PBPL<br />
8 June 2012<br />
<strong>Port</strong> <strong>of</strong> <strong>Brisbane</strong> <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong><br />
LEASEHOLDER GUIDE<br />
4 Responsibilities<br />
Table 4.1 outlines the responsibility and control <strong>of</strong> the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong>.<br />
Table 4.1 Assignment <strong>of</strong> Responsibility<br />
Assignee Responsibility Timeframe Records<br />
PBPL<br />
Liaison Personnel – PBPL is to<br />
identify a liaison person<br />
responsible for actions required<br />
by PBPL under this <strong>Soil</strong> <strong>Disposal</strong><br />
<strong>Plan</strong>.<br />
Prior to the<br />
implementation <strong>of</strong><br />
the <strong>Plan</strong><br />
Record the details<br />
<strong>of</strong> the liaison<br />
person in this plan<br />
Issue <strong>of</strong> the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> (<br />
<strong>Part</strong> 2) to the leaseholder<br />
following advice <strong>of</strong> a soil<br />
movement.<br />
As required<br />
Review and advice <strong>of</strong> the<br />
proposed assessment under the<br />
<strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> proposed by<br />
the leaseholder<br />
As required<br />
Retain notification<br />
records and PBPL<br />
advice<br />
Data management <strong>of</strong> soil<br />
movement in accordance with<br />
this <strong>Plan</strong>.<br />
As required<br />
Development <strong>of</strong> a<br />
system for data<br />
management for<br />
each lease area.<br />
<strong>Leaseholder</strong><br />
Implement the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong><br />
for any works likely to result in<br />
soil excavation.<br />
Project basis<br />
Records as per the<br />
<strong>Plan</strong>.<br />
Complete the reporting<br />
requirements <strong>of</strong> the <strong>Soil</strong> <strong>Disposal</strong><br />
<strong>Plan</strong> and submit to the <strong>Port</strong> <strong>of</strong><br />
<strong>Brisbane</strong> representative.<br />
30 days following<br />
completion.<br />
Reports as per the<br />
<strong>Plan</strong>.<br />
Maintain a record <strong>of</strong> soil disposal<br />
activity from the site.<br />
Period <strong>of</strong> the lease,<br />
or 7 years,<br />
whichever is the<br />
least.<br />
Reports as<br />
required by this<br />
<strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong>.<br />
AS121308-6 5