07.09.2015 Views

FlowCERT

Flow Cert Second Edition.pdf - Pulsar Process Measurement

Flow Cert Second Edition.pdf - Pulsar Process Measurement

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Watchdog<br />

You can check how many times the unit has been switched on, and look at<br />

the date and time of the last ten starts. This can be useful if there have been<br />

power failures or if for any reason the <strong>FlowCERT</strong> restarts due to a fault<br />

condition. The <strong>FlowCERT</strong> can be backed up from a battery which<br />

automatically cuts in during power failure, battery backed up units will<br />

continue uninterrupted operation and therefore will not register a loss of<br />

mains power. If, however, the battery were to fail during a mains power<br />

interruption, a start up would be recorded once power has been restored.<br />

The following parameters can be accessed by directly entering the parameter<br />

number. To do this, enter the program mode and then type in the<br />

appropriate parameter number.<br />

P940 Number of Starts<br />

This parameter shows how many times the unit has been powered up.<br />

P941-P960 Start Date & Time<br />

Parameters P941 and P942 show the date and time that the unit was last<br />

started. There are ten start dates & times recorded, which are parameters<br />

P943-P960. The first on the list are the most recent, and the last ones are the<br />

oldest. These are read only, and cannot be changed.<br />

Page 141

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!