16.09.2015 Views

Port of Brisbane Soil Disposal Plan Part 2 Leaseholder Guide

Port of Brisbane Soil Disposal Plan Part 2 Leaseholder Guide

Port of Brisbane Soil Disposal Plan Part 2 Leaseholder Guide

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PBPL<br />

8 June 2012<br />

<strong>Port</strong> <strong>of</strong> <strong>Brisbane</strong> <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong><br />

LEASEHOLDER GUIDE<br />

3 When does the <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> apply?<br />

The <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> applies to any soil proposed to be excavated within land owned by<br />

PBPL, irrespective <strong>of</strong> volume, leaseholder, location or purpose. Different categories <strong>of</strong> soil<br />

movement are managed through the plan as described in the following.<br />

1) <strong>Soil</strong> movements between the lease areas.<br />

2) Movement <strong>of</strong> soil <strong>of</strong>f PBPL Land from lease areas listed on the EMR or CLR.<br />

3) Movement <strong>of</strong> soil <strong>of</strong>f PBPL Land from lease areas not listed on the EMR or CLR.<br />

Movement <strong>of</strong> soil from one PBPL Lot to another PBPL Lot is considered the same as moving<br />

soil <strong>of</strong>f PBPL land and the same approval process applies.<br />

This plan does not apply to on-going placement <strong>of</strong> dredged material associated with port<br />

reclamation works specified under ERA 16.<br />

The <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> does not provide regulatory context for the development or activity<br />

that will result in the generation <strong>of</strong> the excavated soil. In some instances planning<br />

requirements for a particular development or activity may be required in conjunction with the<br />

requirements <strong>of</strong> this plan.<br />

The <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong> applies prior to the commencement <strong>of</strong> soil excavation and<br />

should be consulted and followed as part <strong>of</strong> the planning process for the<br />

development or activity.<br />

AS121308-6 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!