21.09.2015 Views

Maire Tecnimont Has Been Awarded, in Consortium with Salini, The ...

Maire Tecnimont Has Been Awarded, in Consortium with Salini, The ...

Maire Tecnimont Has Been Awarded, in Consortium with Salini, The ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Comunicato Stampa<br />

24.11.2010<br />

n. 24<br />

MAIRE TECNIMONT HAS BEEN AWARDED, IN CONSORTIUM<br />

WITH SALINI, THE CONSTRUCTION OF THE NEW<br />

COPENAGHEN AND FREDERIKSBERG’S CITYRINGEN<br />

UNDERGROUND<br />

• Total amount of civil works: circa €1.7 BN, of which circa<br />

€700MN perta<strong>in</strong><strong>in</strong>g to <strong>Maire</strong> <strong>Tecnimont</strong> Group<br />

• Client: Metroselskabet, the Company who manages the City of<br />

Copenhagen’s Underground Network<br />

• Timel<strong>in</strong>e: <strong>with</strong><strong>in</strong> 2018<br />

• First important International project for the Infrastructure<br />

& Civil Eng<strong>in</strong>eer<strong>in</strong>g Bus<strong>in</strong>ess Unit<br />

Rome, 24 November 2010 – <strong>Maire</strong> <strong>Tecnimont</strong> S.p.A. announces that its<br />

ma<strong>in</strong> operat<strong>in</strong>g company <strong>Tecnimont</strong> S.p.A., <strong>in</strong> consortium <strong>with</strong> SALINI<br />

Costruttori S.p.A., has been awarded as preferred bidder by<br />

Metroselskabet I/S, the Company who manages the City of<br />

Copenhagen’s Underground Network, the north bound and south bound<br />

r<strong>in</strong>gs of Copenhagen and Frederiksberg’s underground “CITYRINGEN”.<br />

<strong>The</strong> consortia, that will operate as General Contractor, is composed of<br />

SALINI Costruttori S.p.A., as mandant, <strong>Tecnimont</strong> S.p.A., as mandatary.<br />

<strong>The</strong> civil works refer to the design and construction of two “s<strong>in</strong>gle track<br />

tunnel tubes” of approximately 16.2 Km, 17 stations and 4 wells for the<br />

construction of the two sections.<br />

More precisely, the project envisages the executive design, the<br />

management and execution of the works, as well as the environmental<br />

monitor<strong>in</strong>g along the entire life and safety coord<strong>in</strong>ation of the project,<br />

dur<strong>in</strong>g both the design and the construction phases.<br />

<strong>The</strong> overall value of the works amounts to circa €1.7 billion, of which<br />

circa €700 million perta<strong>in</strong><strong>in</strong>g to <strong>Maire</strong> <strong>Tecnimont</strong> Group.<br />

This project represents an important achievement for <strong>Maire</strong> <strong>Tecnimont</strong><br />

Group <strong>with</strong><strong>in</strong> the framework of the <strong>in</strong>ternationalisation process of the<br />

Infrastructure & Civil Eng<strong>in</strong>eer<strong>in</strong>g Bus<strong>in</strong>ess Unit.<br />

<strong>The</strong> project’s completion is expected by the end of 2018.<br />

<strong>Maire</strong> <strong>Tecnimont</strong> SpA<br />

Via di Vann<strong>in</strong>a 88/94, 00156 Roma, Italia<br />

T +39 06 4122351 F +39 06412235610<br />

Viale Monte Grappa 3, 20124 Milano, Italia<br />

T +39 02 63131 F +39 02 63139777


Comunicato Stampa<br />

24.11.10<br />

n. 24<br />

<strong>Maire</strong> <strong>Tecnimont</strong> SpA<br />

<strong>Maire</strong> <strong>Tecnimont</strong> S.p.A. is the parent company of an Eng<strong>in</strong>eer<strong>in</strong>g & Construction<br />

International <strong>in</strong>dustrial group which operates <strong>in</strong> three sectors: Oil, Gas &<br />

Petrochemicals, Power, Civil Eng<strong>in</strong>eer<strong>in</strong>g & Infrastructure. Today, the Group,<br />

quoted on the Milan Bourse, is present <strong>in</strong> approximately 30 Countries, currently<br />

controls over 50 operative companies and can rely on a workforce of about<br />

5,100 employees, of which more than half are located abroad. At 31 December<br />

2009, the Group reported Revenues of €2,164 million and Net <strong>in</strong>come, after<br />

m<strong>in</strong>orities, of €77 million. For further <strong>in</strong>formation: www.mairetecnimont.it.<br />

Media Relations<br />

Investor Relations<br />

Carlo Nicolais<br />

Lawrence Y. Kay<br />

public.affairs@mairetecnimont.it Tel +39 06 412235.536<br />

Image Build<strong>in</strong>g Fax +39 06 412235.644<br />

Simona Raffaelli, Alfredo Mele,<br />

<strong>in</strong>vestor-relations@mairetecnimont.it<br />

Claudia Arrigh<strong>in</strong>i<br />

Tel +39 02 89011300<br />

mairetecnimont@imagebuild<strong>in</strong>g.it<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!