2013/2014
SHIPPING HANDBOOK - Port of Brisbane SHIPPING HANDBOOK - Port of Brisbane
Berth details continued Wharf Operator/Owner Wharf Use* Wharf Length (m) Berth pocket Length x Width (m) Shell Shell Company of Australia Petroleum products 74 234 x 35 10.9 Nominal Depth LAT # (m) BP Crude BP Oil Australia Crude oil/feedstocks discharge, load and discharge petroleum products BP Products BP Oil Australia Petroleum products load and unload LPG 329 329 x50 14.3 235 235 x 35 10.9 Grain Graincorp / PBPL Grain, woodchips, cottonseed exports, motor vehicles 285 285 x 45 13 Pinkenba Bulk Terminal Graincorp / PBPL Grain, silica sand, other dry-bulk handling, general cargo, soya bean meal, fertiliser 314 360 x 35 10.4 Cement Australia Cement Australia Bulk clinker, gypsum, slag imports and plasterboard 133 200 x 35 9.7 Bulk Berth No 1 Qld Bulk Handling Pty Ltd/PBPL Coal exports 240 317 x 50 14 Incitec North Incitec Ltd Bulk liquid and bulk dry fertiliser 123 210 x 35 10 14 | Shipping Handbook 2013/14
Services Equipment and Facilities Electricity Telephone (not for ship)/Water/ Fuel oil (by barge)/ Telephone (mobile – through agent) Diesel oil/Telephone (not for ship)/Water/Fuel oil (by barge)/ Telephone (mobile – through agent) Electricity/Telephone/Water Two 200mm white oil lines, one 250mm black oil line, one 250mm bitumen line, and one 200mm lube oil line Discharge and bunkering: 200–900tph One 100mm AGO bunker line Load: 100tph. One 150mm LPG pipeline Load and discharge: 100tph Crude oil/feedstocks: two 300mm booms connected to one 500mm pipeline Discharge rate: 3,200tph Petroleum products: one 200mm boom connected to one 200mm pipeline Load/discharge rate: 450tph Petroleum products: two 200mm booms with two 200mm pipelines. Load/discharge 400–900tph (gas oil), 380tph (motor spirits). LPG: (for BP) one 150mm pipeline for liquid and one 80mm for vapour; (for Origin) one 250mm pipeline for liquid, one 100mm for vapour Grain loading: up to 1,500tph Silo storage: 60,000t Woodchips loading: 700tph Cottonseed loading: 600tph Sugar/cottonseed shed: 40,000t Pad storage: 100,000t Electricity/Telephone/Water Total storage shed: 80,000t Total silo storage: 62,000t Total open area: 25,000t Mobile gantry loader. Load up to 1,200tph Two import hoppers each 300tph. Direct to truck Direct to silo. Direct to shed Terminal hardstand 1.0ha Electricity/Telephone/Water Cement clinker: receival hopper with travelling grab crane bucket Discharge: up to 400tph. Storage shed: 30,000t Storage shed: 80,000t Storage shed: 5,000t Electricity/Telephone/Water Coal loading up to 3,000tph. Average 2,000tph Stockpile storage: 900,000t Receival by rail: average 2,000tph Electricity/Water Bulk-cargoes: loaded into two 30ft hoppers using ship cranes Storage capacity: 50,000t Bulk liquids storage: Sulphuric 15,100t, caustic soda 5,500t Shipping Handbook 2013/14 | 15
- Page 1: SHIPPING HANDBOOK 2013/2014
- Page 4 and 5: The Black-winged Stilt, along with
- Page 6 and 7: Who we are The Port of Brisbane Pty
- Page 8 and 9: 4 | Shipping Handbook 2013/14
- Page 10 and 11: 6 | Shipping Handbook 2013/14
- Page 12 and 13: 8 | Shipping Handbook 2013/14
- Page 14 and 15: Port facilities Container terminals
- Page 16 and 17: Berth details Wharf Operator/Owner
- Page 20 and 21: Berth details continued Wharf Opera
- Page 22 and 23: 18 | Shipping Handbook 2013/14
