />

0.774<br />

0.168 0.600 0.168<br />

0.100<br />

1.136<br />

Plan/ Section- Trench<br />

Scale 1:20<br />

30<br />

0.386 0.244<br />

0.086<br />

0.150<br />

0.200<br />

inlet 6"Ø pipe/trench<br />

0.600<br />

0.288<br />

0.548<br />

1.050<br />

99.963f<br />

In this level also provide<br />

8" Øinlet pipe 8" Ø outlet pipe<br />

4" out going invert leading<br />

99.325to convent well<br />

0.691 0.691<br />

RCC slab<br />

To be detailed<br />

0.050<br />

0.200<br />

0.012<br />

0.848<br />

0.117<br />

FILTER TANK<br />

0.175<br />

0.430<br />

0.050 0.050<br />

Outlet 6"Ø pipe<br />

S_01<br />

0.636 0.200<br />

0.936<br />

Outlet 6"Ø pipe<br />

0.100<br />

0.068<br />

0.100<br />

0.100<br />

150mm solid PCC block<br />

masonary in one layer only<br />

with 18mm thk plaster in<br />

two layer on inner side of I C<br />

4" thk pcc bed using 1:2:4 mix<br />

&20mm aggregates<br />

DETAILS<br />

0.638<br />

0.150<br />

0.228<br />

0.698<br />

0.150<br />

0.848<br />

Sectional Elevation E-01<br />

Plan of Trough<br />

1:3:6 lean concrete<br />

4.016<br />

0.101<br />

0.150<br />

0.100<br />

Existing building line<br />

0.666<br />

3.000<br />

Ground<br />

Precast RCC frame<br />

RCC Side wall<br />

40 mm downgraded aggregate<br />

soil macadam hardcore<br />

Soil to be filled and compacted<br />

0.250 0.500 0.500 0.500 0.500 0.500 0.249<br />

1.412<br />

S_01<br />

0.136<br />

3.209<br />

17-6-362/13(81), Basement Floor, Shalom Shopping Complex,<br />

Fr. Muller Road, Jeppu, Mangalore-575002<br />

Tel: +91 824 4252919 E-mail: ma_architects@rediffmail.com<br />

0892m x0892 m precast RCC cover-slab<br />

1.050<br />

100.341f<br />

Precast RCC frame<br />

6" Øinlet pipe 8" Ø outlet pipe<br />

99.891<br />

0.304<br />

WATER TROUGH<br />

0.150<br />

0.450<br />

0.228 0.750<br />

0.362 0.362<br />

1.374<br />

1.524<br />

2.132<br />

1.537<br />

0.228<br />

0.086<br />

DETAILS<br />

DEVELOPMENT OF AMENITIES AT ST. GEROSA<br />

SCHOOL, MANGALORE<br />

WASHBASIN TROUGH @ RENOVATED GIRLS' TOILET BLOCK<br />

0.394<br />

0.068<br />

0.086<br />

0.150<br />

0.100<br />

0.304<br />

250gsm geotextile barrier<br />

96.790<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

0.075 mm thick custom-made<br />

internal Ø 1.370m RCC rings<br />

with 6 perforations of Ø 75 mm.<br />

75 mm downgraded aggregates<br />

96.540 depth of pit /<br />

hardcore starts above this<br />

DETAILS OF DRAINAGE COMPONENTS<br />

0.150 0.118<br />

0.750 0.118 0.150<br />

1.286<br />

16 no's /50 mm Øpipe for infiltration<br />

1.050<br />

0.892m x 0.892 mm precast RCC cover<br />

0.075 0.004<br />

0.004 0.075<br />

0.892101.153f<br />

Inlet pipe 6"Ø pipe<br />

0.892m x 0.892 mm precast RCC cover<br />

0.600<br />

101.153f<br />

0.750<br />

0.819<br />

0.150 0.786<br />

0.150<br />

0.100<br />

0.100<br />

1.286<br />

Section through filtration tank<br />

0.118<br />

precast RCC frame<br />

Outlet 6"Ø pipe<br />

1.839 0.150<br />

over flow pipe 6"Ø<br />

99.890<br />

100mm thk RCC wall with<br />

18mm thk plaster in two layer<br />

on inner side<br />

0.100<br />

4"thk hardcore using<br />

40mm aggregates<br />

and soil<br />

0.100<br />

0.200<br />

3"Øinlet / toilet roof<br />

0.117 0.678<br />

0.012<br />

1.136<br />

Angle section 50x50 /6 mm thk/fixed in to pcc<br />

44 mm pre cast rcc cover<br />

0.006 0.012<br />

0.117 0.678<br />

0.117<br />

0.702<br />

150mm PCC with 18mm thk<br />

3"Øinlet / toilet roof<br />

plaster in two layer on inner side<br />

0.774<br />

0.200<br />

inlet 6"Ø pipe/trench<br />

0.600<br />

0.168 0.600 0.168<br />

0.100<br />

1.136<br />

Plan/ Section- Trench<br />

Scale 1:20<br />

0.288<br />

1.050<br />

99.963f<br />

0.638<br />

In this level also provide<br />

8" Øinlet pipe 8" Ø outlet pipe<br />

4" out going invert leading<br />

99.325to convent well<br />

0.200<br />

0.117<br />

0.012<br />

0.848<br />

Outlet 6"Ø pipe<br />

S_01<br />

0.636 0.200<br />

0.936<br />

Outlet 6"Ø pipe<br />

0.100<br />

0.100<br />

0.228<br />

0.691 0.691<br />

To be detailed<br />

0.050<br />

0.100<br />

150mm solid PCC block<br />

masonary in one layer only<br />

with 18mm thk plaster in<br />

two layer on inner side of I C<br />

4" thk pcc bed using 1:2:4 mix<br />

&20mm aggregates<br />

0.150<br />

0.698<br />

0.150<br />

0.848<br />

Ground<br />

4.016<br />

0.101<br />

0.150<br />

0.100<br />

0.666<br />

3.000<br />

Precast RCC frame<br />

RCC Side wall<br />

RCC slab<br />

0892m x0892 m precast RCC cover-slab<br />

1.050<br />

100.341f<br />

6" Øinlet pipe 8" Ø outlet pipe<br />

99.891<br />

0.304<br />

0.228 0.750<br />

0.150<br />

0.450<br />

0.362 0.362<br />

1.374<br />

1.524<br />

2.132<br />

0.228<br />

0.150<br />

0.100<br />

Precast RCC frame<br />

0.304<br />

250gsm geotextile barrier<br />

0.075 mm thick custom-made<br />

internal Ø 1.370m RCC rings<br />

with 6 perforations of Ø 75 mm.<br />

75 mm downgraded aggregates<br />

96.790<br />

96.540 depth of pit /<br />

hardcore starts above this<br />

DETAILS OF DRAINAGE COMPONENTS<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

