Port of Brisbane Soil Disposal Plan Part 2 Leaseholder Guide
Port of Brisbane Soil Disposal Plan Part 2 Leaseholder Guide
Port of Brisbane Soil Disposal Plan Part 2 Leaseholder Guide
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PBPL<br />
8 June 2012<br />
<strong>Port</strong> <strong>of</strong> <strong>Brisbane</strong> <strong>Soil</strong> <strong>Disposal</strong> <strong>Plan</strong><br />
LEASEHOLDER GUIDE<br />
Prepared by:<br />
Authorised by:<br />
Name: Fiona Robinson Name: Neil Woodbridge<br />
Title: Manager Title: Manager<br />
Phone: 02 4962 5444 Phone: 02 9954 8100<br />
Email: frobinson@environcorp.com Email: nwoodbridge@environcorp.com<br />
Signature: Date:8/6/12 Signature: Date: 8/6/12<br />
This document is issued to <strong>Port</strong> <strong>of</strong> <strong>Brisbane</strong> for the purposes <strong>of</strong> providing guidance for disposal <strong>of</strong> soil<br />
from <strong>Port</strong> <strong>of</strong> <strong>Brisbane</strong> properties. It should not be used for any other purpose.<br />
The report must not be reproduced in whole or in part except with the prior consent <strong>of</strong> ENVIRON<br />
Australia Pty Ltd and subject to inclusion <strong>of</strong> an acknowledgement <strong>of</strong> the source. No information as to<br />
the contents or subject matter <strong>of</strong> this document or any part there<strong>of</strong> may be communicated in any<br />
manner to any third party without the prior consent <strong>of</strong> ENVIRON Australia Pty Ltd.<br />
Whilst reasonable attempts have been made to ensure that the contents <strong>of</strong> this report are accurate<br />
and complete at the time <strong>of</strong> writing, ENVIRON Australia Pty Ltd disclaims any responsibility for loss or<br />
damage that may be occasioned directly or indirectly through the use <strong>of</strong>, or reliance on, the contents<br />
<strong>of</strong> this report.<br />
© ENVIRON Australia Pty Ltd<br />
VERSION CONTROL RECORD<br />
Document Name Date Version Author Reviewer<br />
SDP_PoB_#308_P2_Ma<br />
r 12<br />
SDP_PBPL_#308_Apr12<br />
<strong>Part</strong> 2<br />
SDP_PBPL_#308_Apr12<br />
<strong>Part</strong> 2<br />
SDP_PBPL_#308_Jun12<br />
<strong>Part</strong> 2<br />
29 March 2012 Draft 1 Fiona Robinson Neil Woodbridge<br />
16 April 2012 Draft 2 Fiona Robinson Neil Woodbridge<br />
30 April 2012 Draft 3 Fiona Robinson Neil Woodbridge<br />
8 June 2012 FINAL Fiona Robinson Neil Woodbridge<br />
AS121308-6<br />
i