18.09.2012 Views

RUAG Aerospace Structures Precision … Passion … Performance

RUAG Aerospace Structures Precision … Passion … Performance

RUAG Aerospace Structures Precision … Passion … Performance

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Program Management – keeping the overview<br />

Top priority has compliance with contractual<br />

obligations toward our end customers ensuring<br />

and coordinating both current production<br />

and activities in design areas.<br />

We generate confidence at customers and<br />

suppliers through long-term business relations.<br />

Apart from ensuring current series programs<br />

and managing customer and special projects,<br />

defined central objectives of program man-<br />

Supply Chain Management<br />

SCM, as we define it, is procurement + production control/material planning + logistics.<br />

Total cost of ownership and first time right is our SCM guideline. We pursue a long-term<br />

improvement of our performance to increase our competitiveness to the customer’s benefit.<br />

Our experience:<br />

• Supplier market research, evaluation<br />

development, selection, monitoring<br />

• Contract, risk and tool management<br />

• Packaging and freight management<br />

• LEAN approach<br />

• KANBAN, free stock, line feeding<br />

• Customs<br />

agement include preparation of sound<br />

partner selection criteria within responsibility<br />

and risk areas allocated in aviation<br />

industry.<br />

Interdisciplinary management of partial<br />

projects under design-to-build and buildto-print<br />

contracts is effected in due consideration<br />

of schedule and quality while<br />

meeting technical requirements.<br />

Legal<br />

HQ<br />

R&D<br />

Procurement<br />

Board<br />

Q<br />

Production Control<br />

& Logistics<br />

IT<br />

To ensure and extend the product portfolio<br />

into the future, we prepare, across<br />

the disciplines, proposals considering<br />

high-value and time-relevant customer<br />

demands; thorough responsibility for<br />

both proposal concepts in acquisition<br />

phase and project-based implementation<br />

after contract awarding will always<br />

ensure compliance with demands and<br />

customer satisfaction.<br />

HR<br />

FI-CO<br />

Sales &<br />

Program<br />

Collaboration of all departments<br />

Design, R&D, Testing – setting the standards<br />

Design<br />

Production support of in-house built components:<br />

• Current production of Airbus A320 family and Bombardier CRJ 700/900/1000<br />

• Engineering support for modifications, redesign and cost-saving investigations<br />

Development<br />

Participation in several new aircraft projects:<br />

• 3D design, fatigue and stress analysis of major primary structures,<br />

using standard, customized and in-house tools<br />

Research<br />

Participation in national research programs about new technologies:<br />

• Welding technology for metallic joints<br />

• Hybrid structures<br />

• Composites for high temperature applications<br />

• In-house research program for bonding technologies<br />

Tooling Design – leading to a most efficient production<br />

Jigs and tools design defines the built philosophy<br />

and qualifies it through all processes<br />

as well as FAI.<br />

The tool design is the key to a most efficient<br />

production of complex aerospace<br />

structures.<br />

Next generation design study of full CFRP tail cone<br />

With state-of-the-art CAD-systems, our<br />

best educated designers generate:<br />

• Assembly conception<br />

• Tooling design<br />

• Tooling management<br />

• Tooling check with laser tracker systems<br />

Assembly – processing 120,000 rivets per day<br />

The focus of our production ranges from<br />

individual components to complete assemblies<br />

for the aviation industry.<br />

State-of-the-art production facilities and<br />

machinery are the perfect basis for our<br />

performance.<br />

• Structural parts for center wing box,<br />

rear fuselage sections and tail cones for<br />

Airbus A320 family<br />

• Large fuselage side shells and floor<br />

sections for Airbus A320 family<br />

• Rear pressure bulkhead for Airbus<br />

A320 family<br />

• Fuselage shells for Airbus A330/A340<br />

family<br />

• Rear fuselage sections/tail cones and<br />

bulkheads for the Bombardier CRJ-series<br />

System Installation<br />

Customer Support<br />

Aircraft Life Extension – increasing cost effectiveness<br />

To increase the Design Service Goal (DSG)<br />

of the Airbus A320 family, a test program<br />

for large components including e.g. a Full<br />

Scale Fatigue Test (FSFT) has been developed.<br />

The three test sections of the A320<br />

with its forward fuselage (NEF1), center<br />

Beside the assembly of large fuselage<br />

structures, our competence encompasses<br />

system integration depending on customer’s<br />

requirements.<br />

For the Airbus A320 family, we integrate<br />

system components and electrical installation<br />

into the rear fuselage section.<br />

With the increasing use of technology in modern times, there is a growing requirement<br />

to provide tailored customer support. In response to market needs, our task is to operate<br />

a 24/7 AOG and spare parts service.<br />

fuselage & wing (NEF2) and rear fuselage<br />

are integrated into the testing environment.<br />

Based on the results, a calculation follows<br />

to ensure the required aircraft life extension<br />

to be achieved. Thus, the mainte-<br />

Production share on Airbus A320 family<br />

Production share on CRJ 700/900/1000 series<br />

nance program as well as flight cycles and<br />

flight hours will be readjusted.<br />

To the aircraft operators, <strong>RUAG</strong> <strong>Aerospace</strong><br />

<strong>Structures</strong> offers the complete support for<br />

FSFT and the entire calculated verification.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!