SGS_civWORKSest_170614<br />

17 th June 2014<br />

PROJECT : UPGRADATION OF SCHOOL PLAYGROUND AT ST. GEROSA HIGH<br />

SCHOOL, MANGALORE<br />

Sl. No. Items of work/Description Quantity Unit Rate Total<br />

Playfield Grading<br />

Earthwork in excavation in cut and fill of playfield<br />

(30.765X0.150)/2 X 32.021 73.884 cum 617 45586.43<br />

1.0.0 Earthwork in filling<br />

Leveling work with excess soil to be spread over 73.884 cum 617 45586.43<br />

Contingencies and Sundries, Miscellaneous<br />

Total<br />

2.0.0 Galleries<br />

2.1.0 Northwest Gallery<br />

PCC bed in gallery levelling works<br />

13675.93<br />

104848.78<br />

Using 1:2:4 mix, including cost of material , scaffolding, transport, curing etc complete<br />

2.1.1<br />

0.012 X 32.776 X 8<br />

3.375 cum 7408 25002.00<br />

0.007 X 32.776 X 1<br />

Laterite Masonry in 1:5 CM<br />

Using 1:5 CM mortar, including cost of dressing , scaffolding, transport, curing etc complete<br />

2.1.2<br />

2.098 X 33.408<br />

0.047 X 33.408 71.659 cum 3600 71.65<br />

Plaster<br />

2.1.3 In 1:3 CM mix, 18mm thk plastered in 2 layers including cost of scaffolding, curing etc complete<br />

6.31 X 33.4 210.754 sqm 470 99054.38<br />

Factory brick cladding<br />

2.1.4 Fixing and grouting of 228x100x38mm wire cut bricks<br />

for gallery edge, including pointing 3152 no.s 25 78800<br />

Contingencies and Sundries<br />

2.1.5<br />

30439.2045<br />

Miscellaneous @ 15%<br />

Total<br />

233367.23<br />

2.2.0 North East Gallery<br />

earthwork in filling<br />

2.2.1<br />

1.669 X 62.617 104.508 cum 617 64481.30<br />

PCC bed in gallery levelling works<br />

2.2.2 Using 1:2:4 mix, including cost of material , scaffolding, transport, curing etc complete<br />

0.012 X 5 X 64.5 3.870 cum 7408 28668.96<br />

Plaster<br />

2.2.3 In 1:3 CM mix, 18mm thk plastered in 2 layers including cost of scaffolding, curing etc complete<br />

3.664 X 63.108 231.228 sqm 470 108677.02<br />

2.2.4 Factory brick cladding 3050 no.s 25 76250<br />

2.2.5 Contingencies and Sundries<br />

Miscellaneous 1/Estimate @ for 15% works related to Upgradation of St. Gerosa High School grounds<br />

Total<br />

41711.59<br />

319788.8727<br />

2.3.0<br />

2.3.1<br />

Southwest Gallery<br />

Earthwork excavation for gallery foundation<br />

.509 m 2 X 14.27 m = 7.16<br />

0.464X 10.198 = 4.731 11.896 cum 617 7339.83<br />

Earthwork in filling<br />

2.3.2<br />

2.181 m2 X 14.662 m 31.978 cum 617 19730.32<br />

Hardcore for foundations<br />

0.105 X 14.27<br />

2.3.3<br />

0.095 X 14.66<br />

0.240 X 14.66 6.408 cum 514 3293.712<br />

2.3.4 PCC works<br />

0.128 m 2 X 14.662<br />

0.128 m 2 X 14.27 3.703 cum 7408 27431.82<br />

2.3.5 PCC bed in gallery levelling works<br />

0.012 X 28.792 X 5 1.728 cum 7408 12797.47<br />

2.3.6 Laterite Masonry in 1:5 CM<br />

Using 1:5 CM mortar, including cost of dressing , scaffolding, transport, curing etc complete<br />

(1.294+ .055) X 14.077<br />

0.729 X 14.662 29.678 cum 3600 106842.50<br />

2.3.7 Plaster<br />

In 1:3 CM mix, 18mm thk plastered in 2 layers including cost of scaffolding, curing etc complete<br />

3.844 X 28.792 110.676 sqm 470 52017.93<br />

2.3.8 Factory brick cladding 1360 no.s 25 34000<br />

Contingencies and Sundries<br />

39518.04<br />

Miscellaneous @ 15%<br />

Total<br />

Total- Galleries<br />

302971.61<br />

856127.72<br />

3.0.0 Stormwater drainage<br />

3.1.0<br />

3.1.1<br />

NorthWest drains<br />

Earthwork in excavation works<br />

0.65 m 2 X 29.584 m 19.230 cum 617 11864.66<br />

3.1.2 Hardcore for foundations<br />

0.070 X 29.584 2.071 cum 514 1064.43<br />

3.1.3 PCC bed in drains<br />

0.093 m 2 X 29.584<br />

2.753 cum 7408 20394.22<br />

3.1.4 PCC to create L profile for placement of cover<br />

0.0147 X 2 X 29.584 0.870 cum 7408 6443.25<br />

3.1.5 PCC solid block masonry<br />

Using 1:5 CM mortar, including cost of scaffolding, transport, curing etc complete<br />

.0838 X 2 X 29.584 4.958 cum 3290 16312.74<br />

2/Estimate for works related to Upgradation of St. Gerosa High School grounds<br />