- Page 24 and 25: navigation and operation Harbour Ma
- Page 26 and 27: Height The height under the Brisban
- Page 28 and 29: A range of maritime-specific securi
- Page 30 and 31: 26 | Shipping Handbook 2013/14
- Page 32 and 33: Shipping Agents Agency Tel: Fax: Re
- Page 34 and 35: Shipping Agents continued Agency Te
- Page 36 and 37: Shipping Agents continued Agency Te
- Page 38 and 39: Liner services by region Region Shi
- Page 40 and 41: Liner services by region continued
- Page 42 and 43: Liner services by region continued
- Page 44 and 45: Liner services by region continued
- Page 46 and 47: Liner services by region continued
- Page 48 and 49: Shipping alliances AAA Frequency: 7
- Page 50 and 51: 46 | Shipping Handbook 2013/14
- Page 52 and 53: 48 | Shipping Handbook 2013/14 BCT
- Page 54 and 55: Port limits The Port of Brisbane’
- Page 56 and 57: N Boral Plasterboards 28 BP Product
- Page 58 and 59: Key Contacts and Emergency Services
- Page 60 and 61: Consulate of France Ph: (07) 3229 8
- Page 62 and 63: Barry Taylor & Partners Customs Bro
- Page 64 and 65: Paccon Logistics Pty Ltd Unit 7, 58
- Page 66 and 67: Det Norske Veritas Marine Surveyors
Services<br />
Equipment and Facilities<br />
Electricity<br />
Telephone (not for ship)/Water/<br />
Fuel oil (by barge)/ Telephone<br />
(mobile – through agent)<br />
Diesel oil/Telephone (not for<br />
ship)/Water/Fuel oil (by barge)/<br />
Telephone (mobile – through<br />
agent)<br />
Electricity/Telephone/Water<br />
Two 200mm white oil lines, one 250mm black oil line,<br />
one 250mm bitumen line, and one 200mm lube oil line<br />
Discharge and bunkering: 200–900tph<br />
One 100mm AGO bunker line<br />
Load: 100tph. One 150mm LPG pipeline<br />
Load and discharge: 100tph<br />
Crude oil/feedstocks: two 300mm booms connected to one 500mm pipeline<br />
Discharge rate: 3,200tph<br />
Petroleum products: one 200mm boom connected to one 200mm pipeline Load/discharge<br />
rate: 450tph<br />
Petroleum products: two 200mm booms with two 200mm pipelines.<br />
Load/discharge 400–900tph (gas oil), 380tph<br />
(motor spirits).<br />
LPG: (for BP) one 150mm pipeline for liquid and one 80mm for vapour; (for<br />
Origin) one 250mm pipeline for liquid, one 100mm for vapour<br />
Grain loading: up to 1,500tph<br />
Silo storage: 60,000t<br />
Woodchips loading: 700tph<br />
Cottonseed loading: 600tph<br />
Sugar/cottonseed shed: 40,000t<br />
Pad storage: 100,000t<br />
Electricity/Telephone/Water Total storage shed: 80,000t<br />
Total silo storage: 62,000t<br />
Total open area: 25,000t<br />
Mobile gantry loader. Load up to 1,200tph<br />
Two import hoppers each 300tph. Direct to truck<br />
Direct to silo. Direct to shed<br />
Terminal hardstand 1.0ha<br />
Electricity/Telephone/Water Cement clinker: receival hopper with travelling grab crane bucket<br />
Discharge: up to 400tph. Storage shed: 30,000t<br />
Storage shed: 80,000t<br />
Storage shed: 5,000t<br />
Electricity/Telephone/Water Coal loading up to 3,000tph. Average 2,000tph<br />
Stockpile storage: 900,000t<br />
Receival by rail: average 2,000tph<br />
Electricity/Water<br />
Bulk-cargoes: loaded into two 30ft hoppers using ship cranes<br />
Storage capacity: 50,000t<br />
Bulk liquids storage: Sulphuric 15,100t, caustic soda 5,500t<br />
Shipping Handbook <strong>2013</strong>/14 | 15