PBPL<br />

8 June 2012<br />

<strong>Port</strong> <strong>of</strong> <strong>Brisbane</strong> <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong><br />

LEASEHOLDER GUIDE<br />

4 Responsibilities<br />

Table 4.1 outlines the responsibility and control <strong>of</strong> the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong>.<br />

Table 4.1 Assignment <strong>of</strong> Responsibility<br />

Assignee Responsibility Timeframe Records<br />

PBPL<br />

Liaison Personnel – PBPL is to<br />

identify a liaison person<br />

responsible for actions required<br />

by PBPL under this <strong>Soil</strong> <strong>Disposal</strong><br />

<strong>Plan</strong>.<br />

Prior to the<br />

implementation <strong>of</strong><br />

the <strong>Plan</strong><br />

Record the details<br />

<strong>of</strong> the liaison<br />

person in this plan<br />

Issue <strong>of</strong> the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> (<br />

<strong>Part</strong> 2) to the leaseholder<br />

following advice <strong>of</strong> a soil<br />

movement.<br />

As required<br />

Review and advice <strong>of</strong> the<br />

proposed assessment under the<br />

<strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> proposed by<br />

the leaseholder<br />

As required<br />

Retain notification<br />

records and PBPL<br />

advice<br />

Data management <strong>of</strong> soil<br />

movement in accordance with<br />

this <strong>Plan</strong>.<br />

As required<br />

Development <strong>of</strong> a<br />

system for data<br />

management for<br />

each lease area.<br />

<strong>Leaseholder</strong><br />

Implement the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong><br />

for any works likely to result in<br />

soil excavation.<br />

Project basis<br />

Records as per the<br />

<strong>Plan</strong>.<br />

Complete the reporting<br />

requirements <strong>of</strong> the <strong>Soil</strong> <strong>Disposal</strong><br />

<strong>Plan</strong> and submit to the <strong>Port</strong> <strong>of</strong><br />

<strong>Brisbane</strong> representative.<br />

30 days following<br />

completion.<br />

Reports as per the<br />

<strong>Plan</strong>.<br />

Maintain a record <strong>of</strong> soil disposal<br />

activity from the site.<br />

Period <strong>of</strong> the lease,<br />

or 7 years,<br />

whichever is the<br />

least.<br />

Reports as<br />

required by this<br />

<strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong>.<br />

AS121308-6 5