3.1.6 Plaster in drain<br />

1.339 X 29.584 39.613 sqm 470 18618.10<br />

3.1.7 RCC works- Precast<br />

Perforated covers as panels using nominal steel<br />

0.5 x .45 panel 65 units 340 22100<br />

3.1.8 Contigencies and sundries, Miscellaneous<br />

Total<br />

14519.61<br />

111317.02<br />

3.2.0 NorthEast drains<br />

3.2.1 earthwork in excavation works<br />

0.887 m 2 X 63.108 m 55.977 cum 617 34537.68<br />

3.2.2 Hardcore<br />

0.081 X 63.108 m<br />

5.112 cum 514 2627.438472<br />

3.2.3 PCC bed in drains<br />

0.108 X 63.108 6.816 cum 7408 50490.44<br />

3.2.3 PCC to create L profile for placement of cover<br />

0.016 X 2 X 63.108 2.019 cum 7408 14960.13<br />

3.2.4 PCC solid block masonry<br />

Using 1:5 CM mortar, including cost of scaffolding, transport, curing etc complete<br />

0.127 X 2 X 63.108 16.029 cum 3290 52736.83<br />

3.2.5 Plaster in drain<br />

2.127 X 63.108 134.231 sqm 470 63088.44<br />

3.2.6 RCC works- Precast<br />

Perforated covers as panels using nominal steel<br />

0.5 x .45 panel 140 units 440 61600<br />

3.2.7 Contigencies and sundries, Miscellaneous<br />

Total<br />

42006.14<br />

322047.10<br />

3.3.0 SouthEast Drains<br />

3.3.1 Earthwork in excavation works<br />

0.65 m 2 X 38.697 m 25.153 cum 617 15519.43<br />

3.3.2 Hardcore for foundations<br />

0.070 x 38.697 m 2.709 cum 514 1392.32<br />

3.3.3 PCC bed in drains<br />

0.093 X 38.697 3.599 cum 7408 26660.07<br />

3.3.4 PCC to create L profile for placement of cover<br />

0.016 X 2 X 38.697 1.238 cum 7408 9173.36<br />

3.3.5 PCC solid block masonry<br />

Using 1:5 CM mortar, including cost of scaffolding, transport, curing etc complete<br />

0.0838 X 2X 38.697 6.486 cum 3290 21337.68<br />

3.3.6 Plaster in drain<br />

1.339 X 38.697 51.815 sqm 470 24353.18<br />

3.3.7 RCC works- Precast<br />

Perforated covers as panels using nominal steel<br />

0.5 x .45 panel 85 units 340 28900<br />

3.3.8 Contigencies and sundries, Miscellaneous 19100.41<br />

total<br />

146436.44<br />

4.0.0 Gallery 3/Estimate Canopy for works related to Upgradation of St. Gerosa High School grounds<br />

Sloped corrugated galvalume lined steel frame canopy<br />

160 m 2 2421 387500<br />

for galleries<br />

Contigencies and sundries, Miscellaneous 58125<br />

TOTAL 445625<br />

Recharge Wells<br />

5.0.0<br />

5.1.0 Earthwork excavation for recharge detention tank<br />

5.430 X 2.653 X2 28.812 cum 617 17776.74<br />

Hardcore using 40 well<br />

5.2..0 mm downgraded macadam for recharge<br />

5.430 X 0.1X2 1.086 cum 514 558.20<br />

PCC works 5.3.0 in foundation<br />

5.430 X 0.15 X 2 1.629 cum 7408 12067.63<br />

Cast-in-situ RCC 5.4.0 works<br />

10500/<br />

Recharge pit cover<br />

cum<br />

3000/cov<br />

1.629 cum 23104.5<br />

5.43 X .15 X 2 no.s<br />

er for<br />

steel<br />

5.5.0 Perforated circular Rings 14 NO.S 4000 56000<br />

5.6.0 Geotextile 24.27 sqm 20 485.47<br />

5.7.0 Aggregates<br />

5.893 cum 550 3241.27<br />

2.8063 X 2.1<br />

5.8.0 Contigencies and sundries, Miscellaneous 16985.07313<br />

TOTAL 130218.894<br />

6.0.0 Reorganising Toilets<br />

Currently the students need to walk a considerable<br />

distance to reach the external toilets.<br />

46.451 m 2 16000 743216<br />

The toilets proposed to be reorganized to improve<br />

access and avoid crossing through playground.<br />

Contigencies and sundries, Miscellaneous 111482.4<br />

Total 854698.4<br />

External Illumination 100000<br />

Contigencies and sundries, Miscellaneous<br />

15000<br />

Total<br />

115000<br />

Grand Total<br />

3086319.36<br />

4/Estimate for works related to Upgradation of St. Gerosa High School grounds<br />

