FlowCERT
Flow Cert Second Edition.pdf - Pulsar Process Measurement
Flow Cert Second Edition.pdf - Pulsar Process Measurement
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Preparation for Operation<br />
Before switching on, check the following:<br />
Maintenance<br />
<strong>FlowCERT</strong> is mounted correctly and is in a ‘safe’ area.<br />
The power supply is correctly installed.<br />
The voltage selector switch is in the correct position.<br />
The relays are connected correctly.<br />
There are no user serviceable parts inside <strong>FlowCERT</strong>, except the mains<br />
fuse. If you experience any problems with the unit, then please contact<br />
Pulsar Process Measurement for advice.<br />
To clean the equipment, wipe with a damp cloth. Do not use any solvents on<br />
the enclosure.<br />
Important Information<br />
The unique DATEM software comes into operation as soon as power is<br />
applied, and is designed to monitor a moving level or target with the<br />
transducer in a fixed position.<br />
If, after any period of use, it should become necessary to move the<br />
transducer, for any reason, from its original operating position, switch off<br />
the <strong>FlowCERT</strong>, before proceeding, in order to prevent any undesirable<br />
updates to the DATEM trace. If after moving the transducer the reading is<br />
not as expected please refer to Chapter 8 Troubleshooting.<br />
Page 15