07.09.2015 Views

FlowCERT

Flow Cert Second Edition.pdf - Pulsar Process Measurement

Flow Cert Second Edition.pdf - Pulsar Process Measurement

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Preparation for Operation<br />

Before switching on, check the following:<br />

Maintenance<br />

<strong>FlowCERT</strong> is mounted correctly and is in a ‘safe’ area.<br />

The power supply is correctly installed.<br />

The voltage selector switch is in the correct position.<br />

The relays are connected correctly.<br />

There are no user serviceable parts inside <strong>FlowCERT</strong>, except the mains<br />

fuse. If you experience any problems with the unit, then please contact<br />

Pulsar Process Measurement for advice.<br />

To clean the equipment, wipe with a damp cloth. Do not use any solvents on<br />

the enclosure.<br />

Important Information<br />

The unique DATEM software comes into operation as soon as power is<br />

applied, and is designed to monitor a moving level or target with the<br />

transducer in a fixed position.<br />

If, after any period of use, it should become necessary to move the<br />

transducer, for any reason, from its original operating position, switch off<br />

the <strong>FlowCERT</strong>, before proceeding, in order to prevent any undesirable<br />

updates to the DATEM trace. If after moving the transducer the reading is<br />

not as expected please refer to Chapter 8 Troubleshooting.<br />

Page 15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!