31<br />

PRELIMINARY ESTIMATE


32<br />

F AMNETIES @ ST. GEROSA HIGH SCHOOL, MANGALORE<br />

UPGRADATION OF AMNETIES @ ST. GEROSA HIGH SCHOOL, MAN<br />

PLAN<br />

Section _01<br />

1. The finishes allowances are as follows:<br />

12 mm thick plaster + 4 mm thk fixing mortar + 6-10 mm tile<br />

thickness<br />

2. Provide 3 mm thk spacer for tile both flooring and daddoing.<br />

epoxy grout of Dubond make shall be used. spacers shall be of<br />

PVC<br />

3. All toilet shutters will be Sintex make, single leaf with SS hinges<br />

TOILET REDESIGN<br />

TOILET REDESIGN<br />

TOILET REDESIGN<br />

0.500<br />

PLAN<br />

REORGANIZED PLAN- GIRLS’ TOILET<br />

SECTION<br />

ELEVATION P.T.O 33


SHOP<br />

PLAIN SITE<br />

SHOP<br />

7.87<br />

18.00<br />

MH<br />

MH<br />

MH<br />

1<br />

DEVELOPMENT OF FATHER MULLER ROAD,<br />

THE AVAILABLE SPACE COULD BE REORGANIZED WITH CONTINUITY OF<br />

PEDESTRIAN MOVEMENT TO OLD KANKANADY ROAD, CREATION OF PARKING<br />

FOR THE LATTER ROAD AND INCORPORATION OF PLANTING.<br />

NEFFICIENT/ INAPPROPRIATE USE OF AVAILABLE<br />

OCKET OF SPACE AT JUNCTION<br />

2<br />

CLOISTERED CARMEL<br />

3<br />

CHAOTIC TRAFFIC JUNCTION<br />

AS FOUR ROADS INTERSECT AT TWO DIFFERENT JUNCTIONS, THERE IS ABSOLUTE CHAOS<br />

THE RICKSHAWS COMPETE FOR SPACE WITH THE PEDESTRIANS FORCING<br />

THEM ONTO THE ONCOMING TRAFFIC. THE RICKSHAW OPERATORS FACE A<br />

HUGE STRESS DUE TO THIS CONSTANT CLASH AND LACK OF ADEQUATE<br />

PUBLIC INFRASTRUCTURE IN TERMS OF PUBLIC TOILETS, DRINKING WATER<br />

ETC.<br />

POORLY PLANNED RICKSHAW STAND<br />

4<br />

INAPPROPRIATE POSITIONING OF BUS STOPS<br />

THE CURRENT POSITION OF BUS STOPS CREATES STRAIN IN AVAILABILITY OF SPACE FOR<br />

THE USERS OF THE BUS STOP AS WELL AS THE PEDESTRIAN TRAFFIC.<br />

5<br />

6<br />

UNDERUTILIZED MARGINS OF LAND IN R.O.W<br />

THE PATCH OF LAND IS FENCED DENYING UTILITY TO THE NEEDS OF THIS ROAD AND CAUSING<br />

HUGE BOTTLENECK.<br />

THE POSITION OF TREES VIZ A VIZ THE CARRIAGEWAY COULD BE INTEGRATED INTO THE<br />

SCHEME AND USED TO SEGREGATE RICKSHAW LANE FROM MAIN CARRIAGEWAY<br />

INTEGRATION OF EXISTINGTREES IN THE SCHEME<br />

8<br />

7<br />

DANGEROUS CARRIAGEWAY EDGES<br />

LACK OF PATHWAYS FORCE PEDESTRIANS TO THE EDGE OF<br />

CARRIAGEWAY AT A GREAT RISK TO THEIR LIFE AND LIMBS.<br />

POOR PLACEMENT OF BUS STOPS<br />

THE LOCATION AND LAYOUT OF BUS STOPS MAKE SAFE CROSSING OF STREETS BY<br />

PEDESTRIANS DIFFICULT TO ORGANIZE.<br />

LAX ENFORCEMENT OF PARKING REGULA-<br />

TIONS FOR COMMERCIAL DEVELOPMENTS<br />

‘STOLEN PARKING’ OR CONVERSION OF SCHEDULED PARKING IN<br />

THE PREMISES TO RETAIL SPACE WHICH INTURN ADDS TO<br />

ENCROACHMENT OF PUBLIC SPACE FOR SUCH DEFICIT OF<br />

PARKING IN THE BUILDING. IN THIS CASE, BOTH SIDES OF THE<br />

ROAD ARE OCCUPIED BY THE VEHICLES COMING INTO THIS<br />

BUILDING.<br />

10<br />

11<br />

24.00<br />

UNINTELLIGENT PLANNING OF PEDESTRIAN<br />

CROSSINGS<br />

PEDESTRIAN CROSSINGS SHALL BE PLANNED IN RELATION TO PATHWAYS, INTERSECTIONS<br />

AND AMENITIES SUCH AS BUS STOPS ETC. THERE SHOULD BE SECURE MEANS OF<br />

MOVEMENT AND SHOULD BE EASILY IDENTIFIABLE.<br />

12<br />

THE WIDE AVAILABLE MARGINS ARE ENCROACHED UPON BY TRUCKS,<br />

CARS, AUTOS ETC.<br />

UNAUTHORIZED AND UNCHECKED PARKING<br />

MANGALORE<br />

THE FOLLY OF SIMPLY LAYING RCC CARRIAGEWAYS BELOW EXISTING, COMPROMISED<br />

SERVICES NETWORK WILL INEVITABLY RESULT IN SUCH INTERVENTIONS. THIS CAN BE<br />

SEEN AT OVER A DOZEN LOCATIONS ON THIS STRETCH AND IS UNACCEPTABLE.<br />

EVIDENCE FOR NEED OF SEPARATE SERVICE TRENCHES<br />

DWG NO: 01 ● PART 1/3 ● 12 AUG 2014<br />

DEVELOPMENT OF FATHER MULLER ROAD: ISSUE IDENTIFICATION<br />

THE CONCERNED DEPARTMENT SHOULD LOP TREES AT REGULAR INTERVALS. IF NOT THE<br />

FALLING OF BRANCHES CAUSE EXTENSIVE DAMAGE TO THE TREES THEMSELVES.<br />

MAINTENANCE OF TREES.<br />

18.00<br />

13<br />

ABSENCE OF SPEED LIMITORS<br />

THE ROAD HAS MANY FEEDER CROSS ROADS WHICH OFTEN ARE AT<br />

AN INCLINE, WITH VISIBILITY LIMITED BY TREE TRUNKS. THE MAIN<br />

ROAD TRAFFIC MOVING AT HIGH SPEED POSES SERIOUS DANGER TO<br />

INCOMING TRAFFIC.<br />

WRONG SELECTION OF SPECIES CAUSE PROBLEMS AT THE DEVELOPED STAGE OF THE<br />

TREE. HERE THE BANYAN TREE CONSUMES EXTENSIVE PEDESTRIAN SPACE AND HAS A<br />

VERY POOR LOOK TO IT UNLIKE THE TREES ADJACENT TO IT.<br />

SELECTION OF APPROPRIATE AVENUE TREES<br />

14<br />

THE AVENUE TREES REQUIRE PRUNING AT CRITICIAL STAGES TO<br />

GIVE IT PHYSICAL STABILITY.<br />

IN ITS ABSENCE THE OVERHANGING BRANCHES EVENTUALLY<br />

TOPPLE THE TREES OR BRANCHES COME CRASHING DOWN<br />

CAUSING DAMAGE TO LIFE AND PROPERTY.<br />

ABSENCE OF TREE SHAPING/PRUNING<br />

15<br />

16<br />

17<br />

18<br />

MODIFICATION OF ROAD PROFILE<br />

THE PROJECTING INCLINED RAMP OF BEARY’S VALENCIA DEVELOPMENT IS ILLEGAL<br />

AND CUTS OFF PHYSICAL CONNECTION BETWEEN 2ND AND 3RD CROSS ROADS.<br />

THE 2ND AND 3RD CROSS ROADS WHICH JOIN THE MAIN ROAD IN AN INCLINE, ENTER<br />

THE MAIN ROAD WITH HIGH SPEED TRAFFIC. NEEDS SPEEDBREAKERS AND ZEBRA<br />

CROSSINGS.<br />

DANGEROUS JUNCTION<br />

DWG NO: 01 ● PART 2/3 ● 12 AUG 2014<br />

DEVELOPMENT OF FATHER MULLER ROAD: ISSUE IDENTIFICATION<br />

19<br />

THE PLACEMENT AND SPACING OF YOUNG SAPLINGS HAS TO BE SO DONE THAT<br />

AFEQUATE SPACE IS AVAILABLE TO FUTURE WIDENING OF ROAD AND INCORPORA-<br />

TION OF RELATED INFRASTRUCTURE LIKE DRAINS, PATWAYS, ETC. IF NOT, MATURE<br />

TREES MAY NEED TO BE SACRIFICED ONCE THE NEED IS FELT FOR WIDENING. SAME<br />

HOLDS TRUE FOR SPACING IF ONE HAS TO GET CONTINUOUS SHADED AVENUE.<br />

SPACING IS TREE SPECIFIC AND NEEDS TO BE PLANNED IN ADVANCE.<br />

RIGHT PLACEMENT AND SPACING OF TREES<br />

ISSUE IDENTIFICATION<br />

20<br />

21<br />

DESTRUCTION OF EXISTING DRAINS AND PATHWAYS<br />

THE NEW SURFACING WITH RCC RESULTED IN CLOSURE OF EXISTING STORM WATER<br />

DRAIN AND COVERING OF EXISTING PEDESTRIAN PATHWAY CLAD WITH INTERLOCK<br />

PAVERS.<br />

THE PROXIMITY OF TRUNK OF TREE TO THE ONLY AVAILABLE SINGLE LANE POSES<br />

GREAT DANGER TO THE MOVING VEHICLES. TREES ON THIS STRETCH MAY NEED TO<br />

BE REMOVED FOR CREATION OF SECOND LANE.<br />

DANGER TO TRAFFIC FROM TREES<br />

22<br />

THERE BEING A LOT OF PEDESTRIAN TRAFFIC IN THIS STRETCH, THERE IS A STRONG<br />

NEED FELT FOR WIDE PEDESTRIAN PATHWAYS.<br />

LACK OF PEDESTRIAN PATHWAY<br />

The project was a brain-child of the principal architect to change<br />

the urban experience of one of the busiest roads in Mangalore.<br />

34<br />

Starting from a detailed analysis of the road and its uses, to the<br />

minutest details, I was involved single-handedly in draughting<br />

and detailing the entire project till I my internship ended there.<br />

35


EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

MH<br />

MH<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

EP<br />

BUS<br />

STOP<br />

W.C<br />

W.C<br />

TYPICAL SIGNAGES<br />

TYPICAL BUS SHELTER UNIT<br />

TYPICAL VIEWS<br />

TYPICAL ROAD EDGE PLANTERS<br />

The project concentrated on enhancing the experience of the all types of users of the road. For pedestrians, the walkways<br />

were enhanced, traffic signals were added, promenades were created with regularly placed trees and crossings<br />

were added. Street-lights have been places at regular intervals. For vehicle users, most importantly, clearly demarcated<br />

roads have been designed. The two way lanes are separated by dividers, that have been end at the entrance/exit<br />

of instituations. Drainage is another rectification done through this redesign.<br />

Public amneties are the high-point of the design with bus bays being provided for the first time, bus-stops being enhanced<br />

for user-comfort and aesthetics, rickshaw-stands being designed, public toilets and vendor stalls being added.<br />

This was a voluntary project and was represented to several heads of the city. environmentalists, social activists etc<br />

who unanminously nodded a yes toward this initiative that will further mark a huge change as a precursor in the urban<br />

design standards adopted by the city.<br />

HERITAGE<br />

HASSAN<br />

FATHER MULLER’S<br />

HOSPITAL<br />

RESIDENTIAL<br />

RICKSHAW BAY<br />

RICKSHAW LANE<br />

1.8290<br />

1.219x1. 1.219x1. 0 0<br />

CW<br />

CWS<br />

RESIDENTIAL<br />

VENDING KIOSKS<br />

CW<br />

SC<br />

SC<br />

SC<br />

CW<br />

VEHICLE PARKING LOT<br />

SP KANKANADY<br />

HOTEL<br />

BUS<br />

STOP<br />

109.228<br />

SC-1<br />

VALENCIA PARK<br />

VEHICLE PARKING LOT<br />

VEHICLE PARKING LOT<br />

FINALPLAN<br />

BUS<br />

STOP<br />

HOTEL RAJ KAMAL<br />

STOP<br />

3-WHLR TRUCK<br />

PARKING<br />

36<br />

SHOPS<br />

STOP<br />

MOTHER TERESA’S JN<br />

AMBULANCE PARKING<br />

CLOISTERED CARMEL<br />

CONVENT<br />

CW<br />

CW<br />

CW<br />

PROPOSAL<br />

P3<br />

PARK<br />

SARVA MANGALA<br />

P3<br />

CW<br />

37<br />

P-6<br />

COMPLEX<br />

P6<br />

CWE


CW<br />

CW<br />

P2 CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CWE<br />

CWS<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CWE<br />

CW<br />

CW<br />

CWS<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CW<br />

CWE<br />

CW<br />

CW<br />

LANE - 3 / 3.00 m<br />

LANE - 4 / 3.00 m<br />

P6<br />

LANE - 1 / 3.00 m<br />

LANE - 2 / 3.00 m<br />

MEDIAN / 0.45 m<br />

PEDESTRIAN PATHWAY / 3.00 m<br />

38<br />

STORM WATER DRAIN / 1.6 m<br />

PEDESTRIAN PATHWAY / 3.00 m<br />

SC<br />

SC 1<br />

SC<br />

P-9<br />

INLAND RESIDENCY<br />

CW<br />

P9<br />

P2<br />

P5<br />

P4<br />

CORPORATION<br />

BANK<br />

NT OF FATHER MULLER ROAD:<br />

P5<br />

REDESIGN PROPOS<br />

CW<br />

P5<br />

P5<br />

P-6<br />

SBI<br />

P4<br />

P4<br />

P-3<br />

SCHOOL OF SOCIAL<br />

SERVICE MANGALORE<br />

NATIONAL CADE<br />

' CORPS<br />

HQ MANGALORE<br />

FINALPLAN<br />

SHANTI NILAYA<br />

WHITE DOVE<br />

SP1<br />

SHOP<br />

Kaccha Shop<br />

SC<br />

P3<br />

SP-2<br />

FATIMA RETREAT HOUSE<br />

P3<br />

GRACE ICE CREAM<br />

PARLOUR<br />

ST JOSEPH'S SEMINARY<br />

SHANTI KENDRA<br />

BUILDING<br />

P-2<br />

PRERANA DENTAL CLINIC<br />

P3<br />

P3<br />

P3<br />

P7<br />

P-R<br />

MERCIAN COLLEGE<br />

P-7 BAJAJ<br />

SHOWROOM<br />

P1<br />

P1<br />

P1<br />

P1<br />

ST GEROSA HIGH SCHOOL<br />

ST JOSEPH'S INDUSTRIAL TRAINING<br />

CENTRE<br />

MH<br />

FATHER MULLER'S<br />

HOSTELS<br />

MH<br />

P1<br />

BEARY'S VALENCIA<br />

P1<br />

MH<br />

FINALPLAN<br />

BANANA PLANTATION<br />

P3 P3<br />

P-3<br />

HH SPLENDOR<br />

COCONUT PLANTATION<br />

P3<br />

P3<br />

CORP BANK<br />

BPCL PETROL PUMP<br />

22.8279<br />

INFANT MARY'S CONVENT<br />

SC1-<br />

RAJAN COFFEE WORKS<br />

TYPICAL<br />

ROAD SECTIONS<br />

SC<br />

SACILA AUTO ENGINEERING<br />

SC<br />

PRAVEEN AUTOMOBILES<br />

SC-1<br />

SC<br />

39


OFFICE<br />

FIRE<br />

ESCAPE<br />

CORRIDOR<br />

(LUGGAGE ROOM)<br />

DESIGN OF MIXED-USE HIGH RISE STRUCTURE<br />

R O A D 80' W I D E<br />

I joined Arkiteknik International Consulting Engineers when the conceptual form for<br />

this design had been adopted and the schematic design stage was on-going.<br />

E =492502.1020<br />

N =2786834.4430<br />

3<br />

REFERENCE POINT<br />

OF BUILDING<br />

Working with the Project Architect, Ar. Jai Shenoy, we adhered to the design brief of<br />

creating the most unique hotel in town.<br />

Located at the Sh. Zayed-Business Bay Area, the building had to be unique and<br />

aesthetic in its form as well as function.<br />

YOTEL<br />

I worked on the schematic design of the building, different interior layouts for the<br />

variety of hotel room sizes, presentation drawings for meetings and owner-developer<br />

demarcation for maintenance, among other drawings.<br />

RESIDENCE<br />

ENTRY/<br />

DROP OFF<br />

TO<br />

BUSINESS<br />

BAY<br />

MEP<br />

ROOM<br />

RESIDENTIAL<br />

ENTRANCE<br />

LOBBY<br />

CLUB<br />

ENTRANCE<br />

LOBBY<br />

CLUB ENTRY<br />

TRASH ROOM,<br />

RECYLCING,<br />

COMPACTOR,<br />

DIRTY<br />

LINEN<br />

COLLECTION<br />

LIFT<br />

LOBBY<br />

HOTEL<br />

ENTRANCE<br />

LOBBY<br />

HOTEL ENTRY<br />

SERVICE<br />

ENTRY<br />

SERV<br />

LIFT<br />

LOBBY<br />

SECURITY<br />

ROOM<br />

& GOODS<br />

RECEIVING<br />

TRUCK<br />

BAY<br />

LOADING &<br />

UNLOADING<br />

BAY<br />

FIRE CONTROL<br />

ROOM<br />

MALE<br />

TOILETS<br />

FEMALE<br />

TOILETS<br />

YOBOT<br />

65 m2<br />

R O A D 80' W I D E<br />

TO<br />

SHEIKH<br />

ZAYED<br />

ROAD<br />

WATER FEATURE<br />

LANDSCAPE AREA<br />

ENTRY<br />

EXIT<br />

ENTRY<br />

MAIN ROAD<br />

( SHEIKH ZAYED ROAD FRONT )<br />

40<br />

41


SERVICE<br />

ENTRY<br />

TRUCK<br />

BAY<br />

SERVICE /STAFF<br />

ENTRY<br />

TRUCK<br />

BAY<br />

MEP<br />

ROOM<br />

FIRE<br />

ESCAPE<br />

CORRIDOR<br />

TRASH ROOM,<br />

RECYLCING,<br />

COMPACTOR,<br />

SECURITY<br />

ROOM<br />

& GOODS<br />

RECEIVING<br />

HOUSE KEEPING<br />

& GENERAL<br />

STORAGE<br />

65M2<br />

CLEAN<br />

LINEN<br />

STORAGE<br />

45 M2<br />

STORAGE &<br />

WORKSHOP<br />

25 M2<br />

CREW<br />

QUARTERS<br />

180 m2<br />

MEP<br />

ROOM<br />

FIRE<br />

ESCAPE<br />

CORRIDOR<br />

TRASH ROOM,<br />

RECYLCING,<br />

COMPACTOR,<br />

SECURITY<br />

ROOM<br />

& GOODS<br />

RECEIVING<br />

RESIDENCE<br />

ENTRY/<br />

DROP OFF<br />

RESIDENTIAL<br />

ENTRANCE<br />

LOBBY<br />

OFFICE<br />

CLUB<br />

ENTRANCE<br />

LOBBY<br />

DIRTY<br />

LINEN<br />

COLLECTION<br />

LIFT<br />

LOBBY<br />

HOTEL<br />

ENTRANCE<br />

LOBBY<br />

SERV<br />

LIFT<br />

LOBBY<br />

LOADING &<br />

UNLOADING<br />

BAY<br />

FIRE CONTROL<br />

ROOM<br />

MALE<br />

TOILETS<br />

FEMALE<br />

TOILETS<br />

YOBOT<br />

(LUGGAGE ROOM)<br />

65 m2<br />

GENERAL<br />

STORAGE<br />

58 M2<br />

IT<br />

ROOM<br />

25 M2<br />

F&B<br />

STORAGE<br />

27 M2<br />

EQUIPMENT<br />

STORAGE<br />

38.95 M2<br />

MEP<br />

ROOM<br />

MEP<br />

ROOM<br />

WORKING<br />

OPERATION<br />

STOCK<br />

30 M2<br />

SERV<br />

LIFT<br />

LOBBY<br />

LAUNDRY<br />

SERV APT<br />

61.28 M2<br />

RESIDENCE<br />

ENTRY<br />

RESIDENTIAL<br />

ENTRANCE<br />

LOBBY<br />

OFFICE<br />

CLUB<br />

ENTRANCE<br />

LOBBY<br />

DIRTY<br />

LINEN<br />

COLLECTION<br />

LIFT<br />

LOBBY<br />

SERV<br />

LIFT<br />

LOBBY<br />

LOADING &<br />

UNLOADING<br />

BAY<br />

FIRE CONTROL<br />

ROOM<br />

MALE<br />

TOILETS<br />

FEMALE<br />

TOILETS<br />

TO<br />

BUSINESS<br />

BAY<br />

CLUB ENTRY<br />

HOTEL ENTRY<br />

PUMP ROOM<br />

MEP<br />

ROOM<br />

HOTEL<br />

ENTRANCE<br />

LOBBY<br />

YOBOT<br />

(LUGGAGE ROOM)<br />

65 m2<br />

TO<br />

SHEIKH<br />

ZAYED<br />

ROAD<br />

WATER FEATURE<br />

LANDSCAPE AREA<br />

ENTRY<br />

WATER TANK<br />

MEP<br />

SERVICES<br />

ESS<br />

Y<br />

CLUB ENTRY<br />

HOTEL ENTRY<br />

LANDSCAPE<br />

AREA<br />

EXIT<br />

PORTE<br />

COCHERE<br />

PLOT LIMIT<br />

TO<br />

SHEIKH<br />

ZAYED<br />

ROAD<br />

WATER FEATURE<br />

LANDSCAPE<br />

AREA<br />

ENTRY<br />

42<br />

MAIN ROAD<br />

( SHEIKH ZAYED ROAD FRONT )<br />

EXIT<br />

ENTRY<br />

43


FIRE<br />

EXIT<br />

GENTS<br />

SHOWER & SPA<br />

205 sqm<br />

TO<br />

GYM<br />

ABOVE<br />

LOUNGE<br />

TOWEL<br />

COUNTER<br />

FITNESS CENTER<br />

1091 sqm<br />

TO<br />

CLUB<br />

LOUNGE<br />

BELOW<br />

HOTEL ADMIN OFFICE<br />

220 sqm<br />

BOH CORRIDOR<br />

GENTS<br />

PRAYER ROOM & ABLUTION<br />

GENTS<br />

TOILET<br />

KITCHEN<br />

280 m2<br />

LADIES<br />

TOILETS &<br />

HAND WASH<br />

GENTS<br />

TOILETS &<br />

HAND WASH<br />

LADIES<br />

PRAYER ROOM & ABLUTION<br />

CLUB<br />

RECEPTION<br />

MEP<br />

ROOM<br />

SERV<br />

LIFT<br />

LOBBY<br />

LADIES<br />

SHOWER & SPA<br />

175 sqm<br />

LIFT<br />

EMERGENCY EXIT<br />

CORRIDOR<br />

MEP<br />

SERV<br />

LIFT<br />

LOBBY<br />

BOH<br />

PANTRY<br />

60sqm<br />

STORE<br />

MEP<br />

SERV<br />

LIFT<br />

LOBBY<br />

LADIES<br />

TOILET<br />

LADIES<br />

TOILET,SHOWER<br />

&<br />

DRESS CHANGE<br />

GENTS<br />

TOILET,SHOWER<br />

&<br />

DRESS CHANGE<br />

MEP<br />

SERV<br />

LIFT<br />

LOBBY<br />

RESTAURANT<br />

525 m2<br />

FIRE<br />

EXIT<br />

STORE<br />

MEETING<br />

ROOMS<br />

108 sqm<br />

MEETING<br />

ROOMS<br />

108sqm<br />

GLASS FLOOR<br />

CUT OUT<br />

(SEEN BELOW)<br />

DECK<br />

MISSION<br />

CONTROL<br />

&<br />

LOUNGE<br />

RESTAURANT<br />

DINING<br />

PRE-FUNCTION<br />

AREA<br />

CO-WORKING<br />

SPACE<br />

& COFFEE SHOP<br />

PRE-FUNCTION<br />

AREA<br />

DECK<br />

RESTAURANT<br />

OUTDOOR<br />

DINING<br />

136 sqm<br />

SEE THROUGH POOL WALL AT HIGH LEVEL<br />

MEETING<br />

ROOMS<br />

67.4 sqm<br />

POOL<br />

(ACCESS FROM RESTAURANT LEVEL)<br />

MEETING<br />

ROOMS<br />

67.4 sqm<br />

POOL<br />

DECK<br />

SWIMMING<br />

POOL<br />

POOL<br />

DECK<br />

MECHANICAL<br />

INFINITY POOL EDGE<br />

44<br />

45


ELECTRICAL<br />

LINEN STORE<br />

LINEN STORE<br />

LINEN STORE<br />

ELECTRICAL<br />

ELECTRICAL<br />

ELECTRICAL<br />

ROOM<br />

ROOM<br />

ROOM<br />

ROOM<br />

IDF<br />

ROOM<br />

IDF<br />

ROOM<br />

IDF<br />

ROOM<br />

LIFT<br />

LOBBY<br />

LIFT<br />

LOBBY<br />

LIFT<br />

LOBBY<br />

LIFT<br />

LOBBY<br />

PREMIUM CABIN UNITS - 20<br />

EXECUTIVE CABIN UNITS - 06<br />

VIP CABINS - 00<br />

No. OF FLOORS - 16<br />

PREMIUM CABIN UNITS - 18<br />

EXECUTIVE CABIN UNITS - 02<br />

VIP CABINS - 02<br />

No. OF FLOORS - 1<br />

TWO BED UNITS - 03<br />

ONE BED UNITS - 07<br />

STUDIO UNITS - 02<br />

No. OF FLOORS - 3<br />

TWO BED UNITS - 03<br />

ONE BED UNITS - 02 No. OF FLOORS - 1<br />

46<br />

47


ELECTRICAL<br />

LINEN STORE<br />

ROOM<br />

ELECTRICAL<br />

ROOM<br />

ELECTRICAL<br />

ROOM<br />

ELECTRICAL<br />

ROOM<br />

IDF<br />

ROOM<br />

LIFT<br />

LOBBY<br />

LIFT<br />

LOBBY<br />

TWO BED UNITS - 04<br />

ONE BED UNITS - 07<br />

STUDIO UNITS - 02<br />

No. OF FLOORS - 7<br />

TWO BED UNITS - 03<br />

ONE BED UNITS - 03 No. OF FLOORS - 2<br />

TWO BED UNITS - 02<br />

ONE BED UNITS - 03<br />

THREE BED UNITS - 02<br />

No. OF FLOORS - 3<br />

TWO BED UNITS - 02<br />

ONE BED UNITS - 03<br />

THREE BED LOFTS - 03<br />

No. OF FLOORS - 1<br />

48<br />

49


ELECTRICAL<br />

ROOM<br />

TWO BED UNITS - 02<br />

ONE BED UNITS - 03<br />

THREE BED LOFTS - 00<br />

No. OF FLOORS - 1<br />

50<br />

LAYOUT DESIGN Designing wall and furniture layouts for the high-rise tower. 51


PROJECT TITLE:<br />

UP<br />

DN<br />

UP<br />

DN<br />

FR90MIN<br />

FR90MIN<br />

FR90MIN<br />

FR2HR<br />

FR2HR<br />

FR90MIN<br />

FR2HR<br />

FIREMANS LIFT<br />

FR2HR<br />

FR90MIN<br />

FR90MIN<br />

UP<br />

UP<br />

UP<br />

TECHNIAL DRAFTING AND PRESENTATION<br />

AL SANDOS<br />

MANSION<br />

52<br />

LG+G+4P+HC+25 TYPICAL APARTMENT<br />

FR60MIN<br />

FR60MIN<br />

11<br />

11<br />

FR2HR<br />

BEDROOM<br />

CORRIDOR<br />

GROUND FLOOR PLAN<br />

2<br />

16<br />

8<br />

3<br />

2 2<br />

14<br />

FR90MIN<br />

FR90MIN<br />

11<br />

11<br />

FR60MIN<br />

FR60MIN<br />

E<br />

N<br />

S<br />

W<br />

LEGEND<br />

COMMON AREAS<br />

VERTICAL CIRCULATION<br />

LEGEND<br />

COMMON AREAS<br />

BEDROOM<br />

TOILET/BATHROOM<br />

KITCHEN<br />

LAUNDRY<br />

BALCONY<br />

VERTICAL CIRCULATION<br />

DESIGN OF MIXED-USE HIGH RISE STRUCTURE<br />

BELHAB<br />

TOWERS<br />

TOILET<br />

BEDROOM<br />

BEDROOM<br />

BEDROOM<br />

BEDROOM<br />

DRESSER<br />

TOTAL AREA: 73.17 m²<br />

LIVING<br />

BEDROOM<br />

TOILET<br />

CORR.<br />

DRESSER<br />

DRESSER<br />

DRESSER<br />

TOILET<br />

LIVING<br />

TOTAL AREA: 94.46 m²<br />

TOILET<br />

GUEST<br />

TOILET<br />

KITCHEN<br />

TOILET<br />

GUEST<br />

TOILET<br />

CORR.<br />

LIVING<br />

KITCHEN<br />

TOTAL AREA: 126.323 m²<br />

BEDROOM<br />

TOILET<br />

GARBAGE<br />

UP<br />

LIFT 5<br />

TOILET<br />

LIFT 4<br />

BEDROOM<br />

CORRIDOR<br />

LIFT LOBBY<br />

LIFT 1 LIFT 2<br />

KITCHEN<br />

LIFT 3<br />

LIVING<br />

TOTAL AREA: 92.96 m²<br />

TELEPHONE<br />

ROOM<br />

UP<br />

W.M.<br />

CABINET<br />

ELECTRICAL<br />

ROOM<br />

LIVING<br />

TOTAL AREA: 117.10 m²<br />

CORRIDOR<br />

KITCHEN<br />

GUEST<br />

TOILET<br />

CORR.<br />

TOILET<br />

TOILET<br />

TOILET<br />

GUEST<br />

TOILET<br />

GUEST<br />

TOILET<br />

DRESSER<br />

KITCHEN<br />

TOTAL AREA: 64.25 m²<br />

LIVING<br />

TOILET<br />

TOTAL AREA: 73.112 m²<br />

LIVING<br />

13th-17th FLOOR<br />

SCALE 1:150m / A3 SIZE<br />

Keeping the exoskeleton and service core of the already designed<br />

tower I was asked to design a layout for the typical floor plan of this<br />

high-rise structure.<br />

BEDROOM<br />

BEDROOM<br />

BEDROOM<br />

KITCHEN<br />

BEDROOM<br />

ELEVATION DESIGN<br />

AL JADAF WATER TRANSPORTATION STATION<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

PARAPET-1<br />

FFL +9675<br />

PARAPET-1<br />

FFL +9675<br />

PARAPET-1<br />

FFL +9675<br />

PARAPET-1<br />

FFL +9675<br />

PARAPET-1<br />

FFL +9675<br />

53<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

REFERENCE<br />

LVL +000<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

REFERENCE<br />

LVL +000<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

REFERENCE<br />

LVL +000<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

REFERENCE<br />

LVL +000<br />

ROOF FLOOR<br />

FFL +8125<br />

SSL +7875<br />

MEZZ. FLOOR<br />

FFL +4150<br />

SSL +4075<br />

GROUND FLOOR<br />

FFL +350<br />

SSL +200<br />

REFERENCE<br />

LVL +000


DOWNTOWN OPERA HOUSE<br />

54<br />

Structural Design of Water Feature at Downtown Opera House, Dubai.<br />

I got the opportunity to work closely with the principal architects and<br />

structural engineers of the project and gain valuable knowledge.<br />

55


REDESIGN OF APARTMENT BLOCKS<br />

AMAC AKOYA<br />

56<br />

As a part of the two-member group responsible for the project in the office, we were responsible for the redesign of<br />

parts of the tower blocks, submission of final, corrected technical drawings and site-visits.<br />

57


58<br />

On a relaxed day, you would probably find me reading books or writing.<br />

Art found me late, but ever since it did, it has been a constant companion!<br />

59<br />

Looking back I have always had a heightened interest in sketching. At this<br />

point, art and reading are two interests that take up most of my time, and<br />

happily so.


You may further contact me:<br />

LinkedIn: https://www.linkedin.com/pub/shershada-rauf/93/62b/103<br />

E-mail : congenial729@gmail.com<br />

Mobile : 00971528180364<br />

60<br />

